Exhibit_A_CDRLs_-_CLIN_0001.pdf

PDF 542 KB Posted

Attached to
Orbital Services Program-4 (OSP-4) Request for Proposal (RFP) Federal contract opportunity
Solicitation number
FA8818-19-R-0001
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

This is a request for proposal from the Air Force Space Command Space and Missile Systems Center for the Orbital Services Program-4 multiple award indefinite delivery/indefinite quantity contract. The RFP seeks launch services for small satellites, with the first task order being for Space Test Program Small Spacelift mission 28. The North American Industry Classification System code is 481212, with a small business size standard of 1500 employees. This is not a small business set-aside but responses from small businesses are encouraged. An OSP bidder's library with relevant reference documents is available by request. The final proposal request for STP-S28 will be issued within 15 days directly to offerors submitting OSP-4 proposals.

Exhibit A CDRL

View the file

Other files for this federal contract opportunity

Other files attached to Orbital Services Program-4 (OSP-4) Request for Proposal (RFP), newest first.
File Type Posted
OSP-4_Amendment_1.pdf PDF
Exhibit_E_CDRL_-_CLIN_0009.pdf PDF
Exhibit_F_CDRLs_-_CLIN_0011.pdf PDF
Minimum_Award_-_LSUG_Task_Order_0001.pdf PDF
Exhibit_B_CDRLs_-_CLIN_0003.pdf PDF
Attachment_4_-_Evaluation_Criteria.pdf PDF
Attachment_1_-_Performance_Work_Statement_(PWS).pdf PDF
Exhibit_D_CDRLs_-_CLIN_0007.pdf PDF
Exhibit_C_CDRLs_-_CLIN_0005.pdf PDF
Attachment_2_-_DD254.pdf PDF
OSP-4_RFP_Table_of_Contents.pdf PDF
Attachment_5_-_Ordering_Guide_with_Appendices.pdf PDF
OSP-4_Model_Contract.pdf PDF
Attachment_3_-_Instructions_to_Offerors.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORBITAL SERVICES PROGRAM (OSP-4)

Exhibit A

Contract Data Requirements List (CDRL) (CLIN 0001)

