RFP Questions Responses

View the file

Other files

File Type Posted
Attachment_15_-_List_of_Wells_to_Be_Abandoned _Well_Installation_Logs_and_Maps.pdf PDF
FA8903-16-Q-0008_-_Exhibit_B.PDF PDF
FA8903-16-Q-0008_-_Exhibit_A.PDF PDF
1)_FA8903-16-Q-0008-PWS_TinkerAltus_08-03-16.docx DOCX document
9a)_FA8903-16-Q-0008_-_Exhibit_A.PDF PDF
3a_-SCA_Wage_Determination_FA8903-16-Q-0008.docx DOCX document
3b_-SCA_Wage_Determination_FA8903-16-Q-0008.docx DOCX document
9b)_FA8903-16-Q-0008_-_Exhibit_B.PDF PDF
1)_FA8903-16-Q-0008-PWS_Final.docx DOCX document
13)_Tinker_Well_Construction_Figures.pdf PDF
12)_Copy_of_Tinker_AFB_FY16_MW_List_(002).xlsx XLSX spreadsheet
8-Notification_of_Compliance_with_Contract_Insurance_Requirements.docx DOCX document
14)_Altus_AFB_FY16_MW_List_for_Abandonment_(003).xlsx XLSX spreadsheet
4-Questions_Template_FA8903-16-Q-0008.docx DOCX document
2b)_FY_16_Altus_Base_Support_Letter_for_Environmental_Projects.pdf PDF
RFQ_FA8903-16-Q-0008.pdf PDF
10-Clause_52.212-3_Offeror_Reps_and_Certs_FA8903-16-Q-0008.docx DOCX document
5-Tax_Liability_FA8903-16-Q-0008.docx DOCX document
2a)_2016_Tinker_Base_Support_Letter_for_AFCEC.PDF PDF
6-Schedule_B_FA8903-16-Q-0008.docx DOCX document
7-Internal_Confidentiality_Agreements_FA8903-16-Q-0005.docx DOCX document
11-Clause_52_212-5_Contract_Terms_and_Conditions_and_Additional_Clauses_FA8903-16-Q-0008.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ QUESTIONS / RESPONSES

Attachment 4

FA8903-16-Q-0008

Base-Wide Well and System Decommissioning, Tinker and Altus AFB

QUESTIONS
ANSWERS
1. Do any of the areas have restricted work hours? Special access or limitations? i.e. low clearance, flight line area access, inside buildings?
Tinker AFB:

-There are wells that require an airfield waiver. This can be coordinated with the Tinker POC assigned to this project but will require approval from Base Civil Engineering and Base Operations personnel. This procedure can take as long as 30-90 days. The contractor shall provide appropriate personnel to escort in the airfield, which will require taking an airfield driving test administered by Base Airfield Operations and can take several hours. Escort personnel shall also have all appropriate badging to allow access to the airfield and or restricted areas. The contractor shall coordinate testing with Base Operations personnel. POCs shall be provided at award.

-There are no wells inside buildings.

-Well 65C is located on private property and access shall be coordinated with the property owner. Access to well cluster 2-125 shall be coordinated with the Natural Resources POC. Well TOB-3C is located on county property and access shall be coordinated with the county (a key is required to unlock the gate for access). POCs and other details required for entry to these wells shall be provided at award.

-Note that all wells have been surveyed. Coordinates will be available if a well cannot be located in the field.

Altus AFB:

-Six (6) wells (WL054, WL056, WL059, WL362, WL364, and WL366) are located on the parking apron, a controlled access area. AAFB will coordinate access with Base Operations for these wells. This area will be closed between 15 August 2016 and 15 November 2016 for a construction project to replace the current asphalt surface with concrete. If the contractor is able to abandon these wells in coordination with the construction project, access will be available during the week days. If the contractor is unable to abandon these wells during the apron closure period, access will be limited to the weekend

-No wells are located inside buildings.

