OSP-4_Starts_Here.pdf

PDF 503 KB Posted

Attached to
Orbital Services Program-4 (OSP-4) draft Request for Proposal (RFP)
Solicitation number
FA8818-19-R-0001
Issued by

About this file

The draft request for proposal and related documents outline requirements for the Orbital Services Program-4 (OSP-4) multiple award contract. The Air Force seeks launch services of up to 8,000 pounds to geostationary transfer orbit through task orders awarded under the nine-year IDIQ contract. A minimum award of a launch service user guide study will be provided to all qualifying offerors. The draft RFP includes sections on capability, past performance, and price evaluation. A capability questionnaire, mission analysis studies, hardware services, and GFP closeout are covered under contract line items. The Space and Missile Systems Center intends to award the first OSP-4 task order for the Space Test Program Small Spacelift #28 mission. Industry feedback is requested on the draft RFP and a potential separate CLIN for mission assurance by June 13, 2019.

View the file

Other files

File Type Posted
Consolidated_STP-S28_CRM_Response.pdf PDF
Consolidated_OSP-4_DRFP_CRM.pdf PDF
STP-S28_MRD.pdf PDF
STP-S28_DRFP_CRM.xlsx XLSX spreadsheet
STP_S-28_FOPR.pdf PDF
OSP-4_draft_RFP_CRM.xlsx XLSX spreadsheet
Attachment_4_-_Evaluation_Criteria.pdf PDF
Exhibit_B.pdf PDF
Attachment_2_-_DD254.pdf PDF
Exhibit_C.pdf PDF
Attachment_5_-_Ordering_Guide.pdf PDF
Exhibit_A.pdf PDF
Initial_Minimum_Award_Task_Order.pdf PDF
Attachment_1_-_Performance_Work_Statement_(PWS).pdf PDF
Exhibit_D.pdf PDF
Attachment_3_-_Instructions_to_Offerors.pdf PDF
FA8818-19-R-0001_Model_Contract_No_Attachments.pdf PDF
Exhibit_E.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Space & Missile Systems Center

Orbital Services Program-4 (OSP-4)

Draft Request For Proposal (DRFP) Walkthrough

As of: 21 May 2019

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

• Program Summary

• RFP Documentation

– Program Summary

– CLIN Structure

– Performance Work Statement

– Basic Contract – Section L&M

– Capability Questionnaire

– Task Order – Fair Opportunity Proposal Request

(FOPR)

• Notional MRD-to-Launch Timeline

• Frequently Asked Questions

Overview

Building the Future of Military Space

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

Program Summary

• Orbital/Suborbital Program-3 (OSP-3) vs Orbital Services Program-4 (OSP-4)

• OSP-4

– Provides small launch services to USG agencies

– Nine-year ordering period with each mission being a separate FFP Task Order

– Program will support approx. 20 missions

– Low barrier to entry to establish vendor pool of both small and large business

• Qualifying Offerors will receive the Launch Service User Guide (LSUG) Task Order as the minimum award

• Flexible on-ramp process to add emerging providers as their capabilities mature

• Task Order competition will use more restrictive evaluation factors

– Utilize FAR Part 16.5 – Indefinite Delivery Contracts to streamline contract execution

• Provides Contract Officer (CO) with broad discretion and flexibility

• Relief from Mandatory Source Selection Procedures, EZ Source Tool, and other contractual requirements

Building the Future of Military Space

PROGRAM COMPARISON

Program Requirements Contract Approach

OSP-3

Lane 1: 400 – 4,000 lb to Low Earth Orbit (LEO) Lane 2: 4,000 – 20,000+ lb to LEO Special Studies

Multiple Award Contract (MAC) Indefinite Delivery/Indefinite Quantity (IDIQ)

OSP-4 400 lb to LEO – approx. 8,000 lb to Geostationary Transfer Orbit (GTO) Special Studies

MAC – IDIQ / FAR Part 12 – Acquisition of Commercial Items

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

CLIN Structure

Building the Future of Military Space

CLIN Title Description Type

0001 Design, Integration, Mission Assurance, and Launch Services (DIMALS)

The Contractor shall provide complete launch services where the culmination of work results in meeting mission requirements

FFP

0003 Mission Analysis Study (MAS) Provides supplemental analysis required during mission execution FFP

0005 Concept Analysis Study (CAS) Explores the feasibility of a new concept, design, or technical capability FFP

0007 Government Furnished Property (GFP) Closeout Services

Returns all GFP items utilized during mission execution back to the Government FFP

0009 Hardware Services Acquires mission specific hardware to support mission requirements FFP

0002, 0004, 0006, 0008, Data (CDRLs) Contract deliverables

Not Separately

Priced

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

• Requirements derived from the Spacelift CPD and satisfies AFSPC’s definition of “small launch”

– LSC shall provide complete launch services within 12-24 months from Task Order Award

– Dedicated and primary launch solutions are acceptable

– Flexible mission assurance based on mission risk/complexity and/or customer’s preference

– Supports mission-specific and general analysis studies

– Implements Small Launch Interface Specification (SLIS) and Small Launch Performance

Requirements Document (SLPRD)

Performance Work Statement (PWS)

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

• Section L – Does the Offeror have the capability to launch in a year?

