FA9101-11-B-0004 0001 Amendment 1.pdf

PDF 1 MB Posted

Attached to
HVAC Replace Steam Heat w/Electric Heat Federal contract opportunity
Solicitation number
FA9101-11-B-0004
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Amendment 0001 Questions and Answers and Photos

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Replace Steam Heat w/Electric Heat, newest first.
File Type Posted
Atch 4 Bid Bond Rev 10-98.pdf PDF
Atch 3 Wage Determination TN100052.pdf PDF
Atch 2 Project 12487 Drawings and Specifications.pdf PDF
Solicitation FA9101-11-B-0004.pdf PDF
Atch 1 Construction Specification Proj 12487.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

18 MAR 2011

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AEDC PKE CODE FA9101 7. ADMINISTERED BY (If other than Item 6) CODE

AEDC/PKE

100 KINDEL DRIVE, SUITE A-332

ARNOLD AFB, TN 37389-1332

ROBERT A. GREENE 931-454-5167

Robert.Greene@arnold.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE BIDDERS

FA9101-11-B-0004

X

9B. DATED (SEE ITEM 11)

28 FEB 2011

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to incorporate Questions and Answers Set #1, dated 18 March 2011 and five (5) site-photographs.

All contractors are to acknowledge receipt of this document by completing blocks 8, 15A and 15B on this amendment and returning with proposal by its due date or by filling out blocks 19, 20A and 20B on page 2 of the SF 1442 solicitation. Offer Due Date has not been extended.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

ALAN C. FUDGE

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.13.0 FAR (48 CFR) 53.243 Created 18 Mar 2011 1:26 PM

SCHEDULE OF CHANGES

FA9101-11-B-0004 0001

FA9101-11-B-0004

QUESTIONS AND ANSWERS SET #1

QUESTION (Reference Specification Section 01 10 00, Para. 1.1W): How many people to be relocated?

ANSWER: No more than 15.

QUESTION (Reference Specification Section 01 10 00, Para. 1.1W): Where are the personnel moving to?

ANSWER: Within a 5 mile radius.

QUESTION (Reference Specification Section 01 10 00, Para. 1.1W): What are the furnishings to be relocated?

ANSWER: Occupants will stay in the building and will have tables moved for computers to the rear of the building. All other furnishings will be left in place or be moved around within the building if required and will need to be protected during construction. No more than 20 tables and no more than 20 chairs.

QUESTION (Reference Drawing E-4, Note 6): Note calls for the new service conduit to be tied to the existing conduit. Site plan on drawing does not show the location of the existing conduit. Does the Government have drawings showing where the existing conduit enters the building to include the new transformer location they can provide to contractors?

ANSWER: Detail View "ELECTRICAL SITE PLAN NEAR BLDG. 718 "shown on E-4.

QUESTION (Reference Drawings M6, Note 5 and M11, Note 3): To what extent are contractors to install spray foam insulation with the clutter of existing piping and utilities attached to the wall?

ANSWER: Work around pipes on the walls.

QUESTION (Reference Drawing M11, Building 728, Foam Insulation and Thermal Barrier

Installation): What is the wall height in the area receiving Foam Insulation?

ANSWER: Walls are approximately 24 to 27 feet tall (Refer to Note 5 on Sheet M6 Sheet 12).

QUESTION (Drawing M11, Building 728, Foam Insulation and Thermal Barrier Installation):

What is the existing wall material?

ANSWER: Walls and roof are metal and metal framing.

QUESTION (Drawing M11, Building 728, Foam Insulation and Thermal Barrier Installation):

What is the existing ceiling/deck material?

ANSWER: Metal and Metal Framing

QUESTION: What are the Davis Bacon rates for Lead and Asbestos Abatement?

ANSWER: There is no wage classification for Lead Base Paint Abatement or Asbestos Abatement worker. The Department of Labor (DOL) will not issue wage conformance statements until after contract award and contractor request of conformance on Stand Form 1444. DOL response in another case/project at Arnold AFB, TN (Coffee County) lists Asbestos Abatement/Worker wage of

$27.00 and fringe benefits of $5.00--Lead Based Paint Abatement Worker wage of $10.63 and fringe benefits of $1.13. These rates should be used in preparing bid. If it is later determined by DOL that a higher rate should be used guidance will be provided by the Contracting Office. "Unlisted

SCHEDULE OF CHANGES

FA9101-11-B-0004 0001

classification needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii))".

REESE-JL

Text Box

BUILDING 718 HIGH BAY

Typewritten Text

BUILDING 718 HIGH BAY