This document is a Master Questions & Answers (Q&A) record for RFQ FA873427QR001, a commercial Wi-Fi internet services solicitation issued by the Department of the Air Force AFLCMC/GBKHR at JBSA Randolph Air Force Base, Texas. The Q&A addresses 81 vendor inquiries submitted following a mandatory pre-proposal site visit on November 2, 2026, and provides Government clarifications on network scope, equipment specifications, installation timelines, and technical requirements.

The requirement encompasses two primary objectives: re-establishing commercial Wi-Fi service in previously serviced areas of Building 977 within 10 business days of award, and engineering and installing Wi-Fi coverage extension to first-floor Wings C and D within 30 calendar days of award. The Government has confirmed that 12 existing HPE Aruba AP-303 access points, two Aruba CX 6000 12-port PoE switches, and associated Category copper cabling remain on-site and are Government-owned, available for contractor reuse in core areas. For the expansion, contractors must furnish all new hardware (access points, switches, CAT6/6A plenum-rated cabling) and must achieve a minimum signal strength of -65 dBm across 95% of operational areas with a 25 dB Signal-to-Noise Ratio. The requirement specifies a dedicated 500 Mbps symmetrical fiber circuit (DIA with carrier SLA), approximately 400 concurrent users, 24/7/365 remote monitoring with 95% monthly uptime, 4-hour notification of service degradation during business hours, and 1-business-day on-site response for hardware failures. All new equipment must be TAA-compliant; the existing Aruba infrastructure may be reused but is not mandatory—contractors may deploy any commercial brand (Cisco, Ruckus, etc.) meeting 802.11ac or higher and WPA-2 Enterprise security standards. The Service Contract Act (SCA) applies with Bexar County, Texas Wage Determination WD 2015-5253 (Revision 31); contractors claiming commercial exemption must submit certification. Installation and maintenance work is restricted to Monday–Friday, 0800–1600 hours (excluding federal holidays), with Government-furnished daily escort support. All one-time equipment and installation costs (non-recurring costs) must be segregated in CLIN 0002; monthly recurring costs (ISP circuit, monitoring, help desk, maintenance) are priced in CLINs 0001–4001. The contract runs for a 12-month base year plus four optional 1-year renewal periods. Deliverables include an RF heat map using industry-standard tools (Ekahau or equivalent) in PDF format, as-built telecommunications drawings, and cable pathway plans, all submitted as CDRL 0001. The quotation deadline is November 13, 2026 (originally November 6, extended to allow adequate proposal preparation time), with submission to sarah.dietel@us.af.mil and syedah.gordon@us.af.mil. No set-aside is identified.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AFLCMC/GBKHR — JBSA RANDOLPH AFB, TX

SOLICITATION / RFQ: FA873427QR001

Requirement: Commercial Wi-Fi Internet Services & Facility Extension (Building 977) Document: Master Questions & Answers (Q&A) Record Question 1 Question:

Existing infrastructure: SOW Section 1 and 3.1 require "re-establishing" commercial Wi-Fi in the "previously serviced/currently equipped areas" of Building 977 within 10 business days of award. Are the existing access points, switches, and cabling from the prior service still in place? Are they Government-owned and available for reuse, or must the contractor furnish all new hardware (SOW 3.1, Hardware & Materials)? If equipment remains, please provide the make, model, and quantity of the access points.

Government Response:

Yes, the existing wireless infrastructure is Government-owned and fully available for reuse to meet the aggressive ten business day core restoration timeline.

Remaining Equipment Specifications:

Access Points: 12 HPE Aruba AP-303 wireless access points remain installed on-site.

Network Switches: Two Aruba 6000 12-port PoE switches remain in place.

Cabling: All existing horizontal copper cabling from the switches to these 12 APs remain in place and serviceable.

Contractor Responsibility: The previous carrier removed only their edge demarc router. While the contractor is encouraged to reuse the existing government-owned Aruba hardware for the core areas to reduce mobilization costs, the contractor remains responsible for the engineering, configuration, and maintenance of the complete network. New hardware (switches, APs, and CAT6 cabling) must be furnished and installed by the contractor specifically for the 1st-floor expansion (Wings C & D).

See also SOW Section 3.1 (Hardware & Materials) and Section 3.2 (Existing Areas Activation – 10 business days).

Question 2 Question:

Circuit entry: For the dedicated 500 Mbps symmetrical circuit (SOW 3.1 and 3.5), is there an existing commercial demarcation point, conduit, or entrance facility serving Building 977? Are any base communications squadron approvals, dig permits, or outside-plant work expected to bring a new circuit into the building?

Government Response:

Physical entrance facilities and conduit pathways to Building 977 are already established from prior service operations. However, there is currently no active commercial internet circuit connected to the building.

The main telecommunications demarcation point is located inside the building's central communications room.

Civil Engineering & Base Approvals:

Because the physical conduit pathways are already in place, no outside-plant (OSP) trenching, digging, or dig permits are expected for this requirement.