• Section M – Evaluate four-question questionnaire on Acceptable/Unacceptable

• No Cost/Price Evaluation = Deviation Evaluation Factors for Certain Multiple

Award Task or Delivery Order contracts approved 13 Dec 17

Basic Contract – Sections L&M

Volume Title Subfactor(s) Hard Copies Electronic Copies Page Limit I Executive Summary 1 1 2

II Technical (Factor 1)

Subfactor 1:

Capability Questionnaire

1 1

5 [1 page for the Capability

Questionnaire and 1 page evidence narrative per question (4 questions)]

III Contract Documentation 1 1 Unlimited

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

Capability Questionnaire

Building the Future of Military Space

Answer a or b is acceptable

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

• Best value evaluation

• Tailorable criteria based on mission requirements

• Technical (Factor 1)

– Subfactor 1 – Capability Gate (Go/No-Go Decision) = Acceptable/Unacceptable

– Subfactor 2 – Mission Accomplishment = Technical Rating (3-colored assessment)

– Subfactor 3 – Small Business Participation Commitment Document = Acceptable/Unacceptable

• Past Performance (Factor 2)

– Confidence rating on OSP-4 Task

Orders only

• Price (Factor 3)

– TEP evaluation

– Price reasonableness

Task Order – Fair Opportunity Proposal Request (FOPR)

Building the Future of Military Space

Volume Title Subfactor(s) Elements Page Limit

I Executive Summary 2

II

Technical (Factor 1)

Subfactor 1: Capability Gate

Element 1: Launch Solution Maturity

Up to 1 page per Spacelift System

(SS) type

Element 2: Mass-to-Orbit Up to 3 pages per launch

Subfactor 2: Mission Accomplishment

Element 1: Mission Tasks Unlimited

Element 2: Design Interface

Up to 2 pages per Space Vehicle (SV)

Element 3:

Launch Authority

Element 4:

Mission Assurance

Process

Element 5:

Payload Manifest

Element 6: Concept Analysis Studies

Subfactor 3: Small Business Participation Commitment Document (SBPCD)

III

Past Performance

(Factor 2)

IV Price (Factor 3) Unlimited

V Contract

Documentation Unlimited

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

Notional MRD-to-Launch Timeline

S P A C E A N D M I S S I L E S Y S T E M S C E N T E RS P A C E A N D M I S S I L E S Y S T E M S C E N T E R

• Q1. What is distinctive about the Orbital Services Program-4 (OSP-4) contract?

– A1. The Orbital Services Program-4 (OSP-4) contract is a multiple award contract Indefinite Delivery/Indefinite Quantity (MAC IDIQ), which allows pre-selected commercial providers to compete for subsequent orbital mission task orders. The IDIQ contract provides a streamlined approach for acquiring launch within 12 -24 months of contract award.

• Q2: What is the difference between Rocket System Launch Program (RSLP) and National Security Space Launch (NSSL)?

– A2: RSLP and NSSL, formerly known as Evolved Expendable Launch Vehicle (EELV), are the two programs under the SMC Launch

Enterprise. RSLP complements NSSL by delivering small launch and targets for a broad range of missions and customers. RSLP launches do not require the NSSL certification process.

• Q3: What is the role of Aerospace Corporation?

– A3: Aerospace Corporation is a Federally Funded Research and Development Center (FFRDC) support SMC with Subject Matter

Experts (SME) and interfaces between the SV and LV communities. In addition, due to their extensive knowledge, Aerospace can participate in the source selection process as advisors.

• Q4: Is OSP-4 a commercial acquisition and how was this analysis done?

– A4: Yes, OSP-4 will be a commercial acquisition under FAR Part 12. However, independent Government Mission Assurance is not a commercial item, so some contract clauses will be tailored similar to the EELV Phase 1A contract.

• Q5: Do you think some missions may not require prior flight experience?

– A5: Yes, some missions may not require prior flight experience, but may also have higher MA levels to offset risk. This information, flight experience and MA level, will be identified in the FOPR and MRD.

• Q6: Does the Government review a contractor’s stability, financial viability, and risk tolerance?

– A6: Yes, the risk assessments will be conducted and will be reviewed by factors in accordance with FAR Part 9.

• Q7: OSP-4 GFP, do we need pre-approvals for each missions?

– A7: Yes, in order to propose use of GFP other than GFP identified in the solicitation as available for use, pre-approval letter from the cognizant PCO or Program Office is needed.

• Q8: Will any of the missions be a small business set-aside?

– A8: Market Research does not support a small business set-aside at this time. As of today, there are not two or more small business capable of meeting anticipated OSP-4 mission requirements. The Government will reevaluate this periodically.

• Q9: Will each mission have a different small business subcontracting goal?

– A9: No, 5% or better of the total contract value must be allocated to small business for each task order. Small business primes can take credit for their performance.

Frequently Asked Questions (FAQ)

Orbital Services Program-4 (OSP-4)
Overview
Program Summary
CLIN Structure
Performance Work Statement (PWS)
Basic Contract – Sections L&M
Capability Questionnaire
Task Order – Fair Opportunity Proposal Request (FOPR)
Notional MRD-to-Launch Timeline
Frequently Asked Questions (FAQ)

File details come from the government source that posted it. Updated .