AMENDMENT 0001

FA9101-19-Q-0004

QUESTIONS AND ANSWERS #1

30 January 2019

1. QUESTION: Is there room for the delivery to be pushed out?

ANSWER: No. We have one maintenance down-period and all four (4) motors need rewound during the same period. The facility is non-operational with any one of the motors out of the system.

2. QUESTION: If it can’t be pushed out, would it be possible stagger the repairs over different 8 week periods?

ANSWER: No. We have one maintenance down-period and all four (4) motors need rewound during the same period. The facility is non-operational with any one of the motors out of the system.

3. QUESTION: Have these motors been rewound before? If yes, do you have winding information for each? This would make the lead time much better, because we could order the coils ahead of the motors being pulled and have them ready to go.

ANSWER: We believe the largest motor has been rewound. It is unknown if the other three (3) have been rewound. Regardless, we have been unable to locate any of the rewind information.

4. QUESTION: If we were not able to make the February 5th site visit, would we be able to schedule another visit at a date before the 14th (when the questions are due)?

ANSWER: This is not desirable. An alternate site visit date can be arranged if absolutely necessary but is not guaranteed and is dependent on facility operations.

5. QUESTION: Will each motor be awarded to a different vendor or is this a winner take all?

ANSWER: The Government will award one (1) contract resulting from this solicitation to the responsible offeror whose offer conforming to this solicitation is the lowest priced technically acceptable offer.

//////////////////////////////////////////////////////////////////END/////////////////////////////////////////////////////////////////////////