CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXHIBIT
B
C. CATEGORY
TDP TM- OTHER MISC
D. SYSTEM/ITEM
JACCE
E. CONTRACT/PR NO.
FA8750-20-R-1004/0001
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
RESEARCH AND DEVELOPMENT (R&D) PROJECT SUMMARY
3. SUBTITLE
AFRL PROGRAM MANAGEMENT REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81612B/T
5. CONTRACT REFERENCE
PARAGRAPH 4.7.1 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
N/A
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
DISTRIBUTION
b.
COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
REFERENCE BLOCK 4, TAILORING DID DI-MISC-81612B, DELETE THE REQUIREMENTS FOR 1.1.3, 1.2 – 1.2.2.3, 1.2.2.5, 1.2.2.6, 3.1.4, 3.1.6-3.1.6.3 & 3.2.2
CONTRACTOR FORMAT ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MS OFFICE COMPATIBLE FORMAT, RTF OR PDF AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
SUBMIT THE FIRST REPORT FORTY (40) DAYS AFTER CONTRACT AWARD AND MONTHLY THEREAFTER FOR THE PERIOD OF PERFORMANCE.
SUBMIT THE COMPLETE REPORT TO THE COTR.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
SUBMIT EXPORT CONTROLLED DATA AS COORDINATED WITH THE REQUIRING OFFICE.
PROVIDE ADDITIONAL DISTRIBUTION AS COORDINATED WITH THE REQUIRING OFFICE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
DONALD R LUBECKI
H. DATE
28 JUL 2020
I. APPROVED BY
THOMAS J. PARISI
J. DATE
28 JUL 2020
DD Form 1423-1, SEP 97 (EG) (Computer Generated)
PREVIOUS EDITIONS ARE OBSOLETE
Page of Pages
NTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
TDP TM- OTHER MGMT
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
FUNDS AND MAN-HOUR EXPENDITURE REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80331A
5. CONTRACT REFERENCE
PARAGRAPH 4.7.2 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
b.
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, RTF OR PDF.
THE CONTRACTOR SHALL SUBMIT THE FIRST REPORT FORTY (40) DAYS AFTER THE START OF CLIN 0003 AND MONTHLY THEREAFTER.
THIS DATA ITEM RELATES TO B001; DO NOT DUPLICATE REPORTING REQUIREMENTS ESTABLISHED THEREIN.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
SUBMIT EXPORT CONTROLLED DATA AS COORDINATED WITH THE REQUIRING OFFICE.
PROVIDE ADDITIONAL DISTRIBUTION AS COORDINATED WITH THE REQUIRING OFFICE.
COTR
AFRL/RIF
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
TDP TM- OTHER ADMN
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
PRESENTATION MATERIAL
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373
5. CONTRACT REFERENCE
PARA 4.7.3 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
b.
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
THE CONTRACTOR SHALL SUBMIT DRAFT PRESENTATION MATERIAL THREE (3) DAYS PRIOR TO EACH PRESENTATION.
COORDINATE THE NUMBER OF COPIES AND DELIVERY MEDIA REQUIRED FOR EACH PRESENTATION WITH THE REQUIRING OFFICE.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
SUBMIT EXPORT CONTROLLED DATA AS COORDINATED WITH THE REQUIRING OFFICE.
| COTR |
| 1 |
| 1 |
| 1 |
SEE BLOCK 16
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
TECHNICAL INFORMATION REPORT
3. SUBTITLE
INSTALLATION REQUIREMENTS
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80652/T
5. CONTRACT REFERENCE
PARAGRAPH 4.6.1.5 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
b.
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, PDF OR RTF, AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
THE CONTRACTOR SHALL SUBMIT THIS DOCUMENT NOT LATER THAN TEN (10) DAYS AFTER EACH ACTIVITY.
PROVIDE UPDATES AND SUPPLEMENTS TO THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF PERFORMANCE. IDENTIFY CHANGES FROM PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC DOCUMENTATION.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
SUBMIT EXPORT CONTROLLED DATA AS COORDINATED WITH THE REQUIRING OFFICE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
TECHNICAL INFORMATION REPORT
3. SUBTITLE
DEMONSTRATION PLAN
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80652/T
5. CONTRACT REFERENCE
PARAGRAPH 4.5.1 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
b.
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, PDF OR RTF, AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
THE CONTRACTOR SHALL SUBMIT THIS DOCUMENT NOT LATER THAN TEN (10) DAYS AFTER EACH ACTIVITY.
PROVIDE UPDATES AND SUPPLEMENTS TO THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF PERFORMANCE. IDENTIFY CHANGES FROM PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC DOCUMENTATION.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
TDP TM- OTHER IPSC
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B006
2. TITLE OF DATA ITEM
SOFTWARE PRODUCT SPECIFICATION (SPS)
3. SUBTITLE
EXECUTABLE SOFTWARE, SOURCE FILES AND PACKAGING REQUIREMENTS
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A/T
5. CONTRACT REFERENCE
PARAGRAPH 4.6.1.1 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
b.
