Vendors questions/comments to Draft RFP
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Questions
| Question # | Subject | Solicitation Location | Reference | Questions/Comments | Government Answer |
| 1 | CYOFTS II RELEVANCY ASSESSMENT Past Performance Relevancy Rating Method | 39th Information Operations Squadron Hurlburt Field, Florida 39th Information Operations Squadron, Detachment 1 Joint Base San Antonio, Texas | Section M- Attachment 1 | Recognizing the continuing requirement for cyber operations formal training support and the competition type being 8(a) Set-Aside. The thresholds (>$3.5, >$2, and <$2 million that the CYOFTS II Relevancy Assessment stipulate are restrictive when dealing with 8(a) Set-Aside Primes and place significant favor on the incumbent. Recommendation: Remove $ value thresholds altogether, and if that is not acceptable, would the government consider reducing the thresholds from the existing $ values to >$1.5M, >$1M and <$750K respectively? |
Historical information on annual costs the this effort over the past 10 years has run => $5M per year;
the Governments intent in lowering the thresholds from $5M to $3.5M is to provide for the increased competition without sacrificing quality 2 CYOFTS II RELEVANCY ASSESSMENT Past Performance Relevancy Rating Method 39th Information Operations Squadron Hurlburt Field, Florida 39th Information Operations Squadron, Detachment 1 Joint Base San Antonio, Texas Section M- Attachment 1 Ref. Question 1, Recommendation: If no changes are made to the Past Performance levels, would the government consider modifying the current evaluation criteria priorities to make Technical a graded criteria (rather than a simple pass/fail) to allow for a more competitive grading criteria that does not favor the current incumbent contractor Team? Under this approach, we would recommend that Technical would be rated higher than Past Performance and both Technical and Past Performance are rated significantly higher than Price.
By not scoring the Technical evaluation (keeping it Pass/Fail), the Government feels it is providing equal advantage to all offerors.
By scoring the Technical evaluation, the Government feels the incumbent will hold a distinct advantage over competition.
3 CYOFTS II Appendices Historical Information & Education / Certification Requirements for Labor Categories Section 8.0 Appendices Question: Will Contractors be required to price the Instructor Level 1 labor category? If so, when does the Instructor Level 1 labor category apply. Per Tier 8.1.1, Current CME Level of Support and Required Minimum Level of Support Day 1, Instructors Level I are expected to be Tier II prior to contract start. (If this pre-contract start Certification level remains, the government is strongly favoring the incumbent over other 8a competitors). Current PWS Note:
* Denotes present day Instructor Developers in training. All new in training Instructor Developers are expected to be Tier II prior to contract start. This number will fluctuate depending on the instructor turnover rate.
Proposed PWS Note:
* Denotes present day Instructor Developers in training. The current (incumbent) Instructor Developers progressing in the training program must complete Tier 2 instructor requirements IAW sections 8.1, 8.2, 8.3. All (incumbent) Instructor Developers, currently in trianing, are expected to qualify as Tier 2 Instructor Developers on-schedule.
*** The number of Tier 1 and 2 Instructor Developers fluctuates. All new hires/ are considered Tier 1 instructors until they meet Tier 2/3 requirements. (Returning instructor who meet Tier 2/3 requirements are grandfathered in)
The Governments intent is for the offeror to understand new hires under this PWS are not limited to Tier 2 Instructor Developers; Tier 1 Instructor Developers are acceptable given the Instructor Developer is otherwise qualified AND the Tier 1 Instructor Developers are expected to progress to Tier 2 Instructor Developers within the guidelines provided in sections 8.1, 8.2, and 8.3.
Pricing is left to the offeror IAW with the pricing spreadsheet provided.
4 Contract Small Business Size Standard 39th Information Operations Squadron Hurlburt Field, Florida 39th Information Operations Squadron, Detachment 1 Joint Base San Antonio, Texas Overall Question: With the size and complexity of this effort, has the government thought about making this a Small Business effort and not an 8a set-aside? You are asking for the Prime contractor to have 2 past performance that relates to this work. Other than the incumbent, it will be difficult to find other 8a companies that can meet that threshold. Under a Small Business effort, you will have a more competitive field of companies that can meet the requirements.
The Government conducted Market Research and a two different Request for Information via FBO. The Government is satisfied that the Market is able to provide sufficient 8(a) offerors to make this contract effort fully competitive.
| 5 | NAICS Selection | 39th Information Operations Squadron Hurlburt Field, Florida 39th Information Operations Squadron, Detachment 1 Joint Base San Antonio, Texas | Overall | Comment: Re: NAICS 611420 "Computer Training". Is the government correct with their selected NAICS? Of note, NAICS 611420 has a SB Size Standard of <$11M and this effort has an estimated value of approximately $25M (pg. 67 of Draft RFP). | The SB Size Standard for the NAICS 611420, is <$11M per year of the contract and not the life fo the contract; therefore the Government maintains the NAICS code 611420 is appropriate for this acquisition |
| 6 | CYOFTS Draft RFP | Relevant Contracts | Section 4.2, Page 46 | Question: If an offeror submits 3 PPIs, can all three come from teaming partners, or is there a minimum requirement of PPIs from a Prime? | An offeror can submit up to 5 PPIs, however only 3 of the 5 can come from teaming partners or subcontractors. |
1 Travel Estimates PWS 2.6 Travel Requirements Will we be receiving projected base and/or option year CONUS and OCONUS travel locations with the final solicitation? Travel estimates, based on previous 4 years are approximately 20 trips CONUS per year; travel locations include, but are not limited to: San Antonio TX, Montgomery Al, Bellville IL, Colorado Springs CO, Little Rock AR.
