AMENDMENT 0003

FA9101-19-Q-0004

QUESTIONS AND ANSWERS #2

20 February 2019

1. QUESTION: Can the motor pedestals be removed with the motors and brought to contractor’s site? (This will increase efficiency for removal/installation and reduce transportation cost.

Approximately two truckloads instead of four)?

ANSWER: The pedestals can be removed and they can take them if they want. However, these pedestals have likely not been moved since the facility was built in the 50’s. The contractor will be responsible for removing and reassembling. Contractor shall ensure the pedestals and bearings are properly aligned, secured, and reinstalled in the correct manner for operations.

//////////////////////////////////////////////////////////////////END/////////////////////////////////////////////////////////////////////////

AEDC/PZI/klm/02202019