This requirements document outlines niobium alloy billets needed by the Arnold Engineering Development Complex. The scope is to procure 45 C-103 niobium alloy billets per ASTM B655 in various diameters and lengths, with a total delivery date of January 22, 2021. Required deliverables include the billets, material certifications for each billet documenting chemical composition and material properties, a 100% inspection report for each billet, and a certificate of compliance for each billet. Billets must be marked with diameters and lengths as specified, and all items must be shipped on pallets weighing less than 2,500 pounds each.

View the file

Other files for this federal contract opportunity

Other files attached to C-103 Niobium Billets, newest first.
File Type Posted
Atch 01 Requirement Document.docx DOCX document
QA Doc.docx DOCX document
QA Doc.docx DOCX document
QA Doc.docx DOCX document
Atch 02 FAR DFARS AFFARS Prov and Clauses.docx DOCX document
Combined Synopsis Solicitation.docx DOCX document
Atch 01 Requirement Document.docx DOCX document
Combined Synopsis Solicitation.docx DOCX document
Atch 02 FAR DFARS AFFARS Prov and Clauses.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wednesday, June 10, 2020

Distribution A.

Approved for Public Release. Distribution is unlimited. (AEDC PA # 2017‐221 & IRA # 3367)

REQUIREMENTS DOCUMENT

FOR

C-103 BILLET BULK ORDER

ARNOLD ENGINEERING DEVELOPMENT COMPLEX

ARNOLD AIR FORCE BASE, TN 37389-9998

ARNOLD ENGINEERING DEVELOPMENT COMPLEX – WHITE OAK SITE

FEDERAL RESEARCH CENTER AT WHITE OAK

10905 NEW HAMPSHIRE AVE

SILVER SPRING, MD 20903-1050

Table of Contents

1. SCOPE

2. DELIVERABLES

3. REQUIREMENTS

4. Delivery

Table of Contents-1

1. SCOPE

1.1. The scope of this effort is to procure niobium alloy C-103 billets (per ASTM B655) to meet the operational needs of the Tunnel 9 facility. The manufacturer shall supply a written material certifications for the material produced. The material certifications for each lot (as defined in ASTM B655) shall include chemical composition, yield strength at room temperature, ultimate tensile strength at room temperature, modulus of elasticity at room temperature, and percent elongation at room temperature. The manufacturer shall supply a 100% inspection report for each billet. The manufacturer shall supply a certificate of compliance for each billet. The fabricator shall mark each billet with layout dye with diameter and length shown for each billet in Table 1.

Table 1. Tunnel 9 – Niobium Alloy C-103 Billets

Item #
Description
Material
Minimum Quantity
Diameter (in) +0.5"/-0.0"
Length (in) +1"/-0"
1
Niobium Alloy C-103 Billet

7.5" Dia. X 1" LG.

C-103, Annealed Condition (ASTM B655)
6
7.5
1
2
Niobium Alloy C-103 Billet

6.5" Dia. X 24" LG.

C-103, Annealed Condition (ASTM B655)
7
6.5
24
3
Niobium Alloy C-103 Billet

5.5" Dia. X 24" LG.

C-103, Annealed Condition (ASTM B655)
15
5.5
24
4
Niobium Alloy C-103 Billet

4" Dia. X 24" LG.

C-103, Annealed Condition (ASTM B655)
17
4
24
5
Niobium Alloy C-103 Billet

2" Dia. X 24" LG.

C-103, Annealed Condition (ASTM B655)
2
2
24

2. DELIVERABLES

2.1. 6x Niobium Alloy C-103 Billet 7.5" Dia. X 1" LG. per ASTM B655

2.2. 7x Niobium Alloy C-103 Billet 6.5" Dia. X 24" LG. per ASTM B655

2.3. 15x Niobium Alloy C-103 Billet 5.5" Dia. X 24" LG. per ASTM B655

2.4. 17x Niobium Alloy C-103 Billet 4" Dia. X 24" LG. per ASTM B655

2.5. 2x Niobium Alloy C-103 Billet 2" Dia. X 24" LG. per ASTM B655

2.6. Material Certifications for Each Billet

2.7. 100% Inspection Report for Each Billet

2.8. Certificate of Compliance for Each Billet

3. REQUIREMENTS

3.1. Submittals: The Contractor shall submit all documentation in accordance with Appendix A – Submittal Procedure.

3.2. Material may be finished as forged, rolled, swaged, drawn; in a cleaned, machined, or ground condition. The manufacturer shall be permitted to remove minor surface imperfections provided such removal does not reduce the dimensions below the minimum outlined in Section 1 – Table 1.

3.3. All items must be shipped on heavy duty plastic 48 inches by 40 inches standard pallets. Total weight of load, protective shipping material, and pallet must be less than 2500 lbs. for each pallet.

4. Delivery

4.1. The fabricator shall deliver the finished items by 22 January 2021.

4.2. Upon completion, all items will be shipped to the Arnold Engineering Development Complex, Federal Research Center at White Oak, 10905 New Hampshire Ave, Silver Spring, MD 20903-105

File details come from the government source that posted it. Updated .