2. Will all utilities be cleared and marked by the base personnel or does a private utility locating service need to be contacted?
Tinker AFB:

-The contractor shall coordinate utility clearance with Base Civil Engineering through standard procedures already in place.

Altus AFB:

-The RPM will coordinate with Base personnel to clear and mark utilities (electrical, gas, water, sewer) using standard procedures already in place. The contractor is responsible for notifying Call OKIE for communication utilities.

3. Are all the wells easily accessible? i.e. Would we need to go through fenced areas? If so is there a gate (what size)? Are any wells inside buildings?
Tinker AFB:

-Well 2-103C is located on Landfill 6, which is fenced. A key to unlock the gate will be provided when needed. Note that this key also unlocks padlocks on stick up wells. Access to well 2-221D may have to be coordinated with the medical facility folks located near the well (if any parking spaces are to be blocked, contractor shall coordinate with Base CE regarding temporary loss of parking spaces). This process usually takes 30 days. POCs and other details required for entry to these wells will be provided at award.

Altus AFB:

-There are no wells located inside of buildings or fenced areas.

4. Is perforation of the stainless steel casing allowed/necessary?
Tinker AFB:

-Not applicable, as stainless steel wells (or portions thereof) shall be abandoned in place by grouting.

Altus AFB:

-Not applicable.

5. Altus AFB The Performance Work Statement section 5.2 states, “Abandon in place twenty (20) wells.” In document “Altus_AFB_FY16_MW_List_for_Abandonment_ (003).xlsx” the list contains 42 wells with 3 abandoned in place and 39 overdrilled. What is the correct scope?

Altus AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

6. Tinker AFB The Performance Work Statement section 5.2 says, “Abandon in place five (5) wells”, “Over drill and remove five (5) wells”, “Abandon in place twenty (20) wells”, “Over drill and remove twenty (20) additional wells” for a total of (50) wells. In the document “Copy_of_Tinker_AFB_FY16_MW_List_(002).xlsx” there are 83 wells on the 4 worksheets. What is the correct scope?

Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

7. Tinker AFB In the document “Copy_of_Tinker_AFB_FY16_MW_List_(002).xlsx” Table 4-1 (5) wells have screen shallower than 20’ bgs and are proposed to be plugged in place.

Per OWRB regulations 785:35-11-2. Plugging requirements for site assessment observation wells, monitoring wells and geotechnical borings (a)(2) “If contaminated soil or contaminated groundwater is present or was previously present in the well and the top of the screen is less than 20 feet below land surface, overdrilling of the well is required.” (http://www.owrb.ok.gov/util/rules/pdf_rul/current/Ch35.pdf). Please confirm that these wells are to be plugged in place Tinker AFB:

-The two (2) wells less than 20 feet deep are included on the 2006 permit modification as approved to be dropped from base sampling requirements and were not previously contaminated. Therefore, these two (2) wells can be abandoned according to the updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps”.

-Two (2) other wells have tops of screen above the 20 foot depth criterion and both are also on the 2006 permit modification to be as approved to be dropped from base sampling requirements and were not previously contaminated. Therefore, these two (2) wells can be abandoned according to the updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

8. Section 5.2 of the PWS indicates a total of 50 wells at Tinker AFB that require decommissioning (10 at CG040, and 40 at CG037, CG038, OT001, and LF016). However, Attachment 12 refers to 83 total wells appearing to require decommissioning (33 in Table 1-1, and 50 total in Tables 4-1, 4-2, and 4-3). Please clarify the total number of wells requiring decommissioning at Tinker AFB. If the number is 50, please indicate those wells in Attachment 12 that are covered under this contract.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

9. Section 5.2 of the PWS indicates a total of 25 wells at Tinker AFB that will require abandonment in place. However, Attachment 12, Table 4-1 indicates 36 “Wells to be Abandoned With Grout to Total Depth.” Please clarify which number is accurate and, if applicable, which of the wells in Attachment 12, Table 4-1 are to be abandoned.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

