Attachment_13_-_COST_PROPOSAL_PRICING_TEMPLATE.xlsx
XLSX spreadsheet 159 KB Posted
- Solicitation number
- FA8750-18-R-0002
About this file
This document provides details for a federal contract solicitation seeking research and development services to support a multi-level secure data access solution. The Air Force Research Laboratory, Information Directorate, Rome NY is soliciting proposals for a single-award IDIQ contract to perform specialized software research, development, integration, deployment, testing, installation, maintenance, and lifecycle support for an existing multi-level access solution called SecureView and potential new applications. The work involves enhancing SecureView, researching and developing new multi-level access technologies, and supporting these solutions to meet intelligence community needs. The contract has a 60-month ordering period and an anticipated maximum value of $93.6 million. Offerors must be able to provide approximately 20% of proposed personnel with TS/SCI clearances at time of award and 40% within 90 days of award. Evaluation of responses to a previous RFI determined a small business set-aside was not possible. A draft RFP is expected in the second quarter of 2018.
Attachment 13 - Cost Proposal Pricing Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cross_Reference_Matrix_-_Revision_1.docx | DOCX document | |
| FA8750-18-R-0002_RFP_Amendment_No._1.pdf | ||
| Attachment_7_-_CROSS_REFERENCE_MATRIX.docx | DOCX document | |
| VIPER_RFP_Cover_Letter.pdf | ||
| Attachment_12__PAST_PERFORMANCE_QUESTIONNAIRE.doc | DOC document | |
| Attachment_13_-_COST_PROPOSAL_PRICING_TEMPLATE.xlsx | XLSX spreadsheet | |
| Final_RFP_FA8750-18-R-0002__14_September_2018.pdf | ||
| Attachment_11_-_DRAFT_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_REAL_ORDER_0002_EXHIBIT_A.docx | DOCX document | |
| VIPER_Draft_RFP_Cover_Letter.pdf | ||
| VIPER_Industry_Day_Q&A.PDF | ||
| FA8750-18-R-0002_Draft_RFP.PDF | ||
| VIPER_Industry_Day_Slides_15May2018.pptx | PPTX presentation | |
| List_of_Interested_Parties.xlsx | XLSX spreadsheet | |
| VIPER_Non-Disclosure_Agreement_20180511.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| 1) Fill out the 'Indirect Rates' and 'Direct Labor Rates' tables. That will auto populate the Task Order 0001 & 0002 tables. (Check to ensure that totals carry over/auto populate) |
| 2) In tabs Task Order 0001 and Task Order 0002, input the hours for each labor category, the hours and cost for each subcontractor, and the base for each rate. If the labor category, subcontractor, and/or indirect rate is not being proposed in that year or CLIN, then input 0. |
| 3) For Travel, Materials, Equipment, and/or Other Direct Costs, if proposed, input the data in the appropriate tabs in a format of your choosing (with the exception of travel). |
| 4) Only enter data in the green fields. All other data will auto populate. |
| 5) For travel, please provide details/rates regarding the originating location, per diem , Privately Owned Vehicle (POV), car rentals, and any miscellaneous costs. Once the travel data is inputted, enter a formula to calculate the unburdened trip costs. Then, enter the total estimated unburdened travel cost into any appropriate travel cell within Task Order 0001 and Task Order 0002. |
6) If the proposed rates are weighted averages based on fiscal year rates or multiple labor categories, and if deemed necessary, please indicate so and provide details in the cost narrative.