See also SOW Section 3.1 (Circuit Bandwidth) and Section 3.5.

Question 3 Question:

Capacity and coverage: How many concurrent users/devices should the design support, and which rooms make up the first-floor C and D wing extension (SOW 1 and 3.2)? Are ceiling heights, plenum, and cable pathways available for the extension? The CISP floor plan attachment shows the layout but not these conditions.

Government Response:

System Capacity: The network must be engineered to support the daily operations of all bldg. personnel, mobile devices, mission partners, and authorized visitors across the 41,000 sq ft facility. Bidders must utilize their site survey data and predictive RF engineering tools to size the network capacity (bandwidth and IP pools) to prevent localized congestion.

Expansion Footprint: The first-floor extension specifically covers the office areas and conference spaces within Wings C and D of Building 977 (which were entirely excluded from the previous contract).

Cable Pathways and Plenum: Building 977 features standard commercial drop-ceilings. All new cabling run through these ceiling spaces for the expansion must be Cat 6 or 6A plenum-rated (CMP) copper cabling conforming to ANSI/TIA guidelines. Exact ceiling heights, physical conduit pathways, and rack space must be verified by vendors during the mandatory pre-proposal site visit.

See also SOW Section 1 (Scope), Section 3.1 (Coverage Area), and Section 3.2 (Installation Standards – ANSI/EIA/TIA, UFC, BICSI).

Question 4 Question:

Prior contract: Please identify the previous provider and contract number, and the reason service lapsed, so offerors can plan the 10-business-day restoration.

Government Response:

Due to a misinterpreted air force mandate, the option year was not exercised.

Question 5 Question:

For the existing takeover of the Wireless System, How many network switches are currently installed? Do they need replacing?

Government Response:

There are currently 2 switches installed in Building 977, they do not need to be replaced.

See also SOW Section 3.1 (Hardware & Materials).

Question 6 Question:

There are 8 Access Points displayed in the PowerPoint file. Are they to be re-used or replaced within 10 days? if they are to be re-used, what make/model Government Response:

There are actually 12 existing Access Points currently mounted inside the facility.

To achieve the mandatory 10 business day core service restoration, these existing APs are to be re-used by the contractor. They do not need to be replaced.

The existing, installed hardware consists of HPE Aruba AP-303 wireless access points.

See also SOW Section 3.1 and Section 3.2 (Existing Areas Activation – 10 business days).

Question 7 Question:

The RFP specifies 500Mbps up/500Mbps down Internet. It seems unlikely that such service can be installed within 10 days. Is that a requirement for the Extension phase?

Government Response:

Yes, the dedicated 500 Mbps symmetrical (upload/download) circuit is tied to the final 30 calendar day expansion/extension phase deadline, not the 10 day core restoration.

Phase 1 (10 Business Days): The contractor must re-establish and configure local wireless connectivity (SSID broadcast, local network login, switches, and AP routing) across the existing core areas.

Phase 2 (30 Calendar Days): The permanent, dedicated 500 Mbps symmetrical fiber circuit must be fully installed, active at the demarcation point, and routed to all building APs (including the new C & D wing expansion) by day 30.

See also SOW Section 3.1 (Circuit Bandwidth) and Section 3.2 (Existing Areas Activation / New Extension Activation).

Question 8 Question:

Scope. At the site visit it was indicated that only the expansion areas on the 1st and 2nd floors are to be quoted, for general (commercial) Wi-Fi only. The SOW refers to restoring service in previously serviced areas and to a first-floor extension in Wings C and D. Please confirm which areas CLIN 0002 equipment and installation must cover, and whether the CLIN 0001–4001 monthly service covers the whole building or only the expansion.

Government Response:

CLIN 0002 (One-Time Installation): This CLIN strictly covers the engineering, CAT6 cabling, physical hardware procurement, and installation required to extend Wi-Fi coverage into the newly expanded first-floor Wings C and D.

CLINs 0001–4001 (Monthly Service): The monthly recurring service covers the entire building's Wi-Fi network footprint (including the restored core areas on the second floor and the first-floor B-wing, as well as the new first-floor Wings C and D expansion). The contractor is responsible for managing, monitoring, and maintaining the end-to-end commercial network across the entire facility as a single unified service.

See also SOW Section 1 (Scope of Work) and Section 3.1.

Question 9 Question:

Equipment. The existing Wi-Fi and switching are Aruba. Must the new access points be Aruba, or interoperate with the existing Aruba controller? Or is a separate, contractor-owned commercial network meeting SOW 3.1 (802.11ac or higher, WPA2 or better, isolated from NIPRNet) acceptable?

Government Response:

The Government does not mandate a specific manufacturer. While the existing on-site equipment is Aruba (AP-303 and Aruba 6000 switches), the contractor may deploy any commercial hardware (e.g., Cisco, Aruba, Ruckus) that meets or exceeds the 802.11ac dual-band (2.4/5 GHz) standard and WPA-2 Enterprise security (or better).