CDRL TITLE DID

A001 REPORT, RECORD OF MEETING/MINUTES DI-ADMN-81505

A002 DESIGN REVIEW INFORMATION PACKAGE (DRIP) DI-SESS-81757A

A003 RANGE SAFETY DATA FOR AERODYNAMIC WEAPONS DI-SAFT-80181

A004 TECHNICAL REPORT-STUDY/SERVICES DI-MISC-80508B

A005 TECHNICAL REPORT – STUDY/SERVICES DI-MISC-80508B

A006 RESERVED

A007 RESERVED

A008 COMPUTER SOFTWARE PRODUCT END ITEMS DI-AVCS-80700A

A009 RESERVED

A010 RESERVED

A011 TEST PROCEDURE (TP) DI-NDTI-80603A

A012 TEST/INSPECTION REPORT DI-NDTI-80809B

A013 FAILURE SUMMARY AND ANALYSIS REPORT DI-SESS-80255A

A014 TECHNICAL REPORT – STUDY/SERVICES DI-MISC-80508B

A015 PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS DI-SESS-81000F

A016 SYSTEM/SUBSYSTEM SPECIFICATION (SSS) DI-IPSC-81431A

A017 TECHNICAL REPORT-STUDY/SERVICES DI-MISC-80508B

A018 INTERFACE CONTROL DOCUMENT (ICD) DI-SESS-81248B

A019 RESERVED

A020 SYSTEM SAFETY PROGRAM PLAN (SSPP) DI-SAFT-81626

A021 SYSTEM/SUBSYSTEM SPECIFICATION (SSS) DI-IPSC-81431A

A022 RESERVED

A023 CYBERSECURITY IMPLEMENTATION PLAN DI-MGMT-82002A

A024 SOFTWARE TEST DESCRIPTION (STD) DI-IPSC-81439A

A025 INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR) DI-MGMT-81861A

A026 RESERVED

A027 TEST PROCEDURES (TP) DI-NDTI-80603A

A028 RELIABILITY AND MAINTAINABILITY PREDICTIONS REPORT DI-SESS-81497A

A029 FAILURE MODES, EFFECTS, AND CRITICALITY ANALYSIS DI-SESS-81495B

A030 CONTRACT FUNDS STATUS REPORT (CFSR) DI-MGMT-81468

A031 MANAGEMENT PLAN DI-MGMT-80004A

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A ADMN

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A001

DI-ADMN-81505 See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

N/A N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 1

Blocks 3, 4, 5.

PWS 2.1.1 - Report, Record of Meeting Minutes PWS 2.1.1.3.2 - Report, Record of Meeting Minutes PWS 2.1.1.3.3 – Report, Record of Meeting Minutes PWS 2.1.4 – Report, Record of Meeting Minutes PWS 2.1.5.3.1 - Report, Record of Meeting Minutes PWS A2 - SRR Exit Criteria #1 PWS A2 - MDR-1 Exit Criteria #1 PWS A2 - TRR Exit Criteria #1 PWS A2 - MDR-2 Exit Criteria #1 PWS A2 - QTR Exit Criteria #1, #2 PWS A2 - PR Exit Criteria #1, #2 PWS A2 - PSR Exit Criteria #1

Contractor format is acceptable.

Blocks 10, 12 & 13.

Provide hard copies of meeting presentation materials at meetings. Provide meeting minutes and Action Items not later than 7 days after the meeting.

Block 14.

Electronic submittal is required for meeting presentation materials, meeting minutes and Action Items.

** For SMC/ADK: Letter of transmittal only.

0 0 1

REPORT, RECORD OF MEETING.MINUTES See Block 16

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Range

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A002

DI-SESS-81757A See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

See Block 16 N/A See Block 16

SMC/ADK

SMC/LEXO

See TO Distribution Annex

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 2

Blocks 3, 4, 5.

PWS 2.1(1) – Entry Criteria PWS 2.1.1.1 - Requirements Analysis and SRR PWS 2.1.1.3.2 - MDR-1 Presentation Package PWS 2.1.1.3.3 - MDR-2 Presentation Package PWS 2.1.1.5 - PSR Presentation Package PWS 2.1.1.5.1 - Range Safety Readiness PWS A2 - SRR Entrance Criteria #6 PWS A2 - SRR Exit Criteria #2 PWS A2 - MDR-1 Entrance Criteria #13 PWS A2 - MDR-1 Exit Criteria #2 PWS A2 - MDR-2 Entrance Criteria #18 PWS A2 - MDR-2 Exit Criteria #2 PWS A2 - PSR Entrance Criteria #15 PWS A2 - PSR Exit Criteria #2

Replace Section 2.0 as follows:

The DRIP shall provide an overview of the launch service design, development, and integration/test status and issues, with focused coverage of the entry and exit criteria for these reviews as outlined in Annex 2 of the OSP-4 Performance Work Statement (PWS).

Delete Section 2.1 through 2.10 and replace as follows

2.1 Service Requirements Review (SRR)

2.2 Mission Design Review 1 (MDR-1)

2.3 Mission Design Review 2 (MDR-2)

2.4 Test Readiness Review (TRR) – for MA Category 2 missions only.

2.5 Qualification Test Review (QTR) – for MA Category 2 missions only.

2.6 Pedigree Review (PR)

2.7 Pre-Ship Review (PSR)

Block 8 Mission Assurance Category 1: No approval required.

Mission Assurance Category 2: Approval. The Government approval authority is the COR.

Blocks 10, 12 & 13.

Entry Criteria:

Submit 15 calendar days prior to SRR and 45 days prior to the applicable review. The Government will determine acceptability not less than 7 days prior to the review for SRR and 21 days for other applicable reviews.