10. Section 5.2 of the PWS indicates a total of 25 PVC-cased wells to be overdrilled at Tinker AFB. However, Attachment 12, Tables 4-2 and 4-3 indicate a total of 14 wells to be overdrilled. Please clarify which number is accurate and, if applicable, which of the wells in Attachment 12, Tables 4-2 and 4-3 apply.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

11. Section 5.2 of the PWS indicates a total of 20 wells to be abandoned in place at Altus AFB and no wells to be overdrilled. However, Attachment 14 indicates 42 wells to be abandoned, and appears to include a mix of abandon-in-place and overdrilling methods, with overdrilling being the predominant method. Please clarify the number of wells to be abandoned at Altus AFB, and which specific wells in Attachment 14 this number includes.
Altus AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

12. For both Tinker AFB and Altus AFB, please indicate for all wells to be decommissioned what surrounding surface the wells are completed in (asphalt, concrete, grass) for restoration purposes.
Tinker AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

- Note: Six (6) wells (WL054, WL056, WL059, WL362, WL364, and WL366) located on the parking apron are currently completed in asphalt. A construction project to replace the current asphalt surface with concrete will take place between 15 August 2016 and 15 November 2016. If the contractor is able to abandon these wells prior to construction of the concrete area where the wells are located site restoration of the asphalt will not be required. If the contractor is unable to abandon these wells prior to construction of the concrete area where the wells are located, site restoration will require matching the concrete thickness (8 inches or more) and concrete strength (650 psi flex strength) of the new surrounding concrete.

13. For Altus AFB, please indicate which wells to be abandoned are flush mount vs. stick-up, and which wells have protective bollards that will need to be removed.
Altus AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

-There are no bollards.

14. Attachment 13 for Tinker AFB provided construction information for 32 wells. For all wells not included in Attachment 13 for Tinker AFB, please indicate which are flush mount vs. stick-up, and which wells have protective bollards that will need to be removed.
Tinker AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

15. Section 1.1 of the PWS indicates that the contractor will “remove and dispose of piping, equipment, housing, fencing, and concrete pads…” Please indicate which wells, if any, at Tinker AFB and Altus AFB will require fencing removal and how much fencing is present to be removed. In addition, please identify any aboveground features, including housings or piping for pump and treat (along with quantities), for specific wells that requires removal.
Tinker AFB:

-No fencing shall be removed. Only material associated with a well, such as casing, screen, dedicated well pumps, protective surface casing, concrete pad, well vault, bollards, overdrilled materials such as grout and filter pack etc. shall be disposed.

Altus AFB:

-Not applicable.

16. If these installations are under a Performance Based Remediation (PBR) contract is the PBR contractor precluded from bidding due to Conflict of Interest or an unfair advantage?
These installations are included in PBR contracts. However, the work outlined in the PWS is not part of the existing PBR contracts. Therefore, a conflict would not exist.
17. If these installations are under a Fence-To-Fence Environmental Compliance contract is the contractor precluded from bidding due to Conflict of Interest or an unfair advantage?
The work outlined in the PWS is not included in a Fence-to-Fence Environmental Compliance contract.
18. Was a Sources Sought utilized to develop the acquisition strategy for this opportunity? If so, what was the date of the Sources Sought?
A Sources Sought was not utilized.
19. This is not a complex environmental project nor is it that significant of a dollar amount so what is the justification for not “setting this aside” for Small Disadvantaged Business?
Market research and previous acquisition history indicate that a set-aside to a specific socio-economic category could result in limited responses and hinder competition. Therefore, this requirement was issued as a total small business set-aside.
20. Where is the documentation of water quality at each location so the contractor can determine proper health/safety protocols, materials disposal, etc.?
Tinker AFB:

-The wells to be abandoned can be assumed to be ‘clean’ such that level ‘D’ PPE and safety precautions only should be required.

Altus AFB:

-The wells to be abandoned can be assumed to be ‘clean’ such that only level ‘D’ PPE and safety precautions should be required.

21. Has a contractor performed similar work to this for the government in the past?

If available, please provide the incumbent contract number.

If you are unable to provide a contract number, is it safe to assume this is a new requirement for the government?

Yes; however, this is considered a new requirement for the Government.

22. Can a current well location map be provided for each Base?
Tinker AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

23. Have all electrical panels, electrical conduits, lines, etc., to existing well heads and pumps been de-energized, decommissioned, or otherwise disconnected or removed?
Tinker AFB:

-All wells to be abandoned are monitoring wells and no electrical is associated. However, many wells have dedicated submersible (Grundfos) pumps and discharge tubing that will need to be removed and disposed.

Altus AFB:

-Not applicable.

24. Does use of term "housing" refer to wells' protective surface covers, or are some wells covered by larger housing structures? If so, please quantify for planning and costing purposes.
Tinker AFB:

-There is no “housing” associated with wells at Tinker AFB. Section 1.1 of the PWS has been revised to delete “housing”.

Altus AFB:

- There is no “housing” associated with wells at Altus AFB. Section 1.1 of the PWS has been revised to delete “housing”

25. PWS Introduction states: " …remove and dispose of piping, equipment, housing, fencing, and concrete pads…." Do wells contain internal pumping equipment and pipes other than typical well casing? If so, please quantify for planning and costing purposes.
Tinker AFB:

-No fencing shall be removed. Only material associated with a well, such as casing, screen, dedicated well pumps, protective surface casing, concrete pad, well vault, bollards, overdrilled materials such as grout and filter pack etc. shall be disposed.

Altus AFB:

-Not applicable.

26. Can Contractor assume use of term "piping" in PWS Section 5.2 refers to well casing and not drop pipe or other internal pipes used for water conveyance?
Tinker AFB:

-It refers to the well casing.

Altus AFB:

-It refers to the well casing.

27. Are concrete pads at flush mounted wells required to be removed and replaced with soil or asphalt?
Tinker AFB:

- They need to be restored to their pre-project condition. Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB:

- They need to be restored to their pre-project condition. Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

28. Would any cutting, torching, or other hot-work permit tasks be anticipated?
Tinker AFB:

-Only if the contractor deems this necessary.

Altus AFB:

-Only if the contractor deems this necessary.

29. Are there any black-out dates within the POP when fieldwork would not be able to be performed?
Tinker AFB:

-Availability and access to sites will be coordinated with appropriate POCs post award.

Altus AFB:

-Availability and access to sites will be coordinated with appropriate POCs post award.

30. Per PWS, Introduction on page 2, the wells to be abandoned are part of the Installation Restoration Program (IRP) for both bases; however, it is not clear the contaminant(s) of these wells. Can the Air Force provide contaminant history or the lab data from the most recent sampling event(s) and bore logs for Worker and Site Safety, and Integrated Derived Waste (IDW) management?
Tinker AFB:

-The wells to be abandoned can be assumed to be ‘clean’ such that level ‘D’ PPE and safety precautions only should be required.

Altus AFB:

-The wells to be abandoned can be assumed to be ‘clean’ such that level ‘D’ PPE and safety precautions only should be required.