The system must operate as a fully managed, turnkey network. The contractor may either logically integrate their new hardware with the existing government-owned Aruba equipment or deploy a physically separate overlay network, provided it is 100% logically and physically isolated from the base NIPRNet and complies with all security guidelines in SOW Section 3.1.

See also SOW Section 3.1 (Specifications table – Wireless Standard, Dual Frequency, Security) and Section 3.2 (Network Isolation).

Question 10 Question:

Rack location. Please confirm acceptable locations for the contractor's wall-mounted enclosed rack (for example, an electrical closet in the expansion area), and whether a dedicated 120 V circuit is available there or must be provided by the contractor.

Government Response:

Rack Location: Enclosed, wall-mounted racks are authorized to be installed in the designated telecommunications closet the 1st-floor expansion wings. The exact mounting locations must be finalized with base Civil Engineering during the initial post-award walkthrough.

Electrical Power: Standard 120V commercial power outlets are available in the telecommunications closets. If a dedicated circuit is required for the contractor's specific UPS or power distribution unit, the contractor must coordinate the physical connection, but no major electrical utility construction should be priced.

See also SOW Section 3.1 (Hardware & Materials).

Question 11 Question:

Interconnection to the Primary MDF. Is a connection from the new rack to the Primary MDF on the 2nd floor of [Wing/Building] D required? If so, what will it connect to (for example, the commercial circuit demarcation or the existing general Wi-Fi switching)? Is the contractor responsible for any configuration of existing Government or incumbent equipment?

Government Response:

Yes. The local distribution switches in the new 1st-floor expansion rack must interconnect back to the Primary MDF (located on the 2nd floor) to route traffic through the main commercial internet gateway and firewall.

Connection Point: This backhaul connection will terminate at the commercial circuit demarcation point/switch stack in the MDF.

Configuration: The contractor is responsible for the logical configuration, VLAN trunking, and IP routing of both the newly installed expansion switches and the existing government-owned switches to ensure seamless building-wide roaming under a single SSID.

See also SOW Section 3.2 (Network Isolation) and Section 3.9 (As-Built Drawings).

Question 12 Question:

Wall penetrations. Sleeves in the expansion section were not confirmed. May the contractor core-drill the concrete walls where needed, and what approvals apply (work order or dig permit, fire-stop inspection, any hazardous-material survey)?

Government Response:

Yes, core-drilling and firewall penetrations are permitted where existing sleeves are unavailable or full.

Required Approvals:

* The contractor must submit a fully detailed Cable Pathway & Installation Plan (CDRL 0001) for JBSA Civil Engineering approval prior to drilling.

* The contractor must utilize standard UL approved fire stopping materials to seal all penetrations.

* A base HAZMAT review will be coordinated by the Government prior to drilling to ensure no asbestos containing materials are disturbed.

See also SOW Section 3.2 (Installation Standards) and CDRL 0001 (As-Built Telecommunications Drawings / Cable Pathway Plan).

Question 13 Question:

Commercial circuit. Where is the building's commercial service entrance or demarcation for the dedicated 500 Mbps circuit? Is there an existing commercial provider or conduit the contractor may use?

Government Response:

The main commercial telecommunications service entrance enters Building 977 at the ground level and terminates in the main telecom room.

ISP Infrastructure: The local carrier with established physical fiber infrastructure to the Building 977 demarc is Charter/Spectrum. Bidders may utilize existing commercial conduits and carrier backhaul agreements (such as partnering with the incumbent carrier) to provision the required dedicated 500 Mbps symmetrical circuit.

See also SOW Section 3.1 (Circuit Bandwidth) and Section 3.5.

Question 14 Question:

Drawings. Are as-built drawings or cable records of the existing installation available to quoters?

Government Response:

Yes. The historical floor plan layout and the legacy coverage heat maps showing previous AP locations are available.

See also SOW Section 3.9 and CDRL 0001 (As-Built Telecommunications Drawings / Coverage Heat Map).

Question 15 Question:

Site visit follow-up. Will the photos and answers promised at the site visit be issued as an RFQ amendment? If they are issued close to the due date, would the Government consider extending the quote due date of 6 November 2026?

Government Response:

Yes, this Q&A document, along with official site photographs and the historical heat maps, is being formally published as an Amendment to the RFQ.

Extension: To allow all small business offerors adequate time to integrate these technical clarifications, historical data, and site walkthrough findings into their pricing packages, the proposal submission deadline has been extended from November 6, 2026, to November 13, 2026, at 1400 CST.

Question 16 Question:

Service activation: Does the 10-day service activation requirement refer to calendar days or business days?

Government Response:

The 10 day service activation requirement for the core/previously configured areas refers to 10 business days (excluding federal holidays and weekends). The 30 day expansion window for Wings C & D refers to 30 calendar days from the date of contract award.