2 0 2

DESIGN REVIEW INFORMATION PACKAGE (DRIP) See Block 16

Reset DD FORM 1423-1, FEB 2001 Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

Exit Criteria:

Submit draft 21 calendar days prior to the applicable review. The Government will determine acceptability not less than 2 days prior to the review. Submit final at review.

Government approval of final submittal is contingent on closure of any liens identified at the review.

Block 14.

Entry Criteria: Provide 1 electronic copy. Provide 1 hardcopy at the exit review.

Exit Criteria: Provide 1 electronic draft. Provide 10 hardcopies at the exit review.

PDF power point charts are preferred for electronic copies.

** For SMC/ADK: Letter of transmittal only.

2 2

0001 A

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Range

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A003

DI-SAFT-80181 See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

See Block 16 N/A See Block 16

SMC/ADK

SMC/LEXO

See TO Distribution Annex

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 2

Blocks 3, 4, 5.

PWS 2.1.2.1 - Launch Site and Services PWS 2.1.2.2 – Range Requirements Coordination and Documentation PWS 2.1.2.3 – Range Safety Tailoring Report PWS 2.1.2.4 – Ground and Flight Safety Hazard Analysis PWS 2.1.2.5 - Facilities and Services PWS 2.1.2.6 – Range Waiver Request PWS A2 - MDR-1 Entrance Criteria #10 PWS A2 - TRR Entrance Criteria #14 PWS A2 - MDR-2 Entrance Criteria #12 PWS A2 - PSR Entrance Criteria #8

Contractor format is acceptable.

Add 10.2.1.1: All Range related safety systems qualification, and acceptance integration test reports are required 15 days after test.

Add 10.2.1.2: Range Safety Documentation shall be IAW AFSPCMAN 91-710. (unless otherwise specified by cognizant range) and takes precedence over DI-SAFT-80181.

Add 10.2.1.3: A Missile System Prelaunch Safety Package (including Safety Assessment Report, Accident Risk Assessment Report, Launch Complex Safety Plan, Ground Operation Plan, and Launch Inhibits) shall be required, to include ordnance item descriptions/hazard classification data, GSE, pressure vessels/systems, batteries, and lifting hardware as a minimum.

Add 10.2.1.4: A Universal Documentation System (UDS) Package shall be provided IAW UDS 501-08, including the Program Introduction (PI), Program Requirements Document (PRD) and Operations Requirements (OR), or as specified by cognizant range.

Add 10.2.1.5: The Telemetry Measurement List shall also include non-FTS instrumentation requirements/descriptions, and identify type of Go/No-Go launch criteria. A Telemetry Measurement Plan/Description document shall be required.

Add 10.2.1.6: Telemetry Products: Provide sync patterns, data rates, telemetry format, telemetry design and decommutation details. Provide telemetry parameter list including indent name, description, word location, frame location, number of bits, scale factors, word length, .XML, .CONFIG, and .DEVs files and tools. Provide Range simulation tape of telemetry from a mission simulation test.

(Continued on Page 2)

RANGE SAFETY DATA FOR AERODYNAMIC WEAPONSRANGE/LICENSE RELATED DOCUMENTATION

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

Add 10.2.1.7: For Category 1 MA missions, the LSC shall submit a complete copy of the FAA license package and any other documentation required by the cognizant range. If any documents referenced in paragraphs 10.2.1.1 through 10.2.1.5 are not applicable when operating under an FAA license, the LSC shall provide comparable documentation required by the FAA, as determined by the

COR.

Block 8.

Mission Assurance Category 1: No approval required.

Mission Assurance Category 2: Approval. The Government approval authority is the COR.

Blocks 10, 12 & 13.

The government requires 60 days for approval and/or comment.

Schedule of submittals to be negotiated between LVC and cognizant range.

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

JSpOC for COLA only

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A004

DI-MISC-80508B See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

See Block 16 N/A See Block 16

SMC/ADK

SMC/LEXO

See TO Distribution Annex

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 2

Blocks 3, 4, 5.

