MACH1 Q_A_Comments Final AOI_4 NOV 26.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB
Solicitation number
FA890327M1006
Issued by

About this file

This file is a Questions and Answers (Q&A) document addressing clarifications submitted by potential vendors responding to the MACH1 Area of Interest for the F-47 Future Campus at Nellis Air Force Base. The document provides government responses to 13 substantive inquiries regarding submission requirements, evaluation criteria, and program logistics for a Progressive Design-Build (PDB) acquisition under an Other Transaction Agreement (OTA). Key clarifications include: CMMC Level 2 self-assessment letters may be submitted as supplemental attachments without counting toward page limits; Section 3 industrialized construction qualifications narratives have no numerical limit on projects referenced within the two-page maximum, with emphasis on meaningful context and actual proposed team capabilities rather than project title lists; Phase 2 oral presentations will occur in Las Vegas, Nevada on an in-person basis during December 14-17; and font sizing for graphics may use Arial 10 point for readability.

The government addressed critical past performance and pricing structure questions, confirming that relevant construction experience performed as prime contractors, joint venture members, Principal Construction Execution Firms, or other construction partners will be evaluated; however, the government declined to limit qualifying projects exclusively to prime contractor performance. The government will not modify Section 4.4.3 requirements mandating 100% completed design on all submitted A-E project sheets and declined to accept completed Design-Build RFP packages as equivalent qualifying experience. Additional clarifications specify that vendors selected for Phase 2 interviews will receive detailed information regarding Milestone 2 A-E design and preconstruction pricing structures and construction-phase A-E services pricing, which will be separately identified and priced under Milestone 3 distinct from construction management fees. The government confirmed that formal facilitated partnering will be required in Milestone 2, with vendors authorized to propose independent third-party partnering facilitators, and that pre-award site visits to Nellis AFB will not be granted prior to award of Milestone 2 services.

View the file

Other files

File Type Posted
MACH1 Q_A_Comments Final AOI_12NOV26.xlsx XLSX spreadsheet
Nellis_F47_MACH1_AOI_Attachment_F_Commercial_Pricing_V1.docx DOCX document
FINAL_Nellis_F47_MACH1_AOI_30OCT26_V1.docx DOCX document
MACH1 Q_A_Comments Draft AOI Comments_28OCT26.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

