A12. Order 0001 Work Description SEMP 20200728.docx

DOCX document 25 KB Posted

Attached to
AGILE CYBER TECHNOLOGY 3
Solicitation number
FA875020R1004
Issued by

View the file

Other files

File Type Posted
ACT_3_List_of_Registered_Parties_25SEP2020.doc DOC document
ACT_3_List_of_Registered_Parties_14SEP2020.doc DOC document
ACT_3_List_of_Registered_Parties_04SEP2020.doc DOC document
ACT_3_List_of_Registered_Parties_28AUG2020.doc DOC document
ACT_3_List_of_Registered_Parties_21AUG2020.doc DOC document
Q and A 13AUG2020.docx DOCX document
ACT_3_List_of_Registered_Parties_13AUG2020.doc DOC document
Q and A 13AUG2020.doc DOC document
A13. Order 0001 Exhibit A SEMP.docx DOCX document
A11. STO - Exhibit B.doc DOC document
A10. STO - Exhibit A.doc DOC document
ACT_3_List_of_Registered_Parties_05AUG2020.doc DOC document
A1. ACT III Anticipated CDRLs (SOS) 08 JUL 2020.docx DOCX document
A2. Agile Cyber Tech 3 Umbrella 20200728.docx DOCX document
DRAFT L and M (1).pdf PDF
ACT_3_List_of_Registered_Parties_24JUL2020.doc DOC document
ACT_3_List_of_Registered_Parties_17JUL2020.doc DOC document
ACT_3_List_of_Registered_Parties_10JUL2020.doc DOC document
ACT_3_List_of_Registered_Parties_201JUL2020.doc DOC document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Order 0001

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NEW YORK

ORDER No. 0001

WORK DESCRIPTION

FOR

SYSTEM ENGINEERING MANAGEMENT PLAN

28 JUL 2020

(Contract Number FA8750-20-R-1004/ Order 0001)

4.0 TECHNICAL REQUIREMENTS.

4.1 The contractor shall accomplish the following:

4.1.1 Develop a System Engineering Management Plan (SEMP) describing the proposed efforts for planning, controlling and conducting activities under Agile Cyber Technology 3. (See CDRL, A001)

4.1.1.1 Provide the following content in the introductory section of the SEMP:

· Cover/title page.

· Document history.

· Table of contents.

· An executive summary of the document’s content.

4.1.1.2 Provide a systems engineering section that conveys a description of the contractor’s system engineering process as it will be applied to system design and test requirements during the Agile Cyber Technology 3 effort.

4.1.1.2.1 Address the following criteria within the systems engineering section defined in 4.1.1.2:

· Organization of the Contractor development team, along with their physical location and facilities needs.

· Technical environments for the Project and how they will be managed. This section will also discuss the interaction with the pre-production and production environments.

· Description of the evaluation and decision-making process to be used by the Contractor when resolving technical questions.

4.1.1.2.2 Define a system engineering methodology within the systems engineering section defined in 4.1.1.2 that addresses the following:

· Configuration Management: Include a description of how Project configuration items (e.g. source code) will be managed.

· Requirements Verification and Validation: Include a description of how the Use Cases will be clarified and expanded, requirements validated, and updated requirements reviewed and approved by the government.

· The Architecture and Design Process including how issues will be discussed and resolved.

· The software development methodology (for iterative builds and incremental releases).

· The hardware development methodology (for iterative builds and incremental releases).

· The build management process used to create and manage builds.

· The testing process to be used by the Contractor.

4.1.1.2.3 Where sections in the SEMP require information to be conveyed that was previously provided as part of the performers overall Agile Cyber Technology 3 proposal, reference the section and page number of the Agile Cyber Technology 3 proposal to keep redundancies between documents to a minimum.