See also SOW Section 3.2 (Existing Areas Activation / New Extension Activation).

Question 17 Question:

Existing infrastructure: In areas previously served by commercial Wi-Fi, which access points, switches, cabling, and pathways remain in place and are available for contractor reuse? Please clarify which components must be newly furnished.

Government Response:

Available for Reuse: 12 installed HPE Aruba AP-303 Access Points, 2 Aruba 6000 12-port PoE switches and all associated Category class horizontal copper cabling run to those 12 AP locations are Government-owned and available for reuse.

Must be Newly Furnished: The contractor must furnish and install all new switches, APs, patch cords, and Category 6 plenum-rated cabling required to support the new first floor expansion into Wings C and D. Bidders must also provide any new edge gateway router, security firewall, and UPS backup systems needed in the main MDF.

See also SOW Section 3.1 (Hardware & Materials).

Question 18 Question:

Circuit handoff: What is the required or preferred handoff location for the dedicated commercial circuit within Building 977?

Government Response:

The required handoff location for the dedicated 500 Mbps symmetrical commercial internet circuit is the telecommunications room located on the second floor of D wing, Building 977. The contractor is responsible for extending the circuit from this demarc point to their local distribution switches.

See also SOW Section 3.1 and Section 3.5.

Question 19 Question:

Post-installation heat map: Are there required formats, survey tools, or acceptance criteria for the post-installation heat map beyond demonstrating coverage?

Government Response:

Yes. The post installation heat map must be engineered using an industry standard professional survey tool (such as Ekahau HeatMapper or equivalent).

Acceptable Metrics: The map must mathematically demonstrate a minimum signal strength of -65 dBm to -67 dBm with a minimum 25 dB Signal-to-Noise Ratio (SNR) across all occupied spaces. The final deliverable must be submitted in PDF format as part of CDRL 0001 for Government acceptance.

See also SOW Section 3.9 (Completion of Work and Deliverables – Coverage Heat Map) and CDRL 0001.

Question 20 Question:

Ongoing service requirements: What response times, monitoring requirements, and reporting obligations apply to the monthly commercial Wi-Fi service during the base period and option years?

Government Response:

Uptime: The contractor must maintain a minimum network uptime of 95% monthly (excluding pre-coordinated, scheduled maintenance windows).

Monitoring: 24/7/365 remote monitoring is required, with a web-based dashboard accessible by Government administrators.

Notification: The contractor must notify the Government within 4 hours of any identified service degradation during duty hours M-F (0800–1600).

On-Site Response: Physical on-site maintenance dispatch is required within 1 business day for any hardware or physical cable failures.

See also SOW Section 3.3 (Maintenance) and Section 3.5 (Commercial Internet Service Standards – 95% uptime).

Question 21 Question:

Access point cabling pathways: Please describe the available cable pathways to each designated access point location, including any existing conduit, cable trays, or other routing provisions. Do these routes have accessible suspended (drop) ceilings to facilitate cable installation? Please identify any portions requiring routing through hard ceilings, walls, or other inaccessible spaces.

Government Response:

Building 977 is primarily equipped with standard, accessible suspended (drop) acoustic ceiling tiles, which will facilitate horizontal cabling runs.

Portions of the building may contain hard-walled drywall corridors or fire barriers. Where hard ceilings or firewalls are encountered, the contractor must route cabling through existing conduits/sleeves or propose new core penetrations as part of their Cable Pathway Plan (CDRL 0001).

See also SOW Section 3.2 (Installation Standards) and CDRL 0001.

Question 22 Question:

Captive portal and authentication: Must the captive portal integrate with a government identity or access-management system, RADIUS server, or other authentication service, or is the requirement simply an informational/terms-of-use page that users accept before gaining internet access? If integration is required, please identify the system and applicable interface requirements.

Government Response:

No. There is no integration required with any official government identity systems (such as CAC card authentication, Active Directory, or RADIUS).

Requirements: The portal must operate as a standalone, vendor-managed captive splash page. It must display a standard DoD Notice and Consent Banner that users must click to accept the terms of service before being granted unclassified commercial internet access.

See also SOW Section 3.5 (Captive Portal / Splash Page) and Attachments 2 & 3.

Question 23 Question:

Content filtering: Is content filtering required for the commercial Wi-Fi service? If so, please identify the required filtering policies or categories and any government-specified filtering solution or standards.

Government Response:

Yes. The contractor must implement standard commercial content and web filtering on the edge firewall. The filtering policy must restrict access to categories that violate military installation regulations, including but not limited to: gambling, adult content, illegal file sharing (P2P), malicious/phishing domains, and known proxy-bypass services.

See also SOW Section 3.4 (User Support – content filtering/security management) and Section 3.5.

Question 24 Question:

Exposed raceway or conduit: Where new cabling is required but no suitable existing pathway is available, will exposed, surface-mounted cable raceway (wire shielding) or conduit be acceptable? If so, please specify any requirements for materials, appearance, mounting, routing, and approval before installation.