PWS 2.1.1.4.1 -- Space Debris Assessment Report (SDAR) PWS 2.1.1.4.2 – Predicted Launch Environments Analysis Report PWS 2.1.1.4.3 – Coupled Loads Analysis (CLA) Report PWS 2.1.2.13.2 -- Trajectory and Covariance Data Analysis Report PWS 2.1.5.4.3 - Electromagnetic Interference/Electromagnetic Compatibility Assessment PWS 2.1.5.4.5 - Cross-Contamination Analysis PWS A1-1.1 – SV(s) Trajectory and Performance Analysis PWS A1-1.2 – RF Analysis PWS A1-1.3 – Antenna Patterns and Link Analysis PWS A1-2.32 – Vehicle Electrical Design Analysis PWS A1-2.33 – Payload Thermal Analysis PWS A1-2.34 – Stage Pressure Vessels Thermal Analysis PWS A1-2.35 – Linear Stability Analysis PWS A1-2.36 – Launch Vehicle Predicted Environments Derivation PWS A1-2.37 – Link Analysis PWS A1-2.38 – Intermodulation Analysis PWS A1-2.39 – Battery Margin Analysis PWS A1-2.40 – Methodology for Aero-Model Derivation PWS A1-2.41 – Pad Ignition/Liftoff Analysis PWS A1-2.42 – Staging Analysis PWS A1-2.43 – LV/Fairing Venting Analysis PWS A1-2.44 – Engine Combustion Phenomenon Analysis PWS A1-2.45 – LV TPS Design Analysis PWS A1-2.46 – Payload Contamination Analysis PWS A1-2.47 – Collision/Contamination Avoidance Maneuver Analysis PWS A1-2.48 – Launch Availability Analysis PWS A1-2.49 – Structural Analysis PWS A1-2.50 – Coupled Loads Analysis Model PWS A1-2.51 – Flight Computer and Flight Software Interfaces PWS A1-2.52 – Software Development Process Analysis PWS A1-2.53 – Software Load and Initialization PWS A1-2.54 – Space Radiation Analysis PWS A2 - MDR-2 Entrance Criteria #4

Add to paragraph 3(c), to address the following in Section I and Section II;

Provide data in accordance with Annex 1 including:

- Mass Properties (Design)

- Component descriptions and flight history (Design)

- Analyses

- Software

- Program Plans

(Continued on Page 2)

0 0 2

TECHNICAL REPORT-STUDY/SERVICES ANALYSIS REPORTS

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

Contractor format acceptable. Software Analysis shall be required. LSC must provide information related to models, tools, and other data as required for independent verification and validation of analysis.

Block 8.

Mission Assurance Category 1: No approval required.

Mission Assurance Category 2: Government approval required for Program Plans (only). The Government approval authority is the

COR.

Blocks 10, 12 & 13.

Analyses:

Preliminary submittals of all analyses are required as soon as completed, but no later than 45 days prior to MDR-1, unless otherwise approved by the COR. Updated submittals of all analyses no later than 45 days prior to MDR-2, unless otherwise approved by the COR.

Final submittals submitted at MDR-2 + 30 days, unless otherwise approved by the COR. The Government will determine acceptability within 7 days of receipt of the report.

The COR will be notified any time these analysis reports change after final submittal. Updates are required as determined by the COR.

Program Plans:

Draft submittals are required no later than 15 days prior to SRR. The Government shall have 15 days for review and comment.

Revision, including comments, shall be presented at MDR-1. Final submittal is required no later than 45 days prior to MDR-2.

The COR will be notified any time these program plans change after final approval. Updates are required as determined by the COR.

Targeting/Trajectory Reports:

Submit in accordance with Range and payload provider requirements.

For Joint Space Operations Center (JSpOC): COLA data only

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A005

DI-MISC-80508B See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

N/A N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 1

Blocks 3, 4,5.