| 7) CY = Contractor Year |
| 8) For proposal pricing purposes for Task Order 0002, Offerors should use normal escalation rates and realistic indirect rate projections to project cost for four additional years of performance. The additional four year cost projection is for evaluation purposes and will not be negotiated or awarded. |
CLINs Task Order/CLIN SUMMARY
| CLIN | Description | Hours | Cost |
| 0001 | Task Order (TO) 0001 RDT&E | - 0 | $0 |
| 0002 | Task Order (TO) 0001 RDT&E Data | N/A | |
| 0001 | Task Order (TO) 0002 O&M | - 0 | $0 |
| 0002 | Task Order (TO) 0002 O&M Data | N/A | |
| Grand Totals | - 0 | $0 | |
| Summary by Funding | |||
| RDT&E | - 0 | $0 | |
| O&M | - 0 | $0 | |
| Grand Totals | - 0 | $0 | |
| Summary by Labor CLINS | |||
| Total Labor CLINs 0001, 0001 | - 0 | $0 | |
| Total CLINs 0002, 0002 | N/A | ||
| Grand Totals | - 0 | $0 |
| Government labor estimate for TO 0001 per Section L: | 106,200 |
| Government labor estimate for TO 0002 per Section L: | 45,000 |
| Delta: | (106,200) |
| Delta: | (45,000) |
Indirect Rates
| Fringe | Rates | |||||||
| Cost Center | Application Base | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
| Overhead | Rates | |||||||
| Cost Center | Application Base | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
| G&A | Rates | |||||||
| Cost Center | Application Base | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
| Material Handling | Rates | |||||||
| Cost Center | Application Base | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
| Other Indirect Rates | Rates | |||||||
| Cost Center | Application Base | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
| FCCM | Rates | |||||||
| Cost Center | Application Base | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
| Fee | Rates | |||||||
| Cost Center | Application Base | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
Direct Labor Rates
| Contractor Labor Category | AFRL Labor Category | Rates | ||||||
| CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
Task Order 0001
| AFRL Labor Category | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 | Totals | Round Place: | 0 | |||||||||||||||
| Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Cost | |||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| Total Direct Labor | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| Fringe | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fringe | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Overhead | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Overhead | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subcontracts | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | |||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||||||||||||
| Materials and Equipment (M&E) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | M&E | Cost | ||||||||||||||||
| Materials | $ - 0 | ||||||||||||||||||||||||
| Equipment | $ - 0 | ||||||||||||||||||||||||
| Total Materials and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Direct Costs (ODCs) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | ODCs | Cost | ||||||||||||||||
| ODCs | $ - 0 | ||||||||||||||||||||||||
| Total ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Travel | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Travel | Cost | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||||||||||
| Total Travel | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Miscellaneous Costs | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Misc. | Cost | ||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| Total Misc. Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Material Handling (MH) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | MH | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| General & Administrative (G&A) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | G&A | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total General & Administrative | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Indirect Rates (OIR) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | OIR | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Other Indirect Rates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| FCCM | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | FCCM | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total FCCM | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Fee | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fee | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total CLIN 0001 Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 |
Task Order 0002
| AFRL Labor Category | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 | Totals | Round Place: | 0 | |||||||||||||||
| Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Cost | |||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| Total Direct Labor | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| Fringe | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fringe | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Overhead | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Overhead | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subcontracts | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | |||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||||||||||||
| Materials and Equipment (M&E) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | M&E | Cost | ||||||||||||||||
| Materials | $ - 0 | ||||||||||||||||||||||||
| Equipment | $ - 0 | ||||||||||||||||||||||||
| Total Materials and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Direct Costs (ODCs) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | ODCs | Cost | ||||||||||||||||
| ODCs | $ - 0 | ||||||||||||||||||||||||
| Total ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Travel | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Travel | Cost | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||||||||||
| Total Travel | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Miscellaneous Costs | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Misc. | Cost | ||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| Total Misc. Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Material Handling (MH) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | MH | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| General & Administrative (G&A) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | G&A | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total General & Administrative | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Indirect Rates (OIR) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | OIR | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Other Indirect Rates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| FCCM | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | FCCM | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total FCCM | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Fee | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fee | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total CLIN 0001 Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 |
Not Used
| AFRL Labor Category | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 | Totals | Round Place: | 0 | |||||||||||||||
| Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Cost | |||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| 0 | - 0 | $ - 0 | |||||||||||||||||||||||
