Atch 01 Requirement Document.docx
DOCX document 41 KB Posted
- Attached to
- C-103 Niobium Billets Federal contract opportunity
- Solicitation number
- FA9101-20-P-2008
About this file
This requirements document outlines niobium alloy C-103 billets needed by the Arnold Engineering Development Complex. The contractor shall supply 45 billets in total, ranging from 2 to 7.5 inches in diameter and 1 to 24 inches in length, per the specifications in ASTM B655. The contractor must also provide material certifications, a 100% inspection report, and a certificate of compliance for each billet. Deliverables are due by July 31, 2021 and shall be shipped to the Federal Research Center at White Oak in Silver Spring, Maryland.
The related solicitation seeks bids for C-103 niobium billets as detailed in the requirements document. The requirements and deliverables will be evaluated to select the winning contractor for this opportunity with the Department of the Air Force Materiel Command Test Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA Doc.docx | DOCX document | |
| Atch 01 Requirement Document.docx | DOCX document | |
| QA Doc.docx | DOCX document | |
| QA Doc.docx | DOCX document | |
| Combined Synopsis Solicitation.docx | DOCX document | |
| Atch 02 FAR DFARS AFFARS Prov and Clauses.docx | DOCX document | |
| Combined Synopsis Solicitation.docx | DOCX document | |
| Atch 02 FAR DFARS AFFARS Prov and Clauses.docx | DOCX document | |
| Atch 01 Requirement Document.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Thursday, August 6, 2020
Distribution A.
Approved for Public Release. Distribution is unlimited. (AEDC PA # 2017‐221 & IRA # 3367)
REQUIREMENTS DOCUMENT
FOR
C-103 BILLET BULK ORDER
ARNOLD ENGINEERING DEVELOPMENT COMPLEX
ARNOLD AIR FORCE BASE, TN 37389-9998
ARNOLD ENGINEERING DEVELOPMENT COMPLEX – WHITE OAK SITE
FEDERAL RESEARCH CENTER AT WHITE OAK
10905 NEW HAMPSHIRE AVE
SILVER SPRING, MD 20903-1050
Table of Contents
1. SCOPE
2. DELIVERABLES
3. REQUIREMENTS
4. Delivery
Table of Contents-1
1. SCOPE
1.1. The scope of this effort is to procure niobium alloy C-103 billets (per ASTM B655) to meet the operational needs of the Tunnel 9 facility. The manufacturer shall supply a written material certifications for the material produced. The material certifications for each lot (as defined in ASTM B655) shall include chemical composition, yield strength at room temperature, ultimate tensile strength at room temperature, modulus of elasticity at room temperature, and percent elongation at room temperature. The manufacturer shall supply a 100% inspection report for each billet. The manufacturer shall supply a certificate of compliance for each billet. The fabricator shall mark each billet with layout dye with diameter and length shown for each billet in Table 1.
Table 1. Tunnel 9 – Niobium Alloy C-103 Billets
| Item # |
| Description |
| Material |
| Minimum Quantity |
| Diameter (in) +0.5"/-0.0" |
| Length (in) +1"/-0" |
| 1 |
| Niobium Alloy C-103 Billet |
7.5" Dia. X 1" LG.
| C-103, Annealed Condition (ASTM B655) |
| 6 |
| 7.5 |
| 1 |
| 2 |
| Niobium Alloy C-103 Billet |
6.5" Dia. X 24" LG.
| C-103, Annealed Condition (ASTM B655) |
| 7 |
| 6.5 |
| 24 |
| 3 |
| Niobium Alloy C-103 Billet |
5.5" Dia. X 24" LG.
| C-103, Annealed Condition (ASTM B655) |
| 15 |
| 5.5 |
| 24 |
| 4 |
| Niobium Alloy C-103 Billet |
4" Dia. X 24" LG.
| C-103, Annealed Condition (ASTM B655) |
| 17 |
| 4 |
| 24 |
| 5 |
| Niobium Alloy C-103 Billet |
2" Dia. X 24" LG.
| C-103, Annealed Condition (ASTM B655) |
| 2 |
| 2 |
| 24 |
2. DELIVERABLES
2.1. 6x Niobium Alloy C-103 Billet 7.5" Dia. X 1" LG. per ASTM B655
2.2. 7x Niobium Alloy C-103 Billet 6.5" Dia. X 24" LG. per ASTM B655
2.3. 15x Niobium Alloy C-103 Billet 5.5" Dia. X 24" LG. per ASTM B655
2.4. 17x Niobium Alloy C-103 Billet 4" Dia. X 24" LG. per ASTM B655
2.5. 2x Niobium Alloy C-103 Billet 2" Dia. X 24" LG. per ASTM B655
2.6. Material Certifications for Each Billet
2.7. 100% Inspection Report for Each Billet
2.8. Certificate of Compliance for Each Billet
3. REQUIREMENTS
3.1. Submittals: The Contractor shall submit all documentation in accordance with Appendix A – Submittal Procedure.
3.2. Material may be finished as forged, rolled, swaged, drawn; in a cleaned, machined, or ground condition. The manufacturer shall be permitted to remove minor surface imperfections provided such removal does not reduce the dimensions below the minimum outlined in Section 1 – Table 1.
3.3. All items must be shipped on heavy duty plastic 48 inches by 40 inches standard pallets. Total weight of load, protective shipping material, and pallet must be less than 2500 lbs. for each pallet.
4. Delivery
4.1. The fabricator shall deliver the finished items by 31 July 2021.
4.2. Upon completion, all items will be shipped to the Arnold Engineering Development Complex, Federal Research Center at White Oak, 10905 New Hampshire Ave, Silver Spring, MD 20903-105
File details come from the government source that posted it. Updated .