PWS A1-2.55 – Comprehensive As-Designed/As-Built Analysis PWS A2 - PR Entrance Criteria #25

Add to paragraph 3.(c)(2):Provide the following information:

- The As-Built list of components, part numbers, and serial numbers of the components to be flown on the specific vehicle being reviewed.

- Acceptance Test Data shall be provided for all data components in the As-Built List.

- The launch system component qualification matrix with the test spectra and levels to which each component has been qualified. The matrix shall include thermal cycle, vacuum thermal, random vibration, sine vibration, and shock.

- A complete list of all Discrepancy Reports (DRs), including, but not limited to, System Level and Flight Hardware DRs. The list should include each DR number, description, and disposition.

- A complete list of waivers and deviations, including each waiver number and description.

- All data referenced in PWS Annex 2, Entry and Exit Criteria for Pedigree Review.

Block 10, 12 & 13.

Submittal is required 15 days prior to PR.

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

TECHNICAL REPORT-STUDY/SERVICES See Block 16

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A008

DI-AVCS-80700A See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

N/A N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 1

Blocks 3, 4, 5.

PWS A1-2.12 - Flight computer software architecture PWS A1-2.13 - GSE software architecture PWS A1-2.14 - Software Design Documents Traceability PWS MDR-1 Entrance Criteria #8 PWS TRR Entrance Criteria #4 PWS MDR-2 Entrance Criteria #10

Add Paragraph 10.1.a: Contractor format is acceptable.

Add paragraph 10.1.b: This report consists of all source and executable code, and data files, loaded onto the flight vehicle computer to accomplish pre-launch and flight operations. End Item deliverables include flight and ground software elements.

Add Paragraph 10.1.c: Include software change documentation (including software review board artifacts) concurrently with each source/executable code delivery.

Add paragraph 10.1.d: Include build/load instructions as well as software build/version information for all flight software and supporting programs/tools to compile/load software onto the vehicle.

Add paragraph 10.1.e: Include artifacts extracted from flight computer(s) necessary to perform verification of proper/uncorrupted final software load prior to launch (e.g. version numbers, checksums, etc.)

Blocks 10, 12 & 13.

Submittal not required for Mission Assurance Category 1.

Each submittal shall be configuration controlled. Provide initial submittal at initial code baseline.

Submit update at start of integration and verification testing. Submit final 15 days prior to Pre-Ship Readiness Review.

The COR will be notified any time software versions change. Updates are required as determined by the COR.

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

1 0 1

COMPUTER SOFTWARE PRODUCT END ITEMS See Block 16

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Range

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A011

DI-NDTI-80603A See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

See Block 16 N/A See Block 16

SMC/ADK

SMC/LEXO

See TO Distribution Annex

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 2

Blocks 3, 4, 5.

PWS 2.1.2.11.5 – Launch Notebook PWS 2.1.2.12 – Mission Constraints Document PWS 2.1.2.13.1 – Telemetry Document PWS 2.1.2.13.2 – Instrumentation Document

Add to Requirement 2; Notebook must open to lay flat.

Notebook shall contain the following sections:

Add to 3.1.2 after change pages: Change pages shall include a Handwritten Log Change paragraph 3.2.2 to: Mission ID Add to paragraph 3.2.3. Sections may be modified with concurrence of the COR Change paragraph 3.2.3.1 to: Mission Overview, including Launch Windows for the nominal launch date and fifteen days thereafter.

Change paragraph 3.2.3.2 to: Launch Timeline, including Recycle Timeline (may be an 11x17 foldout) Change paragraph 3.2.3.3 to: Data Sheets Change paragraph 3.2.3.4 to: Launch Checklists.

a. Pre-Range Setup

b. Range Setup

c. Vehicle Test

d. Final Arming Closeout

e. Final Launch

f. Post-Launch Checklist

g. Hold/Recycle Contingency

h. Abort Contingency(ies)

i. Hang Fire Contingency

j. Site Safing (for Launch Abort) Add paragraph 3.2.3.5: Mission Constraints. The mission constraints will be prepared by the contractor with inputs from the SV and approved by the COR. Any changes also require COR approval.