Government Response:

Exposed cabling is strictly prohibited. Where cabling cannot be run behind drywall or above suspended ceilings, the contractor may utilize surface-mounted, latching plastic raceway (such as Wiremold or equivalent).

Mounting Standards: The raceway must run flush along baseboards or door frames, match the color of the adjacent wall surface, be mechanically secured (not just adhesive-backed), and receive physical aesthetic approval from the Facility Manager prior to installation.

See also SOW Section 3.2 (Installation Standards) and Section 3.8 (Site Maintenance & Safety).

Question 25 Question:

For this RFI & RFQ SOW requirement, is it the Air Force intention to utilize existing WiFi service that is already physically installed and "re-establish" WiFi service at JBSA Randolph Building 977? Are the Aruba Access Points already installed and configured?

Government Response:

Yes, the Air Force's intention is to utilize the existing, government owned Wi-Fi infrastructure to re-establish service to previously configured areas.

Installation & Configuration Status: The access points and switches are physically installed on-site, but they are not currently configured for active service because the prior service contract has expired, and the previous carrier removed their demarc gateway router.

See also SOW Section 1 (Scope) and Section 3.1 / 3.2.

Question 26 Question:

Are the current Aruba Access Points TAA? Can the Air Force provide the model numbers and part numbers for the Aruba Access Points and the Aruba 6000 Switch?

Government Response:

Access Points (Qty 12): HPE Aruba AP-303 (Part Number: JZ320A or JZ320ACM). These access points are TAA compliant.

Network Switches (Qty 2): Aruba CX 6000 12-Port PoE switches (Part Number: R8N89A). These switches are TAA compliant.

See also SOW Section 3.1 (Hardware & Materials).

Question 27 Question:

Is all new equipment required to be TAA?

Government Response:

Yes. This is a Department of War procurement, all newly furnished equipment (including switches, access points, firewalls, and cabling) supplied by the contractor for the first floor, wings C and D expansion must be 100% TAA-compliant.

See also SOW Section 3.1 (Hardware & Materials).

Question 28 Question:

Can the Air Force provide the location of the Communication Room where the Switches and Internet Service Provider (ISP) demarcation will be located?

Government Response:

There are 2 locations. One is in D wing Room 205 and the other is in the hall way in B wing. Demar comes in to bldg. 379 See also SOW Section 3.1.

Question 29 Question:

Can the Air Force describe the number of power outlets in the Communications Room where the Switches and Internet Service Provider (ISP) access demarcation are located?

Government Response:

Demar location is in bldg 379 and requires coordination to access.

Power Outlets: The room is equipped with standard commercial 120V AC wall outlets connected to base utility power. There is also a dedicated UPS backup rack location. Bidders do not need to budget for any utility-level electrical upgrades; standard power is available and accessible for the contractor’s wall-mounted rack and UPS.

See also SOW Section 3.1 (Hardware & Materials).

Question 30 Question:

Will there be only one demarcation for the Internet Service Provider (ISP)? Where will the demarcation point be located?

Government Response:

Yes, there will be only 1 demarcation point for the commercial Internet Service Provider. This demarcation point is located in bldg 379.

See also SOW Section 3.1 and Section 3.5.

Question 31 Question:

Can the Air Force provide a description of the internal walls, i.e. drywall, cinder block or other?

Government Response:

Core Administrative Areas and Corridors: Primarily constructed of standard drywall (gypsum board) on metal studs.

Structural and Firewall Barriers: Portions of the building, especially dividing wings and utility areas, are constructed of reinforced concrete and cinder block.

Note: Bidders should account for the signal attenuation of cinder block/concrete walls when conducting their predictive RF designs to ensure no "dead zones" are created in the first-floor expansion area.

See also SOW Section 3.2 (Installation Standards).

Question 32 Question:

Where did the 500/500 Mbps requirement come from? Is that what we had before? If not, what did we have before? Is that our true requirement (a must)?

Government Response:

This is exactly the same bandwidth capacity that was utilized under the previous service. The previous incumbent confirmed in their response that they "maintain the serving 500 Mbps dedicated fiber circuit under a carrier agreement."

Yes. It is a strict, non-negotiable requirement ("must"). Symmetrical 500 Mbps bandwidth is essential to support the high-density operations of the AFLCMC/GBH software developers, system engineers, and collaborative partners who must download large commercial patches and interface with external cloud environments separate from the restricted NIPRNet.

See also SOW Section 3.1 (Circuit Bandwidth) and Section 3.5.

Question 33 Question:

Did we have coax or fiber before?

Government Response:

We had fiber before. The incumbent explicitly identifies the previous circuit as a "500 Mbps dedicated fiber circuit."

See also SOW Section 3.1 and Section 3.5.

Question 34 Question:

For the expansion: do we have a preference on where we want the box? Or do we let them propose where to put it? Do they have access to the electrical room to put it in there?

