TacRL-3 4 Appendix A - Cat 1 SFWC.pdf
PDF 265 KB Posted
- Solicitation number
- FA8818-21-R-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TacRL-34 PDP Sched DRAFT.docx | DOCX document | |
| TacRL-3 4 draft RFP CRM.xlsx | XLSX spreadsheet | |
| FA8818-21-C-0002 TacRL 4 Draft Model Contract v4.docx | DOCX document | |
| TacRL-3 4 Appendix B-SF1407-14e.pdf | ||
| TacRL-3 4 Appendix C-SF-328.pdf | ||
| TacRL-4 MRD DRAFT.docx | DOCX document | |
| PWS TacRL-3 4 TacRL-4 -DRAFT.docx | DOCX document | |
| TacRL-3 MRD DRAFT.docx | DOCX document | |
| DRAFT CSS TACRL 3 4.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RSLP CATEGORY 1 SFWC
SFWC (Cat 1) Status Evidence Approvals
A Missile System Prelaunch Safety Package
(CDRL A010) has been created and accepted by the cognizant range.
A System Safety Program Plan (CDRL A020) has been created and accepted by the cognizant range.
A Safety Assessment Report (CDRL A020) has been created and accepted by the cognizant
A Flight Safety Data Package (CDRL A010) has been created and accepted by the cognizant
A FTS Failure Modes, Effects and Criticality
Analysis has been created and accepted by the cognizant range.
A LV Reliability Analysis (CDRL A032) has been created and accepted by the cognizant
A Requirements Verification and Traceability
Matrix (CDRL A021) has been created and approved as complete at the Pre-Ship Review.
A LV-SV ICD (CDRL A004) has been created and approved by all parties (LV and SV) with signatures.
A LV-Range ICD (e.g. Program Requirements
Document) has been created and approved by all parties (LV and Range) with signatures.
A LV-Range ICD (e.g. Facility Requirements
Document) has been created and approved by all parties (LV and Range) with signatures.
A Space Debris Assessment Report (CDRL
A015) has been created and approved by the cognizant range and by SMC/ENC, SMC/SES and SMC/JAQ.
The AF Form 813 is completed, coordinated with SMC/ENC and signed.
A System Requirements and Concept Review
(CDRL A002) has been conducted by the LSC with a final package submitted and risks/burndown identified.
A System Requirements and Concept Review has been determined to be complete with all liens or action items addressed via COR letter.
A Mission Design Review (CDRL A002) has been conducted by the LSC with a final package submitted and risks/burndown identified.
A Mission Design Review has been determined to be complete with all liens or action items addressed via COR letter.
A Coupled Loads Analysis (CDRL A015) has been performed between LV and SV and accepted by both parties.
A predicted launch environments analysis
(CDRL A015) has been performed for LV and
SV and accepted by both parties.
A trajectory and performance analysis (CDRL
A015) has been performed for the LV and accepted.
A RF analysis for payload integration (CDRL
A015) has been performed for the LV and SV and accepted.
An antenna patterns and link analysis for payload integration (CDRL A015) has been performed for the LV and SV and accepted.
A Pedigree Review (CDRL A002) has been conducted by the LSC with a final package submitted.
A Pedigree Review has been determined to be complete with all liens or action items
A Pre-Ship Review (CDRL A002) has been submitted with risks/burndown identified.
A Pre-Ship Review has been determined to be complete with all liens or action items
A Mission Readiness Review has been submitted and residual risk identified with acceptance.
A Mission Readiness Review has been determined to be complete with all liens or action items addressed via COR letter.
A Cyber Security Implementation Plan (CDRL
A025) has been created and approved by the cognizant ISSO/ISSE/ISSM.
The FAA license package if required (CDRL
A010) is completed with license granted.
The FCC license package is completed for frequency spectrum with license granted.
The Mission Notebook (CDRL A016) is completed per PWS paragraphs 1.8.10.10 and approved by the cognizant DoLWG.
The Integrated Field Processing Procedure
(CDRL A012) is completed per PWS paragraphs 1.8.10.9.1 and approved by the cognizant RWG.
The Mission Simulation Test is completed at the Range with both LV and SV approvals to proceed.
The FTS End-to-End Test is completed at the
Range with both LV and Range approvals to proceed.
Range ELS and Waivers approved.
Post Flight Review CDRLs (CDRL A017) will be delivered by the LSC with any lessons learned documented.
The Post Flight Review is accepted via COR letter.