Add paragraph 3.2.3.6: Background Limit Checking Add paragraph 3.2.3.7: Communications/Contacts, including seating charts, console level communications matrix, call sign definitions.

Add paragraph 3.2.3.8: Mission Anomaly Team (MAT) information sheets and references Add to paragraph 3.2.6: The report shall list the countdown procedures identifying the process required to safely launch.

Change paragraph 3.2.7 to Mishap Plans and Response Procedures.

(Continued on Page 2)

TEST PROCEDURES See Block 16

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Block 8.

Mission Assurance Category 1: Launch Notebook submittal required. Mission Constraints Document requires Government approval.

The Government approval authority is the COR.

Mission Assurance Category 2: Launch Notebook (including Mission Constraints Document) requires Government approval. The Government approval authority is the COR.

Blocks 10, 12 & 13.

Initial draft submittal is 7 days prior to the first launch rehearsal. The Government shall have 4 days for review and comment. Revision, including comments, shall be implemented at the launch rehearsal.

Redlines shall be accomplished during each rehearsal. Government approval shall be provided for redlines at end of each rehearsal.

Updated drafts and/or change pages shall be provided prior to each rehearsal event and shall integrate lessons learned from the previous rehearsal.

Final submittal is required 1 day prior to the launch date. The Government will determine acceptability within 8 hours.

After final submission, redlines and/or change pages shall be submitted to the Government field representative (normally the Mission Director or LVSM) for approval.

Block 14.

Electronic submittal of one (1) copy each for LEXO and Range is required for draft and repro.

For Category 1 & 2 mission assurance, approximately 40 hard copies of the notebook (latest revisions incorporated) are required for rehearsals and launch operations.

** For SMC/ADK: Letter of transmittal only.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A012

DI-NDTI-80809B See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

See Block 16 N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 1

Blocks 3, 4, 5.

PWS 2.1.1.4.5 – Design Verification Test Report PWS 2.1.1.4.6 – SS/Payload Electrical Test Report PWS 2.1.1.4.7 - Test Report PWS 2.1.1.5.1 - PSR and Shipping Readiness Report PWS A1-2.21 – Avionics Qualification Matrix PWS A1-2.22 – ACS Qualification Matrix PWS A1-2.23 – Pneumatics Qualification Matrix PWS A1-2.24 – Ordnance Qualification Matrix PWS A1-2.25 – Propulsion Qualification Matrix PWS A1-2.26 – Structural Qualification Matrix PWS A1-2.27 – Avionics System-Level Test Report PWS A1-2.28 – Wind tunnel Post-Test Report PWS A1-2.29 – Subsystem-Level Post-Test Report PWS A1-2.30 – System-Level Test Report PWS A1-2.31 – System-Level EMI/EMC Test Report PWS A2 - TRR Entrance Criteria #7 PWS A2 - QTR Entrance Criteria #3 PWS A2 - PSR Entrance Criteria #6

Contractor format is acceptable.

Block 8.

Mission Assurance Category 1: N/A Mission Assurance Category 2: Approval. The Government approval authority is the COR.

Blocks 10, 12 & 13.

Submittal not required for Mission Assurance Category 1.

Draft Qualification Test Reports are required NLT 30 days after test completion. The Government shall have 8 days for review and comment. Revision, including comments, shall be required 15 days prior to PSR.

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

TEST/INSPECTION REPORT See Block 16

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A013

DI-SESS-80255A See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

A N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 1

Blocks 3, 5.

PWS 2.1.1.4.7 – Qualification Test Anomaly/Failure Report PWS 2.1.2.14.4 -- Launch Failure Analysis and Corrective Action Report PWS A2 - QTR Entrance Criteria #2

Block 8.

The Government approval authority is the COR.

Blocks 10, 12 & 13.

Written notification shall be given by e-mail within 24 hours after incident/anomaly.

Submit formal preliminary report within 3 days after incident/anomaly.

