3. 1029 Breakroom Attachments.pdf

PDF 437 KB Posted

Attached to
Kitchenette Remodel
Solicitation number
FA940126R0009_Kitchenette_Remodel
Issued by

About this file

This file contains location maps and facility floor plans for a government customer facility remodel project at Kirtland Air Force Base in Albuquerque, New Mexico.

Attachment-1 provides a satellite map showing directions from Kirtland AFB Truman Gate to the Government Customer location in Building 1029. The route requires heading south on Grace Avenue SW, turning left on Randolph Avenue SE, turning right on San Mateo Boulevard SE, and turning left into the parking lot before street curves to reach Building 1029 on the left side. Attachment-2 presents floor plans of Building 1029 identifying three kitchenettes requiring remodel/refurbishment work located in Rooms 111/112, 224, and 401 across the building's main floor and second floor. Attachment-3 details the scope of work for the Room 111/112 Kitchenette, which requires new cabinetry and countertop, dual sink fixtures with garbage disposal, reverse osmosis system, flooring and tile, acoustic ceiling, exhaust fan, light fixtures, and paint. The project involves expanding the kitchenette into adjacent Room 112, sealing the Room 111 entrance to create entry through Room 112, relocating an electrical switch, installing a new exhaust fan, and modifying the existing vent pipe configuration. The floor plan indicates the work is in the design phase with final layout to be determined.

View the file

Other files

File Type Posted
2026.04.21_Site Visit Roster.pdf PDF
QandA for FA940126R0009.pdf PDF
1. B1029 Break Room SOW (Mar 2026).pdf PDF
4. NM20250044_2026.01.02.pdf PDF
Solicitation - FA940126R0009.pdf PDF
2. Site Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Government Customer ATTACHMENT-1

NOV

Government Customer ATTACHMENT-1

D o w n

D o w n

Down

Second Floor

Up

U p

ENTRANCE

110 111 112 113

B1029

203 201

Government Customer

Elevator

222223224

Remodel/Refurbish B1029 Kitchenettes -- 111/112 Kitchenet -- 224 Kitchenet -- 401 Kitchenet

Elevator

ATTACHMENT-2

Room 401

Room 111/112

Room 224

NOV

D o w n

D o w n

Down

Second Floor

Up

U p

ENTRANCE

110 111 112 113

B1029

203 201

Government Customer

Elevator

222223224

Remodel/Refurbish B1029 Kitchenettes -- 111/112 Kitchenet -- 224 Kitchenet -- 401 Kitchenet

Elevator

ATTACHMENT-2

Room 401

Room 111/112

Room 224

Government Customer

111/112 Kitchenet

111/112 Kitchenet To Receive:

-- New Cabinetry/Countertop -- New Fixtures/Dual Sink -- New Garbage Disposal -- New Osmosis System -- New Flooring/Tile -- New Acoustic Ceiling -- New Exhaust Fan -- New Light Fixtures -- New Paint -- Expanded Into Adjacent Room 112 -- Seal Room 111 Entrance. Enter thru Room 112

111 112

TT

TT

Current Layout

NTS

Nov 2025

NTS

Nov 2025

ATTACHMENT-3

111 112

TT

TT

Relocate SwitchSeal Opening

New Opening

New Exhaust Fan

Existing Vent Pipe

New Layout (TBD)

Government Customer

111/112 Kitchenet

111/112 Kitchenet To Receive:

-- New Cabinetry/Countertop -- New Fixtures/Dual Sink -- New Garbage Disposal -- New Osmosis System -- New Flooring/Tile -- New Acoustic Ceiling -- New Exhaust Fan -- New Light Fixtures -- New Paint -- Expanded Into Adjacent Room 112 -- Seal Room 111 Entrance. Enter thru Room 112

111 112

TT

TT

Current Layout

NTS

Nov 2025

NTS

Nov 2025

ATTACHMENT-3

111 112

TT

TT

Relocate SwitchSeal Opening

New Opening

New Exhaust Fan

Existing Vent Pipe

New Layout (TBD)

1029 Beakroom Request (June 2025).vsdx
Attach-1
Attach-2
111-112

File details come from the government source that posted it. Updated .