Government Response:

The Government does not mandate a specific location for any new expansion cabinets/boxes. Bidders are expected to propose the optimal physical location for any additional switches or hardware as part of their Predictive RF Design (CDRL 0001).

Yes, the contractor will be granted coordinated access (with escort) to the necessary electrical and telecommunications closets to mount their equipment, run cabling, and connect to power.

See also SOW Section 3.9 / CDRL 0001 and Section 4.2 (Security Requirements).

Question 35 Question:

Multiple of the vendors though there should be another cabinet somewhere, we need to find out if there is another one.

Government Response:

The incumbent verified that the building's wireless network currently utilizes two switches, with one switch deployed in D wing and one in B wing. (Waiting on verification) See also SOW Section 3.1.

Question 36 Question:

How many access points do we have? Do we have documentation with this information? (the other contract requested a heat map of the access points) so, did we get one and do we have that we could send out?

Government Response:

We have 12 APs currently installed in the building. We have the map with the red stars signifying where the Aps are located.

These are HPE Aruba AP-303 units. Under the previous contract, a post-installation heat map was a required deliverable. The Program Office retains this historical coverage heat map and can distribute it to bidders as an attachment to the solicitation to provide them with a clear baseline of the existing wireless layout.

See also SOW Section 3.9 and CDRL 0001 (Coverage Heat Map).

Question 37 Question:

I just want to confirm that the IT racks we saw today are for the commercial wifi only? I just trying to confirm that those racks are not part of the AFNET.

Government Response:

Yes, they are for commercial Wi-Fi only. Those specific racks, switches, and patch panels are part of a completely dedicated, non-tactical commercial internet footprint. They are not connected to, affiliated with, or running any AFNET or secure government NIPR/SIPR traffic. Keeping this physical and logical separation is a strict SOW requirement to prevent security crossovers.

See also SOW Section 3.2 (Network Isolation).

Question 38 Question:

For the second floor, do you have the administrator accounts and credentials for that hardware?

Government Response:

Yes, we have the admin credentials and will provide to whomever is awarded the contract.

Question 39 Question:

Upon award, will we have the support of any facilities resources, like we did today, to be able to provide timely access to closets, crawl spaces, conduits, etc.?

Government Response:

Yes, absolutely. The Government will designate an individual escort for all work performed. This representative will coordinate daily base access, escort your installation crews, and provide immediate access to telecommunications closets, electrical rooms, and drop-ceiling crawl spaces. This hands-on support is guaranteed to help you hit both the 10-day core restoration and the 30-day expansion deadlines.

See also SOW Section 4.2 (Security Requirements) and Section 3.6 (Project Management).

Question 40 Question:

Attachment 1 shows the wings and some WAP symbols but has no scale, dimensions, or AP count. Can you provide dimensioned drawings and the number and locations of the APs installed under the prior service?

Government Response:

The lack of scale and dimensions on the drawing is referenced in SOW Section 2.0 (Appendices), which identifies Appendix 2 simply as "Randolph CISP Bldg 977 1st-2nd Floor Plan." This is all that we have.

SOW Section 1.1.1 (Commercial Internet Bldg 977), Paragraph 1, Bullet 2 states: "The contractor is responsible for hardware and materials which will be reviewed at the required site visit (there is existing equipment available if contractor wishes to use)." This site visit is what establishes the on-site AP count.

See also SOW Section 5 (Appendices – Attachment 1) and Section 3.7 (Site Visit).

Question 41 Question:

What equipment and cabling from the previous commercial Wi-Fi provider is still in place (APs, cable, switches, routers, firewalls, racks)? If any remains, may we reuse it, or must all hardware and cabling be furnished new? Who owns it?

Government Response:

SOW Section 1.1.1 (Commercial Internet Bldg 977), Paragraph 1, Bullet 2 See also SOW Section 3.1 (Hardware & Materials).

Question 42 Question:

What are the ceiling types and heights in each wing and floor (drop tile, hard lid, open/exposed)?

Government Response:

Previously asked and answered also in the SOW section 3.1 See also SOW Section 3.2 (Installation Standards).

Question 43 Question:

What is the wall construction between rooms and wings (metal stud, cinder block, shear walls)? Are wall penetrations and drilling allowed, who approves them, and is firestopping required?

Government Response:

Previously asked and answered and also in the SOW section 1.1.2 See also SOW Section 3.2 and CDRL 0001.

Question 44 Question:

May we run our own cabling through existing Government pathways (conduit, tray, ceiling, chases) as long as it doesn't connect to the Government network, or must we supply separate pathways?

Government Response:

Reference SoW 3.2 and 1.1.2 See also SOW Section 3.2 (Network Isolation / Installation Standards).

Question 45 Question:

Where is dedicated space, power and cooling available in each closet for our own racks and switches, separate from Government equipment?