#DocumentPage #Paragraph /Figure
NumberReference Description/BackgroundQuestion/Comment/Proposed Resolution(s)Government Response
Q2CMMC Level 2 CertificationRegarding the CMMC Level 2 self-assessment certification letter, in which section should that be provided?The CMMC Level 2 self-assessment letter may be included as a supplemental attachment to the applicable cybersecurity appendix (Appendix D or E). The supplemental attachment will not count against the established page limitations.
Q34.5.3 Section 3Industrialized Construction Qualifications and Specialist ResourcesRegarding 4.5.3 Section 3 - Industrialized Construction Qualifications and Specialist Resources, the AOI states, “Identify commercially relevant completed or ongoing projects, the organizations performing the work, and the specific experience gained.” Can you confirm that you want of list of commercial relevant projects with no limit to the number of projects provided, as long as we stay within the two-page limit?The AOI does not establish a numerical limit on projects referenced within the two-page Section 3 narrative. The Government seeks a holistic demonstration of the proposed team's industrialized construction qualifications and ability to evaluate and implement alternative construction solutions. Project references should provide meaningful context consistent with Appendices B and C, including the performing organization's role, scope of work, and capabilities demonstrated. Where qualifications rely on specialty consultants or other technical resources, respondents should explain their proposed responsibilities and how their expertise will be integrated into the program. Respondents should prioritize compelling evidence of the actual proposed team's capabilities. A list of project titles alone provides limited evidence of relevant qualifications.
Q4Section 5.5 Attachment FPricing Structure for Design and Preconstruction ServicesRegarding Section 5.5; Attachment F; Q&A Q66 and Q76 - Pricing structure for design and preconstruction services — Please clarify the anticipated pricing structure for Milestone 2 A-E design and preconstruction services, including whether these services will be negotiated as a lump sum, by facility or work package, or through another arrangement. Please also clarify whether construction-phase A-E support will be separately priced and how these services will be distinguished from the construction management fees and other cost categories identified in Attachment F.Vendors selected for Phase 2 interviews will receive additional information regarding the anticipated pricing structure for Milestone 2 design and preconstruction services. Construction-phase A-E services will be separately identified and priced under Milestone 3, distinct from construction management fees and other construction cost categories. Additional pricing instructions will be provided to the selected Vendor(s) during Milestone 2.
Q5Acquisition SchedulePotential Site VisitRegarding the Acquisition Schedule and Q&A Q66, would AFCEC accommodate an optional, uncompensated site visit for invited Phase 2 teams before the December 14–17 oral presentations, or will pre-award site visits be available only to vendors selected to receive the Phase 3 RPP?No, access to Nellis AFB will not be granted prior to award of Milestone 2 services. A robust package of information will be provided to selected Vendors, which will be used as the basis for Phase 2 pitches and basis of Phase 3 design services.
Q6Interview LocationPlease confirm the location of the Phase 2 oral presentations and whether attendance will be in person, virtual, or hybrid.Phase 2 oral presentations will take place in Las Vegas, NV but not on Nellis AFB. Attendance will be in person.
Q7Font ClarificationCan the font for graphics be Arial 10 point, to provide a readable font within a graphic image or table?Yes, the font for graphics may be Arial 10 point.
Q8Partnering Outcome ExpectationThe AOI describes the Government’s intent to work collaboratively with the selected design-build team through design, preconstruction, construction pricing, and delivery. Given the scale and technical complexity of the Rapid Delivery projects, does the Government plan to require formal, independently facilitated partnering during Milestone 2 and subsequent design and construction work? If so, what partnering outcomes or deliverables does the Government expect?Yes, the Government will require formal facilitated partnering in Milestone 2. Further information regarding partnering requirements will be provided to Vendors invited to participate in Phase 2 interviews.
Q9Scope and Funding PathHow will the Government define the scope and funding path for partnering facilitation under the OTA? May the selected team propose an independent third-party facilitator as part of its Milestone 2 services, with continuation into construction if authorized, or does the Government expect partnering to be provided through the Owner’s Advisor or another Government-directed resource?The Government intends for the selected PDB Vendor to propose an independent third-party partnering facilitator as part of its Milestone 2 services. The Government has already initiated formal facilitated partnering and will provide the name and contact information of that firm; however, the selected Vendor(s) may elect to use an the partnering facilitator of the Vendor's choice.
Q10Limited Qualifying Project ClarificationWill the Government consider limiting qualifying projects under Appendix B – Construction Project Qualification Sheets to projects performed as the Prime Contractor, and excluding projects performed as a subcontractor? We recommend this requirement to ensure offerors demonstrate direct contractual responsibility, accountability, and overall project execution experience. Unlike Prime Contractors, subcontractors do not carry the same level of contractual obligation to the Government. Subcontractors and may have greater flexibility to disengage from a project, presenting additional performance and delivery risks to the Government, whereas the prime must deliver the project regardless if a subcontractor decides to walk away.No, the Government will not consider such a limitation. The Government's evaluation will consider relevant construction experience performed as a prime contractor, joint venture member, Principal Construction Execution Firm, or other construction partner. As stated in Section 4.4.2 of the AOI, respondents shall identify the actual performing construction organization, its role, and the construction management, procurement, field supervision, or self-performance responsibilities exercised on each submitted project. Respondents should submit projects they believe best demonstrate the commercially relevant qualifications of their proposed organizations, consistent with the requirements of the AOI.
Q11Regarding the past performance requirements, will the Government recognize relevant experience performed as the prime contractor as indicative of the respondent’s ability to successfully lead this program, given the prime contractor’s contractual primacy with the Government and responsibility for 100% of overall project performance, including cost, schedule, quality, safety, subcontractor management, and performance and payment obligations?The Government's evaluation will consider relevant construction experience performed as a prime contractor, joint venture member, Principal Construction Execution Firm, or other construction partner. As stated in Section 4.4.2 of the AOI, respondents shall identify the actual performing construction organization, its role, and the construction management, procurement, field supervision, or self-performance responsibilities exercised on each submitted project. Respondents should submit projects they believe best demonstrate the commercially relevant qualifications of their proposed organizations, consistent with the requirements of the AOI.
Q12For Section 4, Southern Nevada Construction Market Strength, will the Government consider broader regional experience and successful execution of large-scale military construction programs outside Southern Nevada as comparable evidence of a team’s ability to secure the labor, subcontractors, equipment, materials, and supply-chain resources necessary to execute the F-47 Rapid Delivery Projects at Nellis AFB?The Government will consider commercially relevant construction experience from Southern Nevada and other geographic markets, including experience executing large-scale military construction programs. As stated in Section 4.5.4 of the AOI, respondents should demonstrate how their proposed construction team will obtain qualified labor, trade partner participation, competitive construction pricing, and reliable construction execution in Southern Nevada. Regional capabilities may reside with any of the proposed construction organizations, including significant construction partners rather than the prime respondent. Respondents should submit the experience and supporting information they believe best demonstrate their proposed team's ability to execute the Nellis F-47 Rapid Delivery Projects, consistent with the requirements of the AOI.
Q13Section 4.4.3 states that “ALL submitted A-E project sheets must document 100% completed design.” We understand the Government’s intent is to evaluate demonstrated experience delivering complete, coordinated, and constructible design solutions, even though the referenced A-E projects are not required to have completed construction. However, in this new environment, traditional projects don’t necessarily require the same level of involvement and collaboration required to successfully execute a PDB project. We respectfully request that completed DB RFP packages ready for solicitation to be allowed and considered as equally qualifying experience compared to traditional DBB and DB projects. Developing a DB RFP goes well beyond traditional criteria development. The A-E team works collaboratively with the Government to define the requirement, establish the program, reconcile scope and budget, develop the technical solution and performance criteria, and establish the basis for project pricing/GMP. These activities directly reflect the collaborative, requirements-driven environment of Progressive Design-Build. Recognizing completed DB RFP experience would therefore allow the Government to evaluate experience that is highly representative of the capabilities required to successfully execute this PDB program.The Government will not make changes to Section 4.4.3 of the AOI.
Q14
Q15
Q16
Q38
Q39
Q40
Q41
Q42
Q43
Q44
Q45
Q46
Q47
Q48
Q49
Q50
Q51
Q52
Q53
Q54
Q55
Q56
Q57
Q58
Q59
Q60
Q61
Q62
Q63
Q64
Q65
Q66
Q67
Q68
Q69
Q70
Q71
Q72
Q73
Q74
Q75
Q76
Q77
Q78
Q79
Q80
Q81
Q82
Q83
Q84
Q85
Q86
Q87
Q88
Q89
Agency Ops Draft RFP HQ0858-21-R-0010MDA Government Comment Matrix Compilation
Approved for Public Release

22-MDA-11261 (8 Sep 22)

&"Times New Roman,Regular"&10 &"-,Regular"&11

File details come from the government source that posted it. Updated .