Final report is required 7 days after completion of incident/anomaly review process. The Government will determine acceptability within 8 days of receipt of the report.

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT See Block 16

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A014

DI-MISC-80508B See Block 16 SMC/LEX

LT

C

ASREQ See Block 16

N/A N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 1

Blocks 3, 4, 5.

PWS 2.1.5.4.6 – IPS Contamination Control Plan PWS A1-2.56 – Integration/Test Discrepancy Dispositions PWS A1-2.57 – Material Non-conformance Dispositions PWS A1-2.58 – Waiver Dispositions PWS A1-2.59 – Deviation Dispositions PWS A2 - PR Entrance Criteria #14

Add to paragraph 3.(c)(2) and 3(d): Include affected components, with concerns, dispositions, and mitigation plans identified.

Block 10, 12 &13.

Submittal not required for Mission Assurance Category 1.

Submittal is required 15 days prior to PR.

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

TECHNICAL REPORT–STUDY/SERVICES See Block 16

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A015

DI-SESS-81000F See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

See Block 16 N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 1

Blocks 3, 4, 5.

PWS 2.1.1.1.1 - Requirements Decomposition, Traceability & Validation PWS A1-2.1 – Ordnance Design and Schematics PWS A1-2.2 – Critical connections List PWS A1-2.3 – Vehicle OML Drawing PWS A1-2.4 – TPS drawing PWS A1-2.5 – Description and relationships of coordinate frames PWS A1-2.6 – IMU Interface drawing PWS A1-2.7 – Structural and Assembly drawing PWS A1-2.8 – Electrical Ground System Design drawing PWS A1-2.9 – Wind Tunnel Test subscale model drawing PWS A1-2.10 – Thermocouple locations and installation drawing PWS A1-2.11 – Assembly Drawing of Launch Vehicle PWS A2 - SRR Entrance Criteria #2 PWS A2 - MDR-1 Entrance Criteria #4 PWS A2 - MDR-2 Entrance Criteria #6

Contractor format is acceptable.

Delete paragraphs 4b and 4p.

Block 8.

Mission Assurance Category 1: N/A Mission Assurance Category 2: Approval. The Government approval authority is the COR.

Blocks 10, 12 & 13.

Submittal not required for Mission Assurance Category 1.

Provide a preliminary drawing tree and indentured lists with assembly drawings, ICD drawings, and schematics 45 days prior to MDR-2. The Government will determine acceptability not less than 21 days prior to the review.

Provide final drawing tree and indentured list, assembly drawings, ICD drawings and schematics 45 days after MDR-2.

The COR will be notified any time relevant documents change after MDR-2. Updates are required as determined by the COR.

Block 14.

Electronic submittal is required.

** For SMC/ADK: Letter of transmittal only.

PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS See Block 16

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A016

DI-IPSC-81431A See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

A N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL RIDDLE, IA-04, DAF 29 July 2019

1 1

Block 5.

PWS 2.1.1.1.1 - Requirements Decomposition, Traceability & Validation PWS A1-2.62 - Specification and Requirements Documents PWS A1-2.63 - Documentation/Specification Tree PWS A2 - MDR-1 Entrance Criteria #3 PWS A2 - MDR-2 Entrance Criteria #3 Block 4.

Contractor format acceptable. The contractor shall use the Mission Requirements Document (MRD) structure and matrix in the MRD as a guide for how to organize and trace the system requirements.

Paragraph 2. Referenced documents: The overview shall include a documentation tree diagram showing all relevant specifications, ICDs, and drawings. This documentation tree shall identify how all applicable requirements, specification and interface documents relate to each other.

Section 3.2. While requirements allocation down to the lowest subsystem or component levels is not required within this specification, the LSC shall allocate the requirements down to a sufficient level to separately identify the MRD launch and orbit requirements allocated to the guidance, navigation, and control (GNC) functionality, and to flight software, such that verification methods for GNC functions and for software are identified.

Paragraph 3.3: The external interface section may reference rather than repeat details contained in ICDs (CDRL A004).

