Atch_8 _Government_Furnished_Property_List.pdf
PDF 465 KB Posted
- Solicitation number
- FA9301-14-R-0015
About this file
Attachment 8 Government Furnished Property List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Additional_Site_Visit_QandAs.docx | DOCX document | |
| MB_WWTP_Board_Order_6-01-41_WDID_6B150700001.pdf | ||
| AFRL_WWTP_Board_Order_SIGNED_ONE_6-99-33_WDID_6B150700002.pdf | ||
| Site_Visit_QandAs.docx | DOCX document | |
| WWTP_Site_Visit_slides.pptx | PPTX presentation | |
| FA9301-14-R-0015.pdf | ||
| Atch_9 _Site_Visit_Information.doc | DOC document | |
| Atch_10 _Subcontractor_Consent_Letter_Sample.doc | DOC document | |
| Atch_1 _Performance_Work_Statement_(PWS).doc | DOC document | |
| Atch_3 _Mission-Essential_Contractor_Services_Plan_template.doc | DOC document | |
| Atch_5 _Performance_Information_Form.doc | DOC document | |
| Atch_4 _Contractor's_Government_Property_Plan_guidelines.doc | DOC document | |
| Atch_2 _Price_Proposal_Template.xlsx | XLSX spreadsheet | |
| Atch_7 _Wage_Determination.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nomenclature Qty U/I Cost Location Material/
Equipment Furnace, Muffle #1400 1 ea $150.00 Bldg 693 E Lockout Tagout Tool Box 1 ea $80.00 Bldg 693 E dessicator, vacuum 1 ea $40.00 Bldg 693 E dessicator plate 230mm 1 ea $60.00 Bldg 693 E Oven, small, utility 1 ea $450.00 Bldg 693 E Titra Stir 1 ea $325.00 Bldg 693 E Weight, Balance 1 ea $50.00 Bldg 693 E Meter, Conductivity 1 ea $200.00 Bldg 693 E Balance, analytical 1 ea $150.00 Bldg 693 E Dissolved Oxygen Meter, 51B 1 ea $150.00 Bldg 693 E Incubator, Culture Model 15E 1 ea $250.00 Bldg 693 E 2100N Lab Turb, 115/230V, 50/6 1 ea $350.00 Bldg 693 E COD Reactor, 115/230V/50-60M2 1 ea $2,500.00 Bldg 693 E Meter, PH, 115V, Model EC30 1 ea $600.00 Bldg 693 E Spectro DR/4000 UV/V1s 115V 1 ea $5,550.00 Bldg 693 E Spectro DR/4000 UV/V1s 115V 1 ea $5,550.00 Bldg 693 E Hot Plate/stirrer, 120 v 50/60 1 ea $100.00 Bldg 693 E Technical Data Package #2 2 bk $100.00 Bldg 694 E Thermometer, 20 to 110c 305 1 ea $40.00 Bldg 693 E Thermometer, 10 to 260 c 405 1 ea $40.00 Bldg 693 E tongs, crucible 1 ea $10.00 Bldg 693 E 60' Handline and Bracket 6 ea $277.80 Bldg 694 E 30" Commercial Life Buoy 6 ea $475.50 Bldg 694 E Life Buoy Fiberglass Cabinet 6 ea $1,800.00 Bldg 694 E
Total Page Cost $19,298.30
Solicitation FA9301-14-R-0015
The Government will monitor these items during contract performance. The Government is responsible for replacing/repairing any items on this list. The Contractor shall return these items to the Government at the end of contract performance.
Government Furnished Property (GFP) under FAR 52.245-1
Attachment 8, FA9301-14-R-0015 1 of 2
Nomenclature Qty U/I Cost Location Material/
Equipment Aprons, green 10 ea $50.00 Bldg 694 E Work Gloves, Safety 10 ea $50.00 Bldg 694 E stir bar, octagonal, small 1 ea $10.00 Bldg 693 E stir bar, octagonal, med 34 ea $340.00 Bldg 693 E support base and rod 1 ea $25.00 Bldg 693 E Buffer Solution, Red, PH 4.00 1 gl $25.00 Bldg 693 M Buffer Solution, Yellow, PH 7,000 1 gal. $25.00 Bldg 693 M Buffer Solution, Blue, PH 10.00 1 gal. $25.00 Bldg 693 M Calomel Electrode Filling Solution 6 100 ml $37.50 Bldg 693 M Silicone Oil 1 15 ml $5.00 Bldg 693 M Potassium Chloride Filling Solution 1 65 ml $12.00 Bldg 693 M Safety Clamps/tongs 13 ea $195.00 Bldg 693 E Laboratory scissors 2 ea $28.90 Bldg 693 E Forceps, filter, bent tip 1 ea $17.25 Bldg 693 E Filter, paper, 100/pk 2 pk $80.00 Bldg 693 M Desiccant, Drierite 2 bt $30.00 Bldg 693 M DPD Free Chlorine Reagents 1 pk $50.00 Bldg 693 M Clipper, (nail) PWD PLWS 1 ea $10.00 Bldg 693 E Pipette, Tensette 1 ea $10.00 Bldg 693 M Pipette, Tensette 1 ea $10.00 Bldg 693 M Pipette Tip for 19700-10, 50/pk 2 pk $20.00 Bldg 693 M Pipette Tip for 19700-01 32 ea $0.96 Bldg 693 M
Total Page Cost $1,056.61
Solicitation FA9301-14-R-0015 Government Furnished Property (GFP) under FAR 52.245-2
The property is to be furnished in an "as-is" condition. No physical inspection of the items will take place during contract performance. The contractor shall replace these items as required at their expense and will retain ownership upon contract completion.
Attachment 8, FA9301-14-R-0015 2 of 2