This document is a Questions and Answers (Q&A) file for a Water Tower Treatment project at Nellis Air Force Base (NAFB). The Q&A covers ten detailed questions about equipment specifications and service requirements, including cooling tower details such as tonnage (60), cooling tower sizes (12 ft nominal, 6 ft louver), cooling loop volumes (300 Liters), and filter specifications (Parker, 10", 10 micron). The government-owned equipment includes chemical feed and control equipment, with cooling towers C030 and C031 confirmed to be in good working order and having a capacity of 38390 MBH. The service frequency is established as monthly, and the make-up water will be local city water. The document also includes guidance on past performance questionnaires, noting that while it's not required, offerors are encouraged to send questionnaires to points of contact and copy specific government email addresses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAFB Water Tower Treatment – Q&A
Question 1: The "Evaluation" section of the SAM.gov description states:
Past Performance: Each offeror’s PPIF will be reviewed and a Past Performance Questionnaire (PPQ), found at Attachment 4, will be sent to the identified POC/s found on each contractor or subcontractor’s PPIF. Using the information included in the returned PPQs, the Government will evaluate the quality of the performance of the contractor or subcontractor on each effort and will consider each past contract’s quality when evaluating overall past performance.
Is it acceptable for offerors to submit these questionnaires directly to past POCs and in advance of the submission deadline?
Answer 1: Yes, it is not required for the offeror to send the PPQ to the POCs listed on the PPIF, however it is highly encouraged. If the offeror chooses to send the PPQ to the POCs listed on the PPIF, please Cc both Jenna Jacobson (jenna.jacobson@us.af.mil) and Denina Hudson (denina.hudson@us.af.mil).
Question 2: What is the tonnage of the cooling towers?
Answer 2: 60
Question 3: What are the approximate volumes of the closed chill loop and hot loop?
Answer 3: 300 Liters
Question 4: Please confirm if the equipment is owned by the government and will be available to utilize by a different vendor.
Answer 4: Govt owned.
Question 5: Please confirm that the make-up water is local city water. If not, please detail where the make-up water originates and provide detailed lab analysis of that water.
Answer 5: Local City Water mailto:jenna.jacobson@us.af.mil mailto:denina.hudson@us.af.mil
Question 6: What are the brand, size, and micron rating of the filters currently installed on the chilled loop, hot loop, and condenser loop (noting that there are two filters on the condenser loop)?
Answer 6: Parker, 10”, 10 micron
Question 7: Does the site currently own all chemical feed and control equipment (e.g., chemical storage tanks, chemical feed pumps, cooling tower controllers), or will these need to be supplied?
Answer 7: Yes
Question 8: Would you like cooling tower cleanings to be included in the service pricing? If so, how many cleanings per year are required?
Answer 8: No
Question 9: What is the desired service frequency—weekly or monthly?
Answer 9: Monthly
Question 10: could you please confirm the size/capacity of Cooling Towers C030 and C031, and let us know if they’re in good working order or due for replacement?
Answer 10: Size: 12 ft nominal, 6 ft louver
Capacity: 38390 MBH
Yes, they are in good working order, not due for replacement.