About this file

Attachment 2 - Base Support Letter

View the file

Other files

File Type Posted
Revised_PWS_22_Jan_19.pdf PDF
Q&A_Sheet_(Gov't_Responses).pdf PDF
Revised_PWS_10_Jan_19.pdf PDF
Attach_8_-Schedule_B.XLSX XLSX spreadsheet
RFP_19-R-0010.pdf PDF
Exhibits_A&B.pdf PDF
Attach_1_-_PWS_14_Nov.pdf PDF
Attach_9_-Q&A_Sheet.xlsx XLSX spreadsheet
Attach_4_-Tax_Liability.pdf PDF
Attach_6_-Internal_Confidentiality_Agreements.pdf PDF
Attach_5_-_Offeror_Reps_and_Certs.pdf PDF
Attach_7_-_Clause_52_212-5_and_Add'l_Clauses.pdf PDF
Attach_3_-_SCA_Wage_Determination.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

2D CIVIL ENGINEER SQUADRON (AFGSC)

BARKSDALE AIR FORCE BASE, LOUISIANA

4 December 2018

MEMORANDUM FOR AFCEC/CZR

ATTN: MR. DON WHEELER

FROM: 2 CES/CD

SUBJECT: Base Support for Environmental Restoration Program Project AWUB20197920

1. In support of the DOD ERP initiative to remediate contamination and restore base property from prior Air Force operations, FY19 funding has been allocated by AFCEC to perform cleanup operations at Barksdale AFB through a contract administered by the 772nd Contracting

Squadron. AFCEC/CZOW Installation Support Section (ISS) at Barksdale is managing the overall program.

2. SCOPE: Contractor will perform remedial project to repair storm and erosion damage to the cover at Landfill #2 located adjacent to the Flat River. Project will include repairing holes in the landfill cover caused by falling trees and subsidence, and clearing tress and large limbs from the vicinity of the landfill access road. Contractor will bury any landfill materials exposed by erosional processes, ensuring the debris is covered as required by Louisiana DEQ Solid Waste regulations, and regrade the damaged areas to prevent surface water ponding. Contractor will also perform Land Use Controls inspection of a former munitions burn kettle area at Claiborne

Range. Project to be awarded in FY19 at cost of $185.6K with a Performance Period of approximately 380 days.

3. In support of the subject AFCEC administered contract, AFCEC/CZR Restoration Program

Management Office will provide Contracting Official Representative (COR) overseeing the contract. AFCEC/CZOW Barksdale ISS will:

a. Coordinate installation access for contractor personnel by providing access request forms to 2nd Security Forces Squadron.

b. Provide inspections services to ensure contractor is meeting requirements and invite base personnel to final project review/site inspection meeting.

4. In support of the subject AFCEC administered contract, Barksdale AFB will:

a. Provide access to information in the form of available plans, reports, maps and drawings as necessary to facilitate accomplishment of the work required in the contract

Statement of Work.

b. Authorize the continuing use of an approved staging area for storing equipment and supplies. The contractor shall be responsible for equipment security.

c. Provide assistance to the ISS POC setting up meetings with 2nd Bomb Wing and 307th

Reserve Wing personnel as applicable to this project.

5. POC for this project is Mr. Wallace Robertson at DSN 781-5286, COMM (318) 456-5286.

With his role as the Barksdale Remedial Project Manager, it is understood that the

AFCEC/CZOW Barksdale ISS will be the lead agency in ensuring this project support is accomplished.

JEFFREY K. MCNEELY, GS-14, DAF

Deputy Base Civil Engineer

2018-12-04T11:28:26-0600
MCNEELY.JEFFREY.K.1087080001