8. APP CODE
A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 2 AND 4, REFERENCE DD FORM 1664 OR FACSIMILE. TAILORING: ONLY PARAGRAPHS 3.1, 3.2 AND 3.3 APPLY. IN THE EVENT THE SOFTWARE PRODUCED HEREIN IS NOT A COMPUTER SOFTWARE CONFIGURATION ITEM (CSCI), DISREGARD CSCI REQUIREMENTS.
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY, AS COORDINATED WITH THE COTR.
THE CONTRACTOR SHALL SUBMIT EXECUTABLE SOFTWARE, COMMENTED SOURCE CODE FILES AND PACKAGING REQUIREMENTS AT THE COMPLETION OF CLIN 0003. COORDINATE THE DELIVERY MEDIA WITH THE REQUIRING OFFICE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B007
2. TITLE OF DATA ITEM
TECHNICAL INFORMATION REPORT
3. SUBTITLE
INSTALLATION USER AND MAINTENANCE MANUAL
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80652/T
5. CONTRACT REFERENCE
PARA 4.6.1.2 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
b.
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, PDF OR RTF, AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
THE CONTRACTOR SHALL SUBMIT THIS DOCUMENT AT THE COMPLETION OF CLIN 0003.
THE GOVERNMENT WILL RETURN COMMENTS NOT LATER THAN FIFTEEN (15) DAYS AFTER RECEIPT.
SUBMIT UPDATED DOCUMENT NOT LATER THAN FIFTEEN (15) DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
PROVIDE UPDATES AND SUPPLEMENTS TO THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF PERFORMANCE. IDENTIFY CHANGES FROM PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC DOCUMENTATION.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
| COTR |
| 1 |
| 1 |
| 1 |
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
TDP TM- TMSS OTHER
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B008
2. TITLE OF DATA ITEM
COMMERCIAL OFF-THE-SHELF (COTS) MANUAL AND ASSOCIATED SUPPLEMENTAL DATA
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-TMSS-80527B
5. CONTRACT REFERENCE
PARA 4.6.1.5 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
b.
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
N/A a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
UTILIZE MIL-PRF-32216 FOR GUIDANCE AS COORDINATED WITH THE REQUIRING OFFICE.
THE CONTRACTOR SHALL SUBMIT ORIGINAL MEDIA COTS MANUALS AND SUPPLEMENTAL DATA CONCURRENT WITH EACH DELIVERY OF ASSOCIATED SOFTWARE OR HARDWARE AS APPLICABLE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
TDP TM- OTHER ADMN
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B009
2. TITLE OF DATA ITEM
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-80925
5. CONTRACT REFERENCE
PARAGRAPH 4.5.4 AND 4.5.5 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
SEE BLOCK 16
9. DIST STATEMENT REQUIRED
SEE BLK 16
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14.
b.
8. APP CODE
N
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
THE CONTRACTOR SHALL SUBMIT REVISIONS TO THE EXISTING
DOCUMENTATION AS REQUIRED.
THE GOVERNMENT WILL REVIEW AND PROVIDE COMMENTS WITHIN
THIRTY (30) DAYS AFTER RECEIPT OF DRAFT COPIES OF THE
REVISIONS.
FINAL COPIES DUE FIFTEEN (15) DAYS AFTER RECEIPT OF
GOVERNMENT COMMENTS.
THE CONTRACTOR SHALL ALSO PROVIDE UPDATES/SUPPLEMENTS TO
THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF
PERFORMANCE. UPDATES SHALL INCORPORATE CHANGE BARS OR
SOME OTHER APPROPRIATE METHOD TO IDENTIFY CHANGES FROM
PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM
TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC
DOCUMENTATION.
| COTR |
| 1 |
| 1 |
| 1 |
SEE BLOCK 16
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B010
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
FINAL TECHNICAL REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A/T
5. CONTRACT REFERENCE
PARAGRAPH 4.7.4 OF THE WORK DESCRIPTION
6. REQUIRING OFFICE
AFRL/RIGA
7. DD250 REQ
SEE BLOCK 16
9. DIST STATEMENT REQUIRED
SEE BLK 16
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14.
b.
8. APP CODE
N
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a.
ADDRESSEE
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 4:REFERENCE DI-MISC-80711A/T AND
· ANSI/NISO Z39.18-2005 BASED AFRL FORMAT GUIDELINES
· STANDARD FORM 298
· FORMAT GUIDELINES CAN BE FOUND AT (https://www.wpafb.af.mil/afrl/ri/)
NOTE 1: FOR UNCLASSIFIED: MAIL TO AFRL/RIOSI(STINFO), 26 ELECTRONIC PARKWAY, ROME NY 13441-4514 AND AFRL/RIGA(COTR), 525 BROOKS RD, ROME NY 13441-4505
NOTE 2: FOR CLASSIFIED (UP TO AND INCLUDING SECRET): DELIVER APPROPRIATELY MARKED VIA AN APPROVED MAILING SERVICE FOR CLASSIFIED, TO AFRL/RIOSI, 26 ELECTRONIC PARKWAY, ROME NY 13441-4514 AND AFRL/RIGA(COTR), 525 BROOKS RD, ROME NY 13441-4505. ALL OTHER FTR CDRL CONDITIONS APPLY.