| Total Direct Labor | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| Fringe | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fringe | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Overhead | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Overhead | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subcontracts | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | |||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| - 0 | $ - 0 | ||||||||||||||||||||||||
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||||||||||||
| Materials and Equipment (M&E) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | M&E | Cost | ||||||||||||||||
| Materials | $ - 0 | ||||||||||||||||||||||||
| Equipment | $ - 0 | ||||||||||||||||||||||||
| Total Materials and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Direct Costs (ODCs) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | ODCs | Cost | ||||||||||||||||
| ODCs | $ - 0 | ||||||||||||||||||||||||
| Total ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Travel | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Travel | Cost | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||||||||||
| Total Travel | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Miscellaneous Costs | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Misc. | Cost | ||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| $ - 0 | |||||||||||||||||||||||||
| Total Misc. Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Material Handling (MH) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | MH | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| General & Administrative (G&A) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | G&A | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total General & Administrative | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Indirect Rates (OIR) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | OIR | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Other Indirect Rates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| FCCM | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | FCCM | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total FCCM | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Fee | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fee | Cost | ||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| 0 | $ - 0 | ||||||||||||||||||||||||
| Total Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total CLIN 0005 Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 |
Grand Total
| AFRL Labor Category | CY2019 | CY2020 | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 | Totals | Round Place: | 0 | |||||||||||||||
| Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Cost | |||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| Total Direct Labor | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| Fringe | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fringe | Cost | ||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Overhead | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Overhead | Cost | ||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subcontracts | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||||
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||||||||||||
| Materials and Equipment (M&E) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | M&E | Cost | ||||||||||||||||
| Materials | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Materials and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Direct Costs (ODCs) | Cost | Cost | Cost | Cost | Cost | Cost | Cost | ODCs | Cost | ||||||||||||||||
| ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Travel | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Travel | Cost | ||||||||||||||||
| Travel | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Travel | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Miscellaneous Costs | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Misc. | Cost | ||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Misc. Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Material Handling (MH) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | MH | Cost | ||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| General & Administrative (G&A) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | G&A | Cost | ||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total General & Administrative | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Other Indirect Rates (OIR) | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | OIR | Cost | ||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Other Indirect Rates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| FCCM | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | FCCM | Cost | ||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total FCCM | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Fee | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Base | Rate | Cost | Fee | Cost | ||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Total Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||
| Grand Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 |
TO 0001 Travel
| No. of Trips | No. of People | No. of Days | Originating Location | Destination | Airfare Rate | Per Diem | POV | Car Rental | Misc.* | Unburdened Trip Totals | |||
| Lodging | M&IE | Mileage | Rate | No. of Cars | Rate | ||||||||
| 10 | 2 | 3 | Washington, DC | ||||||||||
| 5 | 1 | 2 | Washington, DC | ||||||||||
| 10 | 1 | 2 | Fort Meade, MD | ||||||||||
| 5 | 1 | 4 | San Antonio, TX | ||||||||||
| 10 | 1 | 3 | Boston, MA | ||||||||||
| 10 | 1 | 2 | Rome, NY | ||||||||||
| 10 | 2 | 2 | TBD CONUS | ||||||||||
| 5 | 2 | 3 | San Francisco, CA | ||||||||||
| 5 | 2 | 3 | Denver, CO | ||||||||||
| 3 | 2 | 5 | Cambridge, UK | ||||||||||
| 2 | 2 | 5 | Honolulu, HI | ||||||||||
| Total Estimated Travel Costs | $ - 0 | ||||||||||||
| *Misc. costs consist of the following: |
Note: The calculation of M&IE per diem should be in accordance with GSA guidelines, in which the total amount of M&IE is calculated as 75% of the per diem rate for the first and last day of travel with the full amount for all other days.
TO 0002 Travel
| No. of Trips | No. of People | No. of Days | Originating Location | Destination | Airfare Rate | Per Diem | POV | Car Rental | Misc.* | Unburdened Trip Totals | |||
| Lodging | M&IE | Mileage | Rate | No. of Cars | Rate | ||||||||
| 2 | 1 | 4 | Rome, NY | ||||||||||
| 2 | 1 | 4 | Rome, NY | ||||||||||
| 3 | 2 | 3 | Washington, DC | ||||||||||
| 3 | 1 | 2 | Fort Meade, MD | ||||||||||
| 2 | 1 | 4 | San Antonio, TX | ||||||||||
| 2 | 1 | 3 | Boston, MA | ||||||||||
| 2 | 1 | 3 | Rome, NY | ||||||||||
| 2 | 1 | 3 | Col. Springs, CO | ||||||||||
| 2 | 2 | 10 | Hurlburt Field, FL | ||||||||||
| 1 | 2 | 2 | Hurlburt Field, FL | ||||||||||
| 2 | 1 | 5 | Hurlburt Field, FL | ||||||||||
| 2 | 2 | 7 | Washington, DC | ||||||||||
| 1 | 2 | 2 | Washington, DC | ||||||||||
| 2 | 1 | 5 | Washington, DC | ||||||||||
| 2 | 2 | 10 | TBD CONUS | ||||||||||
| 2 | 1 | 5 | TBD CONUS | ||||||||||
| 1 | 2 | 2 | TBD CONUS | ||||||||||
| Total Estimated Travel Costs | $ - 0 | ||||||||||||
| *Misc. costs consist of the following: |
Note: The calculation of M&IE per diem should be in accordance with GSA guidelines, in which the total amount of M&IE is calculated as 75% of the per diem rate for the first and last day of travel with the full amount for all other days.
Materials_Equipment
ODCs
File details come from the government source that posted it. Updated .