Government Response:

Previously asked and answered, also SOW Section 1.1.9 and 1.1.2 See also SOW Section 3.1 and Section 3.9.

Question 46 Question:

Where will the 500 Mbps circuit be delivered and terminated? Is the previous carrier's circuit and demarc still live, and who was the previous provider? Is there an existing entrance conduit, and can the carrier get access for a site survey? Will any Government-furnished equipment be provided?

Government Response:

Reference SOW Section 1.1.5 and 1.1.2 See also SOW Section 3.1 (Circuit Bandwidth) and Section 3.5.

Question 47 Question:

Are there any known asbestos, lead paint or other hazmat restrictions on drilling and penetrations in Building 977? Is a survey available?

Government Response:

Reference SOW Section 1.2.2 See also SOW Section 3.2 and Section 4.2.

Question 48 Question:

Is the Secure Area (CPA) marked on the first-floor plan included in coverage or excluded? Are there restrictions on wireless or cabling in or near it?

Government Response:

Reference SOW Section 1.2.2 and 3.2 See also SOW Section 3.1 (Coverage Area) and Attachment 1.

Question 49 Question:

What do the red, yellow and green room colors on the first-floor plan mean?

Government Response:

They do not mean anything, the colors were not used for any purpose. However, the stars signify the APs. The blue are the AFNet, the Red are commercial See also SOW Section 5 (Attachment 1 – Floor Plan).

Question 50 Question:

Is drilling and cable pulling allowed during the 0800-1600 duty hours, or only outside them? If outside, how is after-hours work approved and escorted?

Government Response:

Cabling, drilling, and cable pulling are primarily restricted to standard base operating hours, Monday–Friday from 0800 to 1600 hours (excludes all federal holidays). Will be escorted the entire time.

Reference SoW Section 1.2.1 See also SOW Section 4.1 (Hours of Access & Maintenance Support).

Question 51 Question:

What are the base access and escort requirements for installers (DBIDS/CAC, processing time, number of people)?

Government Response:

Reference SoW Section 1.2.2 A dedicated government-furnished physical escort will be provided daily to guide technicians through restricted areas and utility closets. Bidders should coordinate the exact number of personnel needing access with the Contracting Officer immediately upon award to prevent schedule delays.

See also SOW Section 4.2 (Security Requirements).

Question 52 Question:

Will the Government hold a second site visit, or allow escorted access for quoters, before the 11/6 deadline?

Government Response:

There is not a second pre-proposal site visit planned prior to the extended proposal deadline. SOW Reference (Section 1.1.7) Establishes that the physical site visit was a mandatory pre-proposal event, and the government's obligation to provide visual site baseline data has been satisfied via the RFQ Q&A amendment.

See also SOW Section 3.7 (Site Visit).

Question 53 Question:

The SOW requires service in existing areas within 10 business days of award. Which areas count as existing and which are the first-floor extension (Wings C and D)?

Government Response:

This was stated multiple times during the site visit.

Existing Areas (10-Business-Day Restoration Target): This covers the areas previously equipped with government owned hardware, specifically the entire second floor and the first floor A wing. Bidders are only responsible for logically configuring and re-establishing service.

New Extension (30-Calendar-Day Deadline): This is the physical scope expansion and is strictly limited to the first floor wings C and D. The contractor must newly engineer, cable, and install hardware specifically to extend coverage into these wings.

See also SOW Section 1 (Scope) and Section 3.2.

Question 54 Question:

The notice says funds are not presently available. When is funding expected, and how will the 10-business-day and 30-day clocks be handled if award is delayed?

Government Response:

Funds were not available at the time the solicitation was initially posted, which is why the notice included standard FAR 52.232-18 (Availability of Funds) language.

Funds are now available for this requirement. However, consistent with federal contracting procedures, this contract will not be awarded until funds are formally obligated in the contract writing sytem.

The 10-business-day core restoration period and the 30-calendar-day expansion period will both begin on the effective date of contract award (date the contract is awarded and funds are obligated).

Question 55 Question:

Does a Service Contract Act wage determination or Davis-Bacon apply to the installation labor?

Government Response:

Yes, the Service Contract Act (SCA) applies to this requirement.

This acquisition is subject to the Service Contract Labor Standards statute. Contractors performing on this contract will be required to comply with the applicable Wage Determination for Bexar County, Texas (currently WD 2015-5253, Revision 31).

If the contractor believes it qualifies for the commercial item exemption under FAR 52.222-52 (“Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services”), the contractor must submit a certification with its proposal stating that all conditions for the exemption have been met. The certification must be signed by an authorized company official.

Davis-Bacon Act does not apply to this requirement, as the principal purpose of the contract is for services rather than construction.

Question 56 Question:

May equipment and installation costs be recovered in the monthly service CLINs, or does the Government expect them in CLIN 0002? The notice warns about unbalanced pricing between those lines.

