14877

SOW NO. 14877

24 Feb 17

STATEMENT OF WORK

FOR

Repave Asphalt Portion of Dispensary Parking Lot, Bldg. 225

ARNOLD ENGINEERING DEVELOPMENT CENTER

ARNOLD AIR FORCE BASE, TENNESSEE 37389-9998

NOT AEDC STINFO

Atch 3 17-R-0025

Table of Contents -1

Table of Contents

Section/Paragraph

1. SCOPE

1.1 Introduction

2. APPLICABLE DOCUMENTS

2.1 Government Documents

2.2 Non-Government Documents

3. REQUIREMENTS

3.1 General

3.2 Safety Requirements

3.3 Submittal Summary

Page - 1

1. SCOPE

1.1 Introduction:

1.1.1 The work consists of providing means to furnish and install all materials, labor, and equipment necessary to mill and repave the asphalt portion (Approximately 14,000 SF), to include striping to match existing (Approximately 400 LF), of the Dispensary parking lot, Building 225 at Arnold Air Force Base, Tennessee. Work shall be performed in accordance with this statement of work, contract documents, and AEDC Paving IDIQ Specification FA9101-17-R-0025.

1.2 Objective:

2. APPLICABLE DOCUMENTS

2.1 Government Documents:

2.1.1 Specifications:

A. IDIQ Specification No. FA9101-17-R-0025 Paving IDIQ.

2.1.2 Drawings: See Appendix A

3. REQUIREMENTS

3.1 General:

3.1.1 A storm water permit will not be required.

3.1.2 Clean up and restore all work areas and adjacent areas which were disturbed during the course of the work.

3.1.3 Install and compact aggregate as required.

3.1.4 Provide temporary traffic control devices.

3.1.5 Provide positive drainage in all areas that are resurfaced.

3.1.6 Restripe the parking lot.

3.1.7 Provide proper signage for new handicapped parking spaces.

3.2 Safety Requirements:

3.2.1 All work shall be accomplished in compliance with OSHA Standards

3.3 Submittal Summary:

3.3.1 Submit the following in accordance with Submittal Procedures Part 1.4 of paving specification.

Page - 2

3.3.2 Temporary traffic control plan.

3.3.3 Existing conditions report which should construed as damage resulting from work.

3.3.4 Disallowed products locations.

3.3.5 Safety and health plan.

3.3.6 Hazardous material information.

3.3.7 Excavation plan.

3.3.8 Bituminous plant mix base course product data.

3.3.9 Bituminous plant mix surface course product data.

3.3.10 Aggregate product data.

3.3.11 Tack Coat product data.

3.3.12 Imported material source.

3.3.13 As built drawings.

3.3.14 Percentage of recovered material content.

3.3.15 Warranty against defects in workmanship and materials for one year following acceptance or provide manufacturer’s standard warranties, whichever is longer.

3.3.16 Submittal summary table:

No. Section Reference Submittal Description Due 1 3.3.2 Temporary traffic control Prior to onsite work 2 3.3.3 Existing conditions report Prior to onsite work 3 3.3.4 Disallowed products locations Prior to onsite work 4 3.3.5 Safety and health plan Prior to onsite work 5 3.3.6 Hazardous material information Prior to onsite work 6 3.3.7 Excavation plan Prior to onsite work 8 3.3.9 Concrete mix design Before concrete pours 9 3.3.10 Bituminous plant mix base course product data Before asphalt pours

10 3.3.11 Bituminous plant mix surface course product data

Before asphalt pours

12 3.3.13 Aggregate product data Prior to onsite work

13 3.3.14 Tack coat product data Prior to placement 14 3.3.15 Imported material source Prior to onsite work

Page - 3

No. Section Reference Submittal Description Due 15 3.3.16 As built drawings At final inspection 16 3.3.17 Percentage of recovered material content At final inspection

17 3.3.18 Warranty At final inspection

Table I. Required submittal list - Completed.

END OF SOW

Appendix A

Page - 4

SOW NO. 14877
3.1 General:
3.1.1 A storm water permit will not be required.
3.1.2 Clean up and restore all work areas and adjacent areas which were disturbed during the course of the work.
3.1.3 Install and compact aggregate as required.
3.1.4 Provide temporary traffic control devices.
3.1.5 Provide positive drainage in all areas that are resurfaced.
3.1.6 Restripe the parking lot.
3.1.7 Provide proper signage for new handicapped parking spaces.
3.2 Safety Requirements:
3.2.1 All work shall be accomplished in compliance with OSHA Standards
3.3 Submittal Summary:
3.3.1 Submit the following in accordance with Submittal Procedures Part 1.4 of paving specification.
3.3.2 Temporary traffic control plan.
3.3.3 Existing conditions report which should construed as damage resulting from work.
3.3.4 Disallowed products locations.
3.3.5 Safety and health plan.
3.3.6 Hazardous material information.
3.3.7 Excavation plan.
3.3.8 Bituminous plant mix base course product data.
3.3.9 Bituminous plant mix surface course product data.
3.3.10 Aggregate product data.
3.3.11 Tack Coat product data.
3.3.12 Imported material source.
3.3.13 As built drawings.
3.3.14 Percentage of recovered material content.
3.3.15 Warranty against defects in workmanship and materials for one year following acceptance or provide manufacturer’s standard warranties, whichever is longer.
3.3.16 Submittal summary table: