TacRL-34 PDP Sched DRAFT.docx DOCX document
TacRL-3 4 draft RFP CRM.xlsx XLSX spreadsheet
FA8818-21-C-0002 TacRL 4 Draft Model Contract v4.docx DOCX document
TacRL-3 4 Appendix B-SF1407-14e.pdf PDF
TacRL-3 4 Appendix C-SF-328.pdf PDF
TacRL-4 MRD DRAFT.docx DOCX document
PWS TacRL-3 4 TacRL-4 -DRAFT.docx DOCX document
TacRL-3 MRD DRAFT.docx DOCX document
DRAFT CSS TACRL 3 4.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RSLP CATEGORY 1 SFWC

SFWC (Cat 1) Status Evidence Approvals

A Missile System Prelaunch Safety Package

(CDRL A010) has been created and accepted by the cognizant range.

A System Safety Program Plan (CDRL A020) has been created and accepted by the cognizant range.

A Safety Assessment Report (CDRL A020) has been created and accepted by the cognizant

A Flight Safety Data Package (CDRL A010) has been created and accepted by the cognizant

A FTS Failure Modes, Effects and Criticality

Analysis has been created and accepted by the cognizant range.

A LV Reliability Analysis (CDRL A032) has been created and accepted by the cognizant

A Requirements Verification and Traceability

Matrix (CDRL A021) has been created and approved as complete at the Pre-Ship Review.

A LV-SV ICD (CDRL A004) has been created and approved by all parties (LV and SV) with signatures.

A LV-Range ICD (e.g. Program Requirements

Document) has been created and approved by all parties (LV and Range) with signatures.

A LV-Range ICD (e.g. Facility Requirements

Document) has been created and approved by all parties (LV and Range) with signatures.

A Space Debris Assessment Report (CDRL

A015) has been created and approved by the cognizant range and by SMC/ENC, SMC/SES and SMC/JAQ.

The AF Form 813 is completed, coordinated with SMC/ENC and signed.

A System Requirements and Concept Review

(CDRL A002) has been conducted by the LSC with a final package submitted and risks/burndown identified.

A System Requirements and Concept Review has been determined to be complete with all liens or action items addressed via COR letter.

A Mission Design Review (CDRL A002) has been conducted by the LSC with a final package submitted and risks/burndown identified.

A Mission Design Review has been determined to be complete with all liens or action items addressed via COR letter.

A Coupled Loads Analysis (CDRL A015) has been performed between LV and SV and accepted by both parties.

A predicted launch environments analysis

(CDRL A015) has been performed for LV and

SV and accepted by both parties.

A trajectory and performance analysis (CDRL

A015) has been performed for the LV and accepted.

A RF analysis for payload integration (CDRL

A015) has been performed for the LV and SV and accepted.

An antenna patterns and link analysis for payload integration (CDRL A015) has been performed for the LV and SV and accepted.

A Pedigree Review (CDRL A002) has been conducted by the LSC with a final package submitted.

A Pedigree Review has been determined to be complete with all liens or action items

A Pre-Ship Review (CDRL A002) has been submitted with risks/burndown identified.

A Pre-Ship Review has been determined to be complete with all liens or action items

A Mission Readiness Review has been submitted and residual risk identified with acceptance.

A Mission Readiness Review has been determined to be complete with all liens or action items addressed via COR letter.

A Cyber Security Implementation Plan (CDRL

A025) has been created and approved by the cognizant ISSO/ISSE/ISSM.

The FAA license package if required (CDRL

A010) is completed with license granted.

The FCC license package is completed for frequency spectrum with license granted.

The Mission Notebook (CDRL A016) is completed per PWS paragraphs 1.8.10.10 and approved by the cognizant DoLWG.

The Integrated Field Processing Procedure

(CDRL A012) is completed per PWS paragraphs 1.8.10.9.1 and approved by the cognizant RWG.

The Mission Simulation Test is completed at the Range with both LV and SV approvals to proceed.

The FTS End-to-End Test is completed at the

Range with both LV and Range approvals to proceed.

Range ELS and Waivers approved.

Post Flight Review CDRLs (CDRL A017) will be delivered by the LSC with any lessons learned documented.

The Post Flight Review is accepted via COR letter.

ACRONYMS/ABBREVIATIONS

Acronym/Abbreviation Description

AFSPC Air Force Space Command

AFSPC/CC AFSPC Commander

AFSPCI AFSPC Instruction

AoA Analysis of Alternatives

ATR Acceptance Test Report

C Compliant

CATEX Categorical Exclusion

CCAFS Cape Canaveral Air Force Station

CCAM Collision Contamination Avoidance Maneuver

CCB Configuration Control Board

CDRL Contract Data Requirements List

CIL Critical Item List

CLA Coupled Loads Analysis

CM Configuration Management

CONOPS Concept of Operations

COR Contracting Officer’s Representative

CPD Capability Production Document

CRR Certification Readiness Review

CVD Compliance Verification Document

DAS Daily Activity Schedule

DoD Department of Defense

DoLWG Day of Launch Working Group

DOORS Dynamic Object Oriented Requirements System

DRIP Design Review Information Package

EA Environmental Assessment

EICD Electrical ICD

EIS Environmental Impact Statement

ELS Equivalent Level of Safety

EMC Electromagnetic Compatibility

EMI Electromagnetic Interference

EOLP End Of Life Plan

ESOH Engineering, Safety and Occupational Health

FAA Federal Aviation Administration

FCA Functional Configuration Audit

FFRDC Federally Funded Research and Development Centers

FMEA Failure Modes and Effects Analysis

FMECA Failure Modes Effects and Criticality Analysis

FRD Facility Requirements Document

FRR Flight Readiness Review

FTA Fault Tree Analysis

FTS Flight Termination System

GFE Government Furnished Equipment

GFP Government Furnished Property

GIDEP Government/Industry Data Exchange Program

GNC Guidance Navigation & Control

GOP Ground Operations Plan

HAR Hardware Anomaly Report

HTS Hazard Tracking System

ICD Interface Control Document

ILC Initial Launch Capability

IMS Integrated Master Schedule

IPP Integrated Planning Process

IPT Integrated Product Team

IRRT Independent Readiness Review Team

ISSE Information System Security Engineer

IV&V Independent Verification and Validation

KPP Key Performance Parameters

LEX Small Launch and Targets Division

LLDB Lessons Learned Database

LRR Launch Readiness Review

LSC Launch Services Contractor

LSIC Launch Service Integration Contractor

LSSA Launch Site Safety Agreement

LV Launch Vehicle

LVSM Launch Vehicle Single Manager

MA Mission Assurance

MAA Mission Area Assessment

MAC Mission Assurance Contractor

MARS Mid Atlantic Regional Spaceport

MD Mission Director

MDR Mission Design Review

MHE Material Handling Equipment

MICD Mechanical ICD

MID Mission Information Document

MNA Mission Needs Assessment

MNS Missions Needs Statement

MRD Mission Requirements Document

MRR Mission Readiness Review

MSPSP Missile System Prelaunch Safety Package

MTO Mass To Orbit

NASA National Aeronautics and Space Administration

NEPA National Environmental Policy Act

NOAA National Oceanic and Atmospheric Administration

ORD Operational Requirements Document

PC Planned Compliance

PCA Physical Configuration Audit

PESHE Programmatic Environmental Safety and Occupational Health

Evaluation

PFR Post Flight Review

PR Pedigree Review

PRD Program Requirements Document

PSC-A Pacific Spaceport Complex - Alaska

PSR Pre Ship Review

PWS Performance Work Statement

QTR Qualification Test Review or Reports

RCC Range Commander’s Council

RDT&E Research Development Test & Evaluation

RFD Request For Deviation

RFW Request For Waiver

RSLP Rocket System Launch Program

RVTM Requirements Verification and Traceability Matrix

RWG Range Working Group

SDAR Space Debris Assessment Report

SDD Software Design Document

SDP Software Development Plan

SE Systems Engineering

SEFT Systems Engineering Functional Team

SEMP Systems Engineering Management Plan

SEP Systems Engineering Plan

SFWC Space Flight Worthiness Criteria

SHAR System Hazards Assessment Report

SIL Software Integration Laboratory

SLIS Small Launch Interface Specification

SLPRD Small Launch Performance Requirements Document

SOW Statement of Work

SMC Space and Missile Systems Center

SMC/CC SMC Commander

SMCI SMC Instruction

SRCR Service Requirements and Concept Review

SRR Service Requirements Review

SSPP Systems Safety Program Plan

STD Software Test Description

SV Space Vehicle

SWCM Software Configuration Management

TAR Test Anomaly Report

TE Transporter Erector

TEPP Test and Evaluation Program Plan

TIM Technical Interchange Meeting

TP Test Procedures

TRR Test Readiness Review

USAF United States Air Force

VAFB Vandenberg Air Force Base

VV&A Validation, Verification and Accreditation

WFF Wallops Flight Facility