Government Response:

No. Equipment and installation costs (Non-Recurring Costs) may not be recovered or amortized in the monthly service CLINs (CLINs 0001, 1001, 2001, 3001, and 4001).

The Government expects all one-time equipment, materials, cabling, installation, configuration, and post-installation heat map costs to be priced exclusively in CLIN 0002 (One-Time Installation and Expansion).

CLINs 0001–4001 are intended to reflect only the recurring monthly costs for the commercial dedicated internet circuit, 24/7 network monitoring, help desk support, and ongoing maintenance of the entire Wi-Fi network.

Offerors are cautioned that the Government will evaluate proposals for unbalanced pricing in accordance with FAR 15.404-1(g). Proposals that amortize or “bury” installation costs into the monthly recurring CLINs may be determined to be unbalanced and could result in rejection of the proposal.

Question 57 Question:

How many users and concurrent devices should the network support, and is any separation required (for example guest vs. staff networks)?

Government Response:

Each area and wing has different needs based off of the individuals in the offices. Approximately 400 users will be utilizing the network. Bidders are expected to size the network capacity using their pre-installation site surveys and predictive RF designs (IAW SOW Section 1.1.1).

See also SOW Section 3.1.

Question 58 Question:

Could you please provide a higher-resolution floor plan (PDF or CAD) of the 1st floor C and D Wings? The rooms and dimensions in Attachment 1 are not readable. If a previous heat map or wireless survey exists, please share that as well.

Government Response:

We only have the one map available. An updated one has been attached.

See also SOW Section 5 (Attachment 1) and CDRL 0001.

Question 59 Question:

Could you please provide a list of the existing equipment, including model numbers, serial numbers, and quantities (especially the Aruba AP models)?

Government Response:

HPE Aruba AP-303 dual-band access points…to obtain the serial numbers, the device would have to be removed from the ceiling. There are 12.

Aruba CX 6000 12-Port PoE switches. There are 2.

See also SOW Section 3.1.

Question 60 Question:

What licensing and support covers this equipment (for example, Aruba Central subscriptions, Juniper support contracts), and when does it expire?

Government Response:

The existing hardware is managed via the Aruba AirWave network management platform, utilizing local, on-premises management rather than active cloud-based subscriptions like Aruba Central.

Sustainment & Circuit Expirations:

The hardware itself is government-owned, but the underlying carrier agreement for the 500 Mbps dedicated fiber backhaul is maintained through February 2027.

Question 61 Question:

Is this equipment Government-owned and available for reuse, or does it belong to the previous provider? Will the administrative credentials and current configurations be turned over to the new contractor?

Government Response:

All existing equipment is government owned.

See also SOW Section 3.1.

Question 62 Question:

Where are the telecommunications room(s) and the ISP demarc? Are cable pathways (cable tray, J-hooks, or conduit) available to the 1st-floor C and D Wings, and is rack space and power available?

Government Response:

The current switched are located in D wing Room 205 and B wing in the hallway.

Demarcation is located in bldg. 379 which required base coordination to access.

Accessible Suspended Ceilings:

Building 977 is primarily equipped with standard suspended (drop) acoustic ceiling tiles across the administrative corridors. This provides immediate, accessible routing for the contractor's new horizontal cabling runs.

Existing Pathway Provisions:

* Standard J-hooks and limited cable trays are already routed through the main drop-ceiling plenum spaces. Bidders are authorized to utilize these existing pathways to route new lines where capacity allows.

* Structural concrete dividing walls and firewall boundaries separate the main building from the C and D wings.

New Conduit and Wall Penetrations:

* Where existing conduit sleeves are filled or unavailable, the contractor is permitted to perform core drilling through concrete and cinder block barriers.

* All new cabling run through the suspended ceiling plenum spaces must be Category 6 or 6A plenum-rated copper cabling.

* Any new exposed routing in finished areas where ceiling access is unavailable must use mechanically secured, surface-mounted latching plastic raceways, run flush along baseboards, and be color-matched to the walls.

See also SOW Section 3.1, Section 3.2, and CDRL 0001.

Question 63 Question:

Attachment 1 shows no access points in the 1st-floor A-Wing. Is A-Wing in scope, or is it already considered covered?

Government Response:

Please reference updated map See also SOW Section 5 (Attachment 1) and Section 1 (Scope).

Question 64 Question:

We understand the Secure Area (CPA) in the 1st-floor C-Wing is included in the coverage area. Are there any access, escort, or installation restrictions for work in that area?

Government Response:

As stated during the site visit, the secure area MUST be excluded from the coverage area.

See also SOW Section 3.1 (Coverage Area) and Attachment 1.

Question 65 Question:

Is there a required minimum signal strength (for example, -67 dBm) or expected number of users/devices for the post-installation heat map?

Government Response:

Bidders must design and verify a primary signal strength of -65 dBm or better across at least 95% of the active operational areas in both the restored zones and the new first floor wings C and D.

The signal must maintain a minimum 25 dB