FA9451-21-S-0001_Call_0006_Summary_of_Changes_for_Amendment_ 01_20210817.pdf

PDF 75 KB Posted

Attached to
FA9451-21-S-0001 Call 0006 MJOLNIR Federal contract opportunity
Solicitation number
FA945121S0001Call0006
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document provides an amendment to a federal contract opportunity for a counter-unmanned aerial system. The amendment modifies the critical design review date from DOA + 09 months to DOA + 10 months. It also changes language around cost analysis and variance reporting requirements, stating the contractor shall perform full cost analysis and cost variance reporting if total program overrun is projected to exceed $200,000, otherwise those tasks are not required. Additionally, the amendment notes reports shall not be submitted to the referenced OUSD website.

The related federal contract opportunity is seeking a single, near-production representative counter-unmanned aerial system to perform at levels equal to or greater than an existing prototype. The Air Force Research Laboratory Directed Energy Directorate is procuring this system to capitalize on previous high-power microwave research and enable future transition to a program of record. Full proposals must be submitted by September 13, 2021. The agency is the Air Force Materiel Command Research Laboratory.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Changes for:

MJÖLNIR

Closed One-Step Call

Issued Under

Directed Energy Technology Experimentation Research (DETER)

Advanced Research Announcement (ARA)

FA9451-21-S-0001 Call 0006

Amendment 01

17 August 2021

Attachment 1, Statement of Work (SOW), Paragraph 9 is amended as follows:

Critical Design Review: DOA + 09 10 Months

Attachment 3, Data Item Deliverables, CDRL A001, Block 16 Remarks for Block 14 second paragraph is amended as follows:

Contractor shall perform all cost analysis to the Level 3 of the CWBS Contractor shall not perform Cost Variance tasks (2.5.3.2) if total program overrun is determined to be less than $200,000.00.

The Contractor shall perform Cost Variance tasks (2.5.3.2) if total program level cost variance projected to completion exceeds $200,000.00.

Contractor shall not submit reports to the OUSD based website referenced in the DID (1.5) This deliverable concludes with the delivery of the system, estimated at 21mo after contract award as outlined in Section 3.5 of the SOW.

These changes have been incorporated into FA9451-21-S-0001 Call 0006 Amend 01