3. 1029 Breakroom Attachments.pdf
PDF 437 KB Posted
- Attached to
- Kitchenette Remodel
- Solicitation number
- FA940126R0009_Kitchenette_Remodel
About this file
This file contains location maps and facility floor plans for a government customer facility remodel project at Kirtland Air Force Base in Albuquerque, New Mexico.
Attachment-1 provides a satellite map showing directions from Kirtland AFB Truman Gate to the Government Customer location in Building 1029. The route requires heading south on Grace Avenue SW, turning left on Randolph Avenue SE, turning right on San Mateo Boulevard SE, and turning left into the parking lot before street curves to reach Building 1029 on the left side. Attachment-2 presents floor plans of Building 1029 identifying three kitchenettes requiring remodel/refurbishment work located in Rooms 111/112, 224, and 401 across the building's main floor and second floor. Attachment-3 details the scope of work for the Room 111/112 Kitchenette, which requires new cabinetry and countertop, dual sink fixtures with garbage disposal, reverse osmosis system, flooring and tile, acoustic ceiling, exhaust fan, light fixtures, and paint. The project involves expanding the kitchenette into adjacent Room 112, sealing the Room 111 entrance to create entry through Room 112, relocating an electrical switch, installing a new exhaust fan, and modifying the existing vent pipe configuration. The floor plan indicates the work is in the design phase with final layout to be determined.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026.04.21_Site Visit Roster.pdf | ||
| QandA for FA940126R0009.pdf | ||
| 1. B1029 Break Room SOW (Mar 2026).pdf | ||
| 4. NM20250044_2026.01.02.pdf | ||
| Solicitation - FA940126R0009.pdf | ||
| 2. Site Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Customer ATTACHMENT-1
NOV
Government Customer ATTACHMENT-1
D o w n
D o w n
Down
Second Floor
Up
U p
ENTRANCE
110 111 112 113
B1029
203 201
Government Customer
Elevator
222223224
Remodel/Refurbish B1029 Kitchenettes -- 111/112 Kitchenet -- 224 Kitchenet -- 401 Kitchenet
Elevator
ATTACHMENT-2
Room 401
Room 111/112
Room 224
NOV
D o w n
D o w n
Down
Second Floor
Up
U p
ENTRANCE
110 111 112 113
B1029
203 201
Government Customer
Elevator
222223224
Remodel/Refurbish B1029 Kitchenettes -- 111/112 Kitchenet -- 224 Kitchenet -- 401 Kitchenet
Elevator
ATTACHMENT-2
Room 401
Room 111/112
Room 224
Government Customer
111/112 Kitchenet
111/112 Kitchenet To Receive:
-- New Cabinetry/Countertop -- New Fixtures/Dual Sink -- New Garbage Disposal -- New Osmosis System -- New Flooring/Tile -- New Acoustic Ceiling -- New Exhaust Fan -- New Light Fixtures -- New Paint -- Expanded Into Adjacent Room 112 -- Seal Room 111 Entrance. Enter thru Room 112
111 112
TT
TT
Current Layout
NTS
Nov 2025
NTS
Nov 2025
ATTACHMENT-3
111 112
TT
TT
Relocate SwitchSeal Opening
New Opening
New Exhaust Fan
Existing Vent Pipe
New Layout (TBD)
Government Customer
111/112 Kitchenet
111/112 Kitchenet To Receive:
-- New Cabinetry/Countertop -- New Fixtures/Dual Sink -- New Garbage Disposal -- New Osmosis System -- New Flooring/Tile -- New Acoustic Ceiling -- New Exhaust Fan -- New Light Fixtures -- New Paint -- Expanded Into Adjacent Room 112 -- Seal Room 111 Entrance. Enter thru Room 112
111 112
TT
TT
Current Layout
NTS
Nov 2025
NTS
Nov 2025
ATTACHMENT-3
111 112
TT
TT
Relocate SwitchSeal Opening
New Opening
New Exhaust Fan
Existing Vent Pipe
New Layout (TBD)
| 1029 Beakroom Request (June 2025).vsdx |
| Attach-1 |
| Attach-2 |
| 111-112 |
File details come from the government source that posted it. Updated .