ACRONYMS/ABBREVIATIONS
Acronym/Abbreviation Description
AFSPC Air Force Space Command
AFSPC/CC AFSPC Commander
AFSPCI AFSPC Instruction
AoA Analysis of Alternatives
ATR Acceptance Test Report
C Compliant
CATEX Categorical Exclusion
CCAFS Cape Canaveral Air Force Station
CCAM Collision Contamination Avoidance Maneuver
CCB Configuration Control Board
CDRL Contract Data Requirements List
CIL Critical Item List
CLA Coupled Loads Analysis
CM Configuration Management
CONOPS Concept of Operations
COR Contracting Officer’s Representative
CPD Capability Production Document
CRR Certification Readiness Review
CVD Compliance Verification Document
DAS Daily Activity Schedule
DoD Department of Defense
DoLWG Day of Launch Working Group
DOORS Dynamic Object Oriented Requirements System
DRIP Design Review Information Package
EA Environmental Assessment
EICD Electrical ICD
EIS Environmental Impact Statement
ELS Equivalent Level of Safety
EMC Electromagnetic Compatibility
EMI Electromagnetic Interference
EOLP End Of Life Plan
ESOH Engineering, Safety and Occupational Health
FAA Federal Aviation Administration
FCA Functional Configuration Audit
FFRDC Federally Funded Research and Development Centers
FMEA Failure Modes and Effects Analysis
FMECA Failure Modes Effects and Criticality Analysis
FRD Facility Requirements Document
FRR Flight Readiness Review
FTA Fault Tree Analysis
FTS Flight Termination System
GFE Government Furnished Equipment
GFP Government Furnished Property
GIDEP Government/Industry Data Exchange Program
GNC Guidance Navigation & Control
GOP Ground Operations Plan
HAR Hardware Anomaly Report
HTS Hazard Tracking System
ICD Interface Control Document
ILC Initial Launch Capability
IMS Integrated Master Schedule
IPP Integrated Planning Process
IPT Integrated Product Team
IRRT Independent Readiness Review Team
ISSE Information System Security Engineer
IV&V Independent Verification and Validation
KPP Key Performance Parameters
LEX Small Launch and Targets Division
LLDB Lessons Learned Database
LRR Launch Readiness Review
LSC Launch Services Contractor
LSIC Launch Service Integration Contractor
LSSA Launch Site Safety Agreement
LV Launch Vehicle
LVSM Launch Vehicle Single Manager
MA Mission Assurance
MAA Mission Area Assessment
MAC Mission Assurance Contractor
MARS Mid Atlantic Regional Spaceport
MD Mission Director
MDR Mission Design Review
MHE Material Handling Equipment
MICD Mechanical ICD
MID Mission Information Document
MNA Mission Needs Assessment
MNS Missions Needs Statement
MRD Mission Requirements Document
MRR Mission Readiness Review
MSPSP Missile System Prelaunch Safety Package
MTO Mass To Orbit
NASA National Aeronautics and Space Administration
NEPA National Environmental Policy Act
NOAA National Oceanic and Atmospheric Administration
ORD Operational Requirements Document
PC Planned Compliance
PCA Physical Configuration Audit
PESHE Programmatic Environmental Safety and Occupational Health
Evaluation
PFR Post Flight Review
PR Pedigree Review
PRD Program Requirements Document
PSC-A Pacific Spaceport Complex - Alaska
PSR Pre Ship Review
PWS Performance Work Statement
QTR Qualification Test Review or Reports
RCC Range Commander’s Council
RDT&E Research Development Test & Evaluation
RFD Request For Deviation
RFW Request For Waiver
RSLP Rocket System Launch Program
RVTM Requirements Verification and Traceability Matrix
RWG Range Working Group
SDAR Space Debris Assessment Report
SDD Software Design Document
SDP Software Development Plan
SE Systems Engineering
SEFT Systems Engineering Functional Team
SEMP Systems Engineering Management Plan
SEP Systems Engineering Plan
SFWC Space Flight Worthiness Criteria
SHAR System Hazards Assessment Report
SIL Software Integration Laboratory
SLIS Small Launch Interface Specification
SLPRD Small Launch Performance Requirements Document
SOW Statement of Work
SMC Space and Missile Systems Center
SMC/CC SMC Commander
SMCI SMC Instruction
SRCR Service Requirements and Concept Review
SRR Service Requirements Review
SSPP Systems Safety Program Plan
STD Software Test Description
SV Space Vehicle
SWCM Software Configuration Management
TAR Test Anomaly Report
TE Transporter Erector
TEPP Test and Evaluation Program Plan
TIM Technical Interchange Meeting
TP Test Procedures
TRR Test Readiness Review
USAF United States Air Force
VAFB Vandenberg Air Force Base
VV&A Validation, Verification and Accreditation
WFF Wallops Flight Facility