In previous years an OCONUS option did not exist. OCONUS travel is limited and on a case by case basis. Current projections may include Europe and the Pacific.
| 2 | Past Performance Tool Submissions | Draft Solicitation 4.0 | Past Performance Information | Must past performance information submitted through the PPI Tool be done at the same time the hard copy of the past performance volume is submitted? If we take advantage of the Early Submission option for the Past Performance and Contract Documentation Volumes, must the PPI Tool upload also be done at that time? | The PPI tool requirement will be removed in the Request for Proposal |
| 1 | General Question | RFP | General Question | In an effort to foster fair and equitable competition, will the government consider hosting an Industry Day to ensure potential offerors are provided adequate insight to 39th IOS day-to-day operations and the overall architecture used as the framework to conduct the CyOFTS mission? | We are hosting a reading room, but not an industry day. |
The Government feels that the documents provided in the Reading Room Library are sufficient for the qualified offerors to make an informed decision and proposal, and will foster fair and equitable competition.
| 2 | Key Personnel | PWS | Paragraph 2.3.1.4 | Paragraph 2.3.1.4 states, ‘The contractor shall identify one primary on-site Program Manager (PM) and one alternate on-site PM as key personnel.’ Can the alternate on-site PM be located in San Antonio? | The PWS will be modified to show the PM at Hurlburt Field and two alternate PMs, one at Hurlburt Field and one at JBSA. |
| 3 | Key Personnel | PWS | Paragraph 2.3.1.4 | Can the primary on-site PM and alternate on-site PM key personnel be dual-hatted as a subject matter expert supporting a PWS functions/task requirement? Or does the Government require a dedicated primary on-site PM and one alternate on-site PM as key personnel? | Yes, the Primary and Alt Site PMs are expected to be SMES and participate fully in the PWS tasks. |
The Government does not expect a team member to act solely as the site PM or Alt PM
| 4 | Duty Hours | PWS | Paragraph 2.3.1.4 | Paragraph 2.3.1.4 states, “The PM shall provide accountability for all employees to the COR/Government team no later than (NLT) 0900 each duty day. Assume this is 0900CST? For both locations, Hurlburt Field and JBSA? | Yes, accountability is due by 0900 CST for both locations, Hurlburt Field and JBSA. |
| 5 | Prospective Candidates | PWS | Paragraph 2.5.6 | Paragraph 2.5.6 states “6 The contractor shall provide resumes and certifications for all prospective candidates, identifying the position being filled and their ability to perform task in the described performance areas (CDRL A003). All resumes, throughout the life of the contract, will be vetted through the CO and COR.” Does this statement imply first right of resume refusal by the Government? |
Yes, due to mission requirements, the Government maintains the right of refusal if the resume does not present the minimum requirements (education, experience, and security) to qualify for the work as defined in the PWS.
6 IA/RMF PWS Paragraph 3.2.5 Is 39th IOS or another entity responsible for performing vulnerability scans, ATOs, TCNOs, TCTOs, etc, and making this information available to contract Information Assurance (IA)/Cybersecurity/ Risk Management Framework (RMF) personnel for monitoring and other uses? The 39 IOS as well as other entities are responsible for the Cybersecurity (Information Assurance) functions however, vulnerability scans and TCNO's are only done at the unit level on special occasions. Applicable information will be made available as needed to contract personnel as required.
| 7 | Inventory | PWS | Paragraph 3.2.9 | Paragraph 3.2.9: Contractor is responsible for Installation, configuration and sustainment support for how many of each – Video Display, Video Switching, Audio Switching, Video Distribution and Control, Video Teleconference (VTC), Closed Circuit TV (CCTV) , digital video recorder (DVR) server, Video on Demand (VOD), and audio paging systems? | Equipment configuration, types, and quantities will be made available in the reading room. |
| 8 | Surveys | PWS | Paragraph 3.1.2.9 | How many contractor-provided surveys per month or year are required? | Section 3.1.2.9 references surveys, interviews with staff members, student feedback, training needs analysis, customer site visits, and training planning team direction. These are Government initiated, overseen, or led. There is no requirement for a contractor initiated survey. |
The Government requirement is for the professional assessment and analysis of the documents associated with a Training Systems Requirements Analysis (TSRA) initiated by the Government. Contractors may be requested to participate in the TSRA process, but not to unilaterally conduct the TSRA.