31. In PWS Section 3.6.1 -Safety Requirements, it discusses OSHA requirements and references CDRL A002b; however, Attachment 9a CDRL A003 is “OSHA Report”. Neither CDRL A002a nor CDRL A002b are included in the CDRL tables. Please clarify and verify CDRL designations against PWS requirements.
-Please see updated PWS and CDRLs.
32. In PWS Section 3.6.2 –Permits, it discusses permits to implement site specific projects and sites CDRL A003; however, CDRL A003 is “OSHA Report”. Please clarify and verify CDRL designations against PWS requirements.
-Please see updated PWS and CDRLs.
33. In PWS Section 4.8.2 – Health and Safety Plan (HSP), the Contractor shall utilize an existing HSP and tailor it to this specific scoped effort. Can the Air Force provide an existing HSP for a related work effort?
Health and Safety Plans are typically specific to each contractor or company. It is assumed that the contractor has abandoned wells at other sites in the past and should have an HSP that can be tailored to the current requirement. If necessary, a previous HSP can be provided post award.
34. In PWS Section 4.8.2 – Health and Safety Plan (HSP), the CDRL A005 sited in Attachment 9a, Exhibit A is for a Quality Control Plan. Please clarify.
-Please see updated PWS and CDRLs.
35. Is an HSP a deliverable? There is no HSP deliverable listed in Exhibits A & B.
-Please see updated PWS and CDRLs.
36. In PWS Section 4.9 –Quality Control Program (QCP), CDRL reference is missing. PWS references "Quality Program" and no Plan, Exhibit A uses term "Quality Plan" and Data Item Number does not correspond to PWS description; please clarify.
-Please see updated PWS and CDRLs.
37. Can the QCP be incorporated as an appendix into the Work Plan or is it required to be provided as a separate document?
-Please see updated PWS and CDRLs.
38. Discrepancy noted in the total number of wells to be abandoned, for each of the Air Force Bases. On Page 8, in Section 5.2 of the PWS, Tinker AFB has a 50 total wells to be abandoned and Altus AFB has total of 20 wells to be abandoned; however, in Attachment 12 –Tinker AFB Monitoring Wells Abandonment List, a total 33 wells are listed and in Attachment 14 – Altus AFB Monitoring Well Abandonment List has a total of 42 wells listed. Clarify the number of wells, well IDs, total depth, and locations for each of the wells to be abandoned.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

39. Discrepancy noted in the Site ID for the wells to be abandoned at Altus Air Force Base and Tinker Air Base. On Page 8 of the PWS, Altus AFB has Sites WP001, WP002, ST012, LF014, SS016, SS017, DP019, and FT007 listed however, in Attachment 14 – Altus AFB Monitoring Well Abandonment List has the following site IDs: (blank site ID lines), SS010, SS022, WP001, SS013, and SS016. Tinker AFB Monitoring Well Abandonment List excludes Site IDs completely. Clarify Site IDs and well IDs to be abandoned at each of the Bases.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB -Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

40. Discrepancy noted in the Abandonment techniques for the wells to be abandoned at Altus Air Force Base. In PWS section 5.2 –Description of Services (on Page 8), for Altus AFB states 20 wells to be abandoned in place (AIP) and No wells to be over drilled; however, in Attachment 14 – Altus AFB Monitoring Well Abandonment List, there are three wells to be AIP and 39 wells to be over-drilled. In the same section, Tinker AFB has 25 wells to be abandoned in place (AIP) and 25 wells to be over drilled. Tinker AFB Monitoring Well Abandonment List excludes abandonment techniques. Provide clarification on number of wells to be AIP or over drilled for each Base.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB -Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

41. PWS section 5.2 –Description of Services (on Page 8) states that waste will be non-hazardous. Is generator information available for this non-hazardous waste?
Tinker AFB:

-No, however wells are ‘clean’, so any material to be disposed of can be considered ‘non-hazardous’ for bidding purposes. The contractor will need to test all material for classification purposes prior to disposal.

Altus AFB:

-No, however wells are ‘clean’, so any material to be disposed of can be considered ‘non-hazardous’ for bidding purposes. The contractor will need to test all material for classification purposes prior to disposal.

42. In PWS section 5.2 –Description of Services (on Page 8), “Well installation logs and list of well to be included as an attachment.” Can well installation logs for Altus be provided? They appear to be missing from the attachments.
Altus AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

