Industry_Day_No._3_Agenda.pdf

PDF 147 KB Posted

Attached to
Facility Support Services
Solicitation number
FA9101-18-R-1000
Issued by

View the file

Other files

File Type Posted
Section_B_Pages_Amend_0001.pdf PDF
Amendment_0001_SF30.pdf PDF
QandA_No._9.pdf PDF
QandA_No._8.pdf PDF
QandA_No._7.pdf PDF
Attachment_6_GFP.pdf PDF
Exhibit_C,_ASO_and_AEMTC_CBA.pdf PDF
Attachment_1_PWS_9_Nov_18.pdf PDF
Attachment_L-6,_Relevancy_Matrix.xlsx XLSX spreadsheet
Attachment_L-2,_Past_and_Present_Performance_Questionnaire_FSSII.pdf PDF
Attachment_L-1,_PPI_Tool.pdf PDF
Attachment_8,_Section_L_FRFP.pdf PDF
Attachment_L-5,_Subcontractor_Consent_Letter.pdf PDF
Exhibit_E,_ASO_and_URS_and_AEMTC_CBA.pdf PDF
Attachment_7_USAF_Owned_Registered_Vehicles.pdf PDF
FSS_II_Cover_Letter_to_RFP.pdf PDF
Attachment_L-3,_PPQ_Cover_Letter.pdf PDF
Exhibit_A_CDRLs.pdf PDF
Attachment_9,_Section_M_FRFP.pdf PDF
Attachment_L-4_Past_Performance_Client_Authorization_Letter.pdf PDF
Attachment_3,_SCA_and_CBA_WDs.pdf PDF
Attachment_L-8,_Cost_Model_FRFP.xlsx XLSX spreadsheet
Exhibit_B_DIDs.pdf PDF
PPI_Tool_FSS_II.accdb MDB file
Attachment_5_FES-IMS_Property_Listing.pdf PDF
Exhibit_D,_ASO_and_PSI_and_IGUA_CBA.pdf PDF
Attachment_L-7,_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_2,_DD_254.pdf PDF
FSS_II_SF33.pdf PDF
QandA_No._6.pdf PDF
FSS_II_Notional_Acquisition_Schedule_31Oct18.pdf PDF
FSS_II_Notional_Acquisition_Schedule_-_Sep_2018.pdf PDF
Industry_Day_3_Panel_Cancellation.pdf PDF
Draft_Attachment_8,_Section_L_(UPDATE).pdf PDF
QandA_No._5.pdf PDF
Industry_Day_No._3_Registration_Form.docx DOCX document
Industry_Day_No._3_Announcement.pdf PDF
QandA_No._4.pdf PDF
Attachment_3,_SCA_and_CBA_WDs.pdf PDF
Exhibit_C,_ASO_and_AEMTC_CBA.pdf PDF
Attachment_L-2,_Past_and_Present_Performance_Questionnaire_FSSII.pdf PDF
PPI_Tool_FSS_II.accdb MDB file
Attachment_9,_Section_M.pdf PDF
Exhibit_D,_ASO_and_PSI_and_IGUA_CBA.pdf PDF
FSS_II_dRFP_SF33.pdf PDF
Exhibit_E,_ASO_and_URS_and_AEMTC_CBA.pdf PDF
Attachment_L-1,_PPI_Tool.pdf PDF
Attachment_7,_USAF_Owned_Registered_Vehicles.pdf PDF
Attachment_2,_DD254.pdf PDF
Attachment_1_PWS_17_Aug_18.pdf PDF
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Panel 5: 2:15 P.M. – 3:15 P.M.

Panel 6: 3:30 P.M. – 4:30 P.M

The Government will provide a specific appointment time to each company submitting a registration form. A company may not register for a specific time slot, but may select a preference for a morning or an afternoon time when completing the registration form. Please note that registration will be conducted on a first come, first serve basis that may result in a preference not being available.

Day 2 Agenda (Draft) (all times are Central)

The second day, Government Furnished Property (GFP) review, will be held on 27 September 2018 at the Arnold AFB visitor center, located at the main gate. Attendees will travel as a group via a bus into the mission area and make predetermined stops, exiting the bus, and visually review the GFP.

The GFP review is being offered to provide the prime contractor and joint venture partners / subcontractors an opportunity to visually see GFP items identified in Attachment 6, GFP, of the draft Request for Proposal.

The time scheduled for the GFP review follows:

Group A: 8:00 A.M. – 11:00 A.M.

Group B: 1:00 P.M. – 4:00 P.M. (Group B will only be utilized if Group A fills up)

Notes and Special Instructions

1. Pre-registration is required for the day 1 panel discussions and the day 2 GFP review. There is no attendance limit for either day.

2. The GFP review will start and end at the visitor center. Open toe shoes are NOT allowed on the GFP review. Personal protective equipment will not be required.

3. The GFP review will be held rain or shine, so plan accordingly.

4. All GFP review attendees are required to be U.S. citizens. Signatures will be required at the visitor center prior to going on the review attesting to U.S. citizenship.

5. Pictures are not allowed during the GFP review. Pictures of specific items can be requested by contacting the Procuring Contracting Officer (PCO). Any questions / concerns about specific items should be sent to the PCO.

6. Snacks and drinks will not be available at the GLC. Please plan accordingly.

Registration Instructions

1. To register for the FSS Industry Day No. 3, please complete the Industry Day No. 3 Registration Form and send the document to aedc.sso@us.af.mil.

2. Please register by: Noon on Friday, September 21, 2018.

If you have any questions, please contact Mr. John Lominac, john.lominac.1@us.af.mil or Ms. Tyler Payne, tyler.payne.9@us.af.mil.

File details come from the government source that posted it.