NOTE 3: FOR ALL CLASSIFICATION LEVELS (INCLUDING UNCLASSIFIED) WHEN DD 254 BLOCK 10.e.1 or 2 IS MARKED “YES” DELIVER APPROPRIATELY MARKED THROUGH PROPER CHANNELS TO AFRL/RIEE/SSO, 525 BROOKS RD, ROME, NEW YORK 13441-4505 PER INSTRUCTIONS IN THE DD254. ALL OTHER FTR CDRL CONDITIONS APPLY.
SUBMIT A NOTIFICATION OF SSO DELIVERY TO AFRL/RIOSI AND COTR VIA EMAIL .
CONTINUED ON NEXT PAGE
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Page of Pages
CLIN 0004
B
FA8750-20-R-1004/0001
B010 cont’d
BLOCK 16 CONTINUED
BLOCK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS DIRECTED BY THE CONTROLLING DOD OFFICE.
NOTE: THE ABOVE DISTRIBUTION STATEMENT IS PRELIMINARY ONLY. FINAL DISTRIBUTION STATEMENT SHALL BE DETERMINED BY THE GOVERNMENT.
(IF APPLICABLE, INCLUDE) "WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, USC, SEC 2751 ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, USC, APP 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IAW THE PROVISIONS OF DOD DIRECTIVE 5230.25"
BLOCK 11: COMPLETION OF TECHNICAL EFFORT, SEE SECTION F.
BLOCK 12: NOT LATER THAN FIFTEEN (15) CALENDAR DAYS AFTER THE COMPLETION OF THE TECHNICAL EFFORT
BLOCK 13: NOT LATER THAN FIFTEEN (15) CALENDAR DAYS AFTER RECIEPT OF GOVERNMENT COMMENTS
BLOCK 14: DELIVER THE FINAL TECHNICAL REPORT, AS ONE EDITABLE TEXT FORMAT (MS WORD) FILE, WITH THE COMPLETED SF 298 EMBEDDED. FOR UNCLASSIFIED, DELIVER ELECTRONIC VERSION ONLY (CDR/DVD), ALL OTHER DELIVER ONE (1) HARDCOPY AND ONE (1) ELECTRONIC VERSION (CDR/DVD).
THE GOVERNMENT WILL REVIEW, EDIT AND RETURN FOR CORRECTIONS IF REQUIRED NOT LATER THAN THIRTY (30) CALENDAR DAYS AFTER RECEIPT.
UPON RECEIPT OF THE WRITTEN GOVERNMENT COMMENTS, AND IF APPLICABLE, ORCON REQUIREMENTS, THE CONTRACTOR SHALL INCORPORATE ALL REQUIRED CHANGES AND RESUBMIT THE REPORT, SF 298 AND ANNOTATED CHANGE PAGES TO THE CONTROLLING OFFICE, USING THE SAME DELIVERY METHOD AND DESTINATION AS INITIAL SUBMISSION.
REPRODUCTION AND DISTRIBUTION OF THIS DOCUMENT IS THE RESPONSIBILITY OF CONTROLLING DOD OFFICE. SUBMISSION OF THE FINAL UPDATED REPORT SATISFIES THE REQUIREMENT AT DFARS 252.235-7011.
DATA RIGHTS ASSERTIONS:
NOTE: THE CONTRACTOR SHALL NOT DELIVER ANY TECHNICAL DATA WITH RESTRICTIVE MARKINGS UNLESS THE TECHNICAL DATA ARE LISTED ON AN ATTACHMENT TO THIS CONTRACT ENTITLED “IDENTIFICATION AND ASSERTION OF RESTRICTIONS ON THE GOVERNMENT’S USE, RELEASE OR DISCLOSURE OF TECHNICAL DATA OR COMPUTER SOFTWARE.” UNLESS WAIVED BY THE AFRL TECHNICAL DIRECTOR, IF THE FINAL REPORT CONTAINS DATA THAT IS DELIVERED WITH LESS-THAN-UNLIMITED RIGHTS (e.g. LIMITED RIGHTS, GOVERNMENT PURPOSE RIGHTS, SPECIFICALLY NEGOTIATED LICENSE RIGHTS), THE DATA WITH LESS-THAN-UNLIMITED RIGHTS SHALL BE DELIVERED IN AN APPROPRIATELY MARKED (PER DFARS 252.227-7013) APPENDIX TO THE FINAL REPORT. THE FINAL REPORT WITHOUT THE APPENDIX SHALL BE CONSIDERED TO BE DELIVERED WITH UNLIMITED RIGHTS. THE REQUIREMENT FOR A SEPARATE APPENDIX IS MANDATORY AND CAN ONLY BE WAIVED WITH WRITTEN APPROPRIATE AFRL TECHNICAL DIRECTOR APPROVAL.
Page of Pages
File details come from the government source that posted it. Updated .