43. In PWS section 5.2 –Description of Services (on Page 8), the final well abandonment reports are to be integrated into GIS for each base (CDRLs A002c, A002d). There are no CDRLS A002c and A002d in Exhibit A. Please clarify.
-Please see updated PWS, CDRLs and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.
44. In PWS section 5.3 – Service Summary (on Page 8), the Contractor shall create and maintain…. a Service Summary of written and electronic records sufficient to recreate each monitoring event. Can the Air Force clarify and provide the scope for these stated monitoring events?
-Please see updated PWS and CDRLs.
45. Several items in the CDRL tables are not discussed in the PWS. For example CDRL B007 – Master Document List. Will the Air Force require completion of all items in the CDRL table even if they are not included in the PWS?
-Please see updated PWS and CDRLs.
46. What is Exhibit A CDRL A006, subtitle RCRA Part II Permit Renewal?
-Please see updated PWS and CDRLs.
47. CDRL A006 – RCRA Part II Permit Renewal has Kansas Department of Health and Environment included as a part of the review/approval process. Please explain.
-Please see updated PWS and CDRLs.
48. It appears some Attachment designations do not correspond between RFQ Letter and PWS references. Please verify.
Please see updated PWS, CDRLs and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

49. ALTUS AFB

The Performance Work Statement Section 5.2 says, “Abandon in place twenty (20) wells.” In the excel document “Altus_AFB_FY16_MW_List_for_Abandonment (003_.xlsx” the list contains forty-two (42) wells with three (3) abandoned in place and thirty-nine (39) over-drilled. What is the correct scope?

Altus AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

50. TINKER AFB

The Performance Work Statement Section 5.2 says, “Abandon in place five (5) wells”, “Over drill and removed five (5) wells”, “Abandon in place twenty (20) wells”, “Over drill and remove twenty (20) additional wells” for a total of fifty (50) wells. In the excel document “Copy_of_Tinker_AFB_FY16_MW_List_(002).xlsx” there are 33 wells on Table 1-1. What is the correct scope?

Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

51. ALTUS AFB

The Performance Work Statement Section 5.2 says, “Abandon in place twenty (20) wells.” There was no attachment included in the RFQ package showing well construction figures for Altus AFB. Can/Will well construction figures be provided for those wells to be abandoned at Altus AFB.

Altus AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

52. Will the Work Plan be submitted to a regulatory agency for review?
Tinker AFB:

-No.

Altus AFB:

-No.

53. Section 5.2 states that 25 wells will be abandoned in place to 65 feet bgs and 25 wells will be overdrilled to 65 feet bgs at Tinker AFB. Table 1-1 provided by the Air Force lists only 33 wells to be abandoned. Table 1-1 also shows up to 13 wells with total depths ranging from 100 to over 200 feet deep. The Tinker Well Completion Figures provided by the Air Force show many wells extending to depths greater than 100 feet bgs. Please clarify the number of wells to be abandoned and the depths for each of those wells.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

54. Please clarify if all of the 33 wells shown on Table 1-1 for Tinker AFB are to be abandoned and provide specific well details for the remaining 17 wells of the 50 wells to be abandoned.
Tinker AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

55. Section 5.2 states that 20 wells are to be abandoned in place to 28 feet bgs at Altus AFB. The table provided in Attachment 14 lists 41 wells to be abandoned. Please clarify which 20 wells shown on Attachment 14 are to be abandoned as only 14 of the 41 wells shown are greater than 20 feet deep.
Altus AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

56. Attachment 14 shows that only 3 of the 41 wells listed are to be abandoned in place. Please confirm that the decommissioning method for the 20 wells identified in the PWS is abandon in place.
Tinker AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB:

-Please see updated PWS and Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

57. Attachment 14 lists a number of wells as being in Restricted Areas. Please specify the total number of the 20 wells to be abandoned at Altus AFB that require access in a Restricted Area. Also, please specify the requirements for gaining access to these Restricted Areas and if an escort is required for these Restricted Area locations.
Altus AFB:

-Six (6) wells (WL054, WL056, WL059, WL362, WL364, and WL366) are located on the parking apron, a controlled access area. AAFB will coordinate access with Base Operations for these wells. This area will be closed for a construction project between 15 August 2016 and 15 November 2016. If the contractor is able to abandon these wells in coordination with the construction project, access will be available during the week days. If the contractor is unable to abandon these wells during the apron closure period, access will be limited to the weekend. In addition, if the contractor is unable to abandon these wells during the parking apron closure, the contractor will be required to match the concrete thickness (8 inches or more) and concrete strength (650 psi flex strength) of the new surrounding concrete.

