JBSA SREO RFI Questions Answers (a-o 250124).pdf
PDF 116 KB Posted
- Solicitation number
- FA8903-25-R-1002
About this file
This is a Questions and Answers document for the Joint Base San Antonio (JBSA) Strategic Real Estate Opportunities (SREO) Request for Information (RFI). The Q&A addresses nine questions related to various aspects of the cyber campus infrastructure projects and RFI response requirements.
Key details include: the Cyber Training Center has an estimated cost of $81M and will be built to SCIF-level standards; the 16th Air Force is open to both "fully controlled training space" and "training as a service" options; budget allocations for the 318th RANS and 346th TS are included in the 67th Combat Wing Operations Center budget; the DAF intends to negotiate property lease and power purchase agreements with third parties for energy systems; and the cover page, drawings, plans and pictures do not count toward the page limit for RFI responses. The document also clarifies that DAF 1391s are not prepared for the listed cyber facilities since funding requests have not been submitted to Congress, and that respondents must develop their own cost estimates for RFI responses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JBSA SREO RFI Questions and Answers 250128 v2.pdf | ||
| JBSA Industry Day Slide Deck 20241030.pptx | PPTX presentation | |
| SREO Industry day recording.MP4 | MP4 file | |
| Attendee List for 30 Oct Industry Day.pdf | ||
| Additional Questions for Industry Day.docx | DOCX document | |
| Attach 2 - 705-02 Intelligence Community STD.pdf | ||
| SAWS HQ.pdf | ||
| Attach 1 - Technical Specs for SCIF Version 1.5.1.pdf | ||
| Opportunities.pdf | ||
| Attach 3 - MCFES 20-01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBSA SREO RFI
Questions and Answers
Question # Question Answer
#1 Can you provide the 1391 / MILCON analysis for the costs associated with the following:
(1) Multi-Domain Cyber and Intel Operations Center (16 AF HQ)
(2) 91st Cyber Operations Center
(3) 67th Cyberspace Wing Operations Center
(4) 688th Cyberspace Wing headquarters
(5) Cyber Training Center
No. DAF 1391s are not prepared for proposed projects unless funding requests for military construction of them are submitted to Congress. That has not occurred.
#2 Can you provide annual Facilities Sustainment, Restoration, and Modernization (FSRM) dollars associated with facilities at JBSA operated by or for the following
(1) 16th Air Force
(2) 67th Cyberspace Wing (and associated squadrons and groups)
(3) 688th Cyberspace Wing (and associated squadrons and groups)
Answer pending
#3 For the Cyber Training Center requirement in Opportunity 1, can you state whether the DAF desires a fully controlled space for training or would be open to ‘training as a service’ options that are built, managed, and programmed via a third-party (government, industry, or academia)?
The 16AF is open to both options, “fully controlled training space” and “training as a service,” and if offered, would like details about how each option would be accomplished.
#4 Does the $81M estimated cost of the Cyber Training Center include all interior improvements to make it fully operational and meet ICD 705 standards?
Yes. The $81M estimated cost assumes the facility will be built to a SCIF-level to accommodate the mission.
#5 Can you clarify where the budget allocation exists for the 318th RANS and 346th TS within the 5 infrastructure areas outlined in the cyber campus?
The budget allocations for both the 318th Rapid Assault and Landing Strip (RANS) and the 346th Test Squadron (TS) are included in the budget for the 67th Combat Wing (CW) Operations Center.
#6 The Description of the RFI in section 1.0 & 1.2 states this a request for market research tools and available and adequate potential business sources to provide DAF with information for planning purposes and garner knowledge about interest, capabilities, and qualifications of various members of industry. While all costs associated with responding to the RFI are to be borne by the respondent, is there a budget or estimate of cost associated with implementing the RFI?
No. Each respondent develops its own budget or estimate of cost for a response to an RFI.
#7 Is there an opportunity of the approved respondent to further assist in the development of an
RFP?
No. The DAF is not able to obtain a specific company’s assistance to develop the RFP. This could place such company at an unfair advantage over other respondents that wish to submit a proposal.
#8 Will the DAF procure the energy resiliency component of the RFI using Energy Resilience Contracts under 10 USC § 2912 which allows for the energy equipment to be owned, managed and maintained by a private company?
Yes. The DAF intends to negotiate a property lease and power purchase agreement with third party for energy generated by systems it owns and operates on [or near] JBSA.
#9 I'd like to know if the cover page counts as a page toward the page limit for the submission? No, the cover page does not count as part of the page count. Drawings, plans, and pictures are also allowed outside of the page count.
Page 1 of 1 As of 24 Jan 25