Typically, the TSRA documents are updated or evaluated annually for each course of instruction, or as directed by the Major Command.
| 9 | Historical Data | PWS | Paragraph 3.2.8.5 | Can you provide the historical data for open/closed trouble tickets in the ticketing system for each network (NIPR, SIPR, JWICS, TMS, and Learning Management System)? | On average 50 service tickets are performed per week across all networks |
| 10 | Ticketing System | PWS | Paragraph 3.2.8.6 | What is the local approved ticketing system? Is the same ticketing system used for NIPR, SIPR, JWICS, TMS, and Learning Management System? | Excel and Sharepoint are used to manage service tickets |
| 11 | Incumbent Personnel | PWS | Paragraph 2.3.1.1 | Do the current, incumbent personnel possess/meet all these requirements/certifications outlined in Appendix B? | Yes, incumbent personnel possess/meet all these requirements/certifications outlined in Appendix B or are actively engaged in achieving the certification IAW with Appendix B requirements. |
| 12 | ITIL | PWS | Paragraph 3.3.4 | Is ITIL fully deployed in this environment, or will the contractor be required to support ITIL implementation activities? | Information Technology Infrastructure Library |
There is no paragraph 3.3.4. There is no mention of ITIL in the PWS.
13 Clearance PWS Paragraph 7.1.1.3 Paragraph 7.1.1.3 states, ‘On contract start date, a minimum of 95% of contractor personnel working within Hurlburt Field Building 90074 and JBSA Buildings 178/179, 2000, and 2008 shall have a Top Secret (TS)/Special Compartmented Information (SCI) clearance and be ICD 704 eligible with a current SSBI.’ Since contractor personnel are only granted SCI when filling an authorized SCI billet, please confirm that personnel only need to be SCI eligible at proposal submission. Confirmed.
The Government is responsible for SCI. Contract employees need only have the SCI eligibility to qualify.
14 Manpower PWS Paragraph 8.1 Appendix A: Historical Information. Under Information Assurance: Did the Government mean to “zero out” the Information Assurance manpower requirement? Especially in light of the Oct 2016, DFARS Clause 7012 requirements for Safeguarding Covered Defense Information and Cyber Incident Reporting. At this time, yes. This is a capability that the Government may implement at a future date, however, will not be a day-1 requirement.
Request offerors price out this capability per base and option years.
| 15 | Incumbent Personnel | Instructions To Offerors | Instructions To Offerors | To maintain fair competition for non-incumbent offerors, will the government ensure commitment letters for key personnel are not required as part of the solicitation? Should be become a successful opportunity, we would like the opportunity to hire incumbent personnel. | The Government does not require an employee letter of commitment for key personnel. |
| 16 | Evaluation Criteria | FA8773-17-R-8005,_CyOFTS_II | Section M, Paragraph D | In an effort to promote fair past performance evaluation and mitigate agencies’ potential PPQ fatigue, will the government consider evaluating PPI only without requiring PPQ? | No. The Government's approved acquisition plan calls for PPQ as well as PPI. |
| 17 | Evaluation Criteria | FA8773-17-R-8005,_CyOFTS_II | Section M- Attachment 1, CYOFTS II Relevancy Assessment: | To avoid clear favoritism to the current incumbent, will 39th IOS consider modifying the Relevancy Assessment by removing Air Force specific qualifications and CyOFTS specific processes? We recommend 39 IOS equally evaluate PPI relevancy for similar programs supporting other Federal agencies of similar size and scope. |
Our requirement is to teach Air Force Specific Cyber Weapon systems. Should the offeror have other than AF specific qualifications, I think they deserve partial credit, but not full credit.
The processes are Air Force Cyber Weapon Systems ... they are not specific to the contract or incumbent contractor.
The Governments requirement is to teach Air Force Specific Cyber Weapon Systems for Combatant Commands.
The Air Force Cyber Weapon Systems have unique configurations, tactics, techniques, procedures, and processes for US Cyber Command and AFCYBER Operations. These operations are accomplished in, on and through the Cyberspace Domain.
Also, there is no favoritism implied or expected.
There are more than the incumbent contractor with AF Specific Cyber Weapon Systems experience.
| 1 | Recency Criteria | PWS | We encourage the government to consider a slightly broader window of past performance recency (five years ), allowing evaluators to develop a deeper understanding of the depth and breadth of potential offeror’s directly relevant past performance and experience, and enabling a more informed performance risk determination that is in the government’s best interest. | Will change the past performance recency to 5 years |
| 2 | An excellent example of how expanding the recency criteria to five years will give the government a better understanding of an offeror’s full capability is that Tyonek was the prime contractor on this exact contract (Cyber Operations Formal Training Support – Hurlburt Field, Florida, Contract Number: FA4417-08-C-M007) from 9/30/2008 to 03/30/2014. |