58. Section 4.8 requires preparation of a Work Plan and Health and Safety Plan. CDRL A005 indicates that a Quality Control Plan is to be prepared. Please clarify if a Quality Control Plan is to be prepared as part of the Plans (Section 4.8).
-Please see updated PWS and CDRLs.
59. CDRL A006 is subtitled RCRA Part II Permit Renewal. This activity is not discussed in the PWS. Please clarify if the contractor is to perform this RCRA Part II Permit Renewal and provide explanation as to what the contractor is supposed to do to complete this activity.
-Please see updated PWS and CDRLs.
60. There is no CDRL for the Health and Safety Plan. Please provide the CDRL for the Health and Safety Plan.
-Please see updated PWS and CDRLs.
61. There is no CDRL for the Well Abandonment Report. Please provide the CDRL for the Well Abandonment Report.
-Please see updated PWS and CDRLs.
62. Please clarify if there are limits to the working hours on each Base.
Tinker AFB:

-The Base has normal government working hours.

Altus AFB:

-The working hours are jointly agreed to by the base sponsor and the contractor.

63. Can the contractor work on Saturday and Sunday at both Bases?
Tinker AFB:

-The Base has normal government working hours.

Altus AFB:

-Yes.

-Six (6) wells (WL054, WL056, WL059, WL362, WL364, and WL366) are located on the parking apron, a controlled access area. AAFB will coordinate access with Base Operations for these wells. This area will be closed for a construction project between 15 August 2016 and 15 November 2016. If the contractor is able to abandon these wells in coordination with the construction project, access will be available during the week days. If the contractor is unable to abandon these wells during the apron closure period, access will be limited to the weekend. In addition, if the contractor is unable to abandon these wells during the parking apron closure, the contractor will be required to match the concrete thickness (8 inches or more) and concrete strength (650 psi flex strength) of the new surrounding concrete.

64. Are any of the wells located in an area that would require an Airfield Waiver at either Base?
Tinker AFB:

-There are wells that require an airfield waiver. This can be coordinated with the Tinker POC assigned to this project but will require approval from Base Civil Engineering and Base Operations personnel. This procedure can take as long as 30-90 days. The contractor shall provide appropriate personnel to escort in the airfield, which will require taking an airfield driving test administered by Base Airfield Operations and can take several hours. Escort personnel shall also have all appropriate badging to allow access to the airfield and or restricted areas. The contractor shall coordinate testing with Base Operations personnel. POCs shall be provided at award.

Altus AFB:

-No.

65. Can decon water be disposed at each Base either through the sanitary/storm sewer or through an active treatment system or does it need to be containerized and transported off site for disposal as non-hazardous liquid?
Tinker AFB:

-Decon water can be disposed of at the Tinker AFB waste water pre-treatment plant after coordination. POC shall be provided at award. The decon water shall be tested and classified as with any other material to be disposed.

Altus AFB:

-Decon water must be containerized and transported off site for disposal as non-hazardous liquid.

66. Please specify the number of wells at each base that are flush mount and the number of wells that have aboveground completions with concrete pads and bollards.
Tinker AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

Altus AFB:

-Please see updated Attachment 15 - “List of Wells to Be Abandoned, Well Installation Logs and Maps” which replaces Attachments 12-14.

67. Please clarify that for wells completed above grade with bollards and concrete pads that the concrete pads and bollards need to be removed.
Tinker AFB:

-All surface completion materials at wells to be abandoned at Tinker AFB shall be properly disposed.

Altus AFB:

-Not applicable.

68. Are all well locations easily accessible with a truck-mounted drill rig?
Tinker AFB:

-Yes.

Altus AFB:

-Yes.

69. Are there any well locations that have height restrictions that would require limited access type drill rig?
Tinker AFB:

Altus AFB

FOR OFFICIAL USE ONLY