Attachment 1- Statement of Work Updated _20250429.pdf
PDF 357 KB Posted
- Attached to
- B1220A Office Addition Federal contract opportunity
- Solicitation number
- FA930125Q0012
About this file
This Statement of Work (SOW) details an office addition project for the Air Force Test Center at Edwards Air Force Base, California. The project involves installing demountable walls, electrical outlets, and doors in Building 1220A, specifically modifying a western classroom area. Key installation requirements include: a 40' x 8'10" center wall to separate the office work area from the existing classroom, a 14' x 8'10" wall to create a new office area, installation of 6 each 110v outlets, and two new maple doors (36" X 84" for classroom egress and 3' X 7' for office egress) with silver lever-action lockable handles.
The solicitation (FA930125Q0012) is set aside 100% for small businesses, with a period of performance of 90 days from contract award. Work hours are 0700 to 1600 hours, Monday through Friday, excluding federal holidays. The procurement will be conducted using Simplified Acquisition Procedures, with award based on the Lowest Price Technically Acceptable (LPSF) method. Quotes are due by 25 April 2025 at 1400 PM Pacific Standard Time, to be submitted electronically to the contracting officers Stacey Stuart and Paola Diaz. The NAICS code is 332311 with a size standard of 750 employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 B1220A Office Addition_Addendum QA_20250507.pdf | ||
| Solicitation Amendment FA930125Q00120002 SF 30.pdf | ||
| Attachment 4 Site Visit Briefing Slides FA9301-25-Q-0012 20250502.pptx | PPTX presentation | |
| Solicitation Amendment FA930125Q00120001 SF 30.pdf | ||
| Attachment 1- Statement of Work 20250331.pdf | ||
| Solicitation - FA930125Q0012.pdf | ||
| Attachment 2- Kern County Wage Determination 20250407.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DATE OF DOCUMENT: 29 APRIL 2025
TITLE: B1220A Office Addition
Site Support Division
412 MXG/MXLOS
AIR FORCE TEST CENTER
EDWARDS AIR FORCE BASE, CALIFORNIA 93524
This document was updated on Amendment 0002. It supersedes the previous version. All changes are in RED (see page 2). No other changes were made to this SOW.
1. SCOPE AND OBJECTIVE
The Air Force Test Center (AFTC), Edwards AFB, CA, requests a proposal for work to be accomplished for the (MXG) for at Building 1220A within the western classroom. The work to be accomplished includes but is not limited to the following: Erect demountable walls, install doors for room access, Interior Finish each installed area.
2. PURPOSE OF THE DOCUMENT
This Statement of Work serves as a tool for recording customer requirements, ensuring that these requirements are met and evaluating the project design before installation begins. The overall objective is to establish a plan of action for defining and achieving desired results and goals.
3. REQUIREMENTS
Requirements statements in this section are organized for Building installation. The contractor shall accomplish the following:
4. SPECIAL INSTALLATION
Install Contractor furnished demountable walls, electrical outlets, doors.
Install 40' x 8' 10" contractor procured Center wall to separate office work area from existing classroom install contractor procured 14' x 8' 10" wall to create office area.
install power raceway for 6 each 110v outlets on 40' interior wall'
Install new 36" X 84" standard maple door for classroom egress, install new 3' X 7' standard maple door for new office egress, each door should be equipped with silver colored lever action lockable handles.
New installation to match existing structure with product laminate or cloth standard Tan or gray color.
See Appendix 1 for layout plans. The filled orange area room to be modified. The blue rectangles denote doors to be installed. Please print appendix in color.
5. GENERAL REQUIREMENTS
Contractor shall field verify all dimensions prior to installation.
Contractor shall always keep the area clean and remove all waste in a timely manner.
Repair/Replace any items damaged by the contractor employees and/or any sub-contractors while working on this project.
As this area is unclassified, no special security measures are required.
6. SCHEDULE
Period of performance is 90 days from award of contract.
Hours of operation are 0700 to 1600 hours 5 days a week Monday through Friday during the course of a standard business week excluding Federal holidays.
APPENDIX 1
BUILDING LAYOUT
Print appendix 1 in color.
14' x 8' 10"
40' x 8' 10"
Demountable Wall
Door
Area to be made into a room