Paragraphs 4 and 5: The verification method (called qualification method within the DID) and bidirectional traceability information for each requirement shall be provided in the form of a requirements traceability and verification matrix (RTVM). This matrix shall be subsequently updated with verification status and delivered under CDRL A021, Requirements Traceability and Verification Matrix.

Paragraph 5: Disregard the first sentence in section 5 that states, "For system-level specifications, this paragraph does not apply;" the deliverable shall include full bidirectional traceability to the MRD and other government source requirements documents and standards, such as range requirements and safety standards.

Block 8.

The Government approval authority is the COR.

Blocks 10, 12 & 13.

Draft submittal is required 45 days prior to MDR-1; the Government shall have 21 days for review and comment. Released document, including agreed upon comments, shall be presented at MDR-1.

Draft submittal is required 45 days prior to MDR-2; the Government shall have 21 days for review and comment. Revision, including agreed upon comments, shall be presented at

MDR-2.

Updated draft submittal is required 45 days after MDR-2. The Government will have 21 days for approval.

The COR will be notified any time relevant documents change after MDR-2. Updates are required as determined by the COR. Contractor format is acceptable.

Block 14.

Electronic submittal is required. ** For SMC/ADK: Letter of transmittal only. 1 0 1

SYSTEM/SUBSYSTEM SPECIFICATION (SSS) System Performance Specification

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

See TO Distribution Annex

0001 A X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

A017

DI-MISC-80508B See Block 16 SMC/LEX

LT

C

See Block 16 See Block 16

See Block 16 N/A See Block 16

SMC/ADK

SMC/LEXO

BRIAN RILEY, Capt, USAF 29 July 2019 RANDALL L. RIDDLE, IA-04, DAF 29 July 2019

1 2

Blocks 5.

PWS 2.1.2.7 – New START Treaty Interpretive Data PWS 2.1.2.14.1 – T+4 Quicklook Report PWS 2.1.2.14.1 – L+4 Postflight Report PWS 2.1.2.14.2 – Lessons Learned Report PWS 2.1.2.14.3 – Post-flight Report PWS A1-2.60 – De-commutated Telemetry File

Block 4.

Replace paragraph 3(c)(1) with:

(1) For T+4 hour and Launch + 4 days reports provide the following:

INTRODUCTION

- Purpose

- Scope

- Mission Description

- Applicable Documents

MISSION OVERVIEW

- Mission Summary

- Preliminary Mission Success Criteria

- Flight Overview

- Timeline

- Preliminary Trajectory

- Preliminary Vehicle Performance and Orbital Insertion Accuracy

Replace paragraph 3(c)(2) with:

(2) For Launch + 30 days provide the following:

INTRODUCTION

- Purpose

- Scope

- Mission Description

- Applicable Documents

SUMMARYS AND CONCLUSIONS

- Mission Overview

- Vehicle Configuration

- Propulsion Performance

- Electrical Systems

- Guidance, Navigation, and Control

- Mechanical Systems

- Environments

- Launch Support

- Observations and Anomalies

DETAILED ANALYSIS

Delete last word (above) from paragraph 3(d).

(Continued on Page 2) 0 0 1

TECHNICAL REPORT-STUDY/SERVICES

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

X

ORBITAL SERVICES PROGRAM-4 (OSP-4) TBD TBD

MISSION OVERVIEW

- Mission Summary

- Mission Success Criteria

- Flight Overview

- Timeline

- Trajectory

- Vehicle Performance and Orbital Insertion Accuracy

VEHICLE CONFIGURATION

- Configuration Overview

- Baseline Modifications

- Mission Enhanced Options

PROPULSION PERFORMANCE

- Motor Performance (by stage, if applicable)

- Attitude Control System (ACS)

- Fairing Jettison System

ELECTRICAL SYSTEMS

- Electrical Power Distribution System (EPDS)

- Ordnance Systems

- Guidance,…

This is the start of the file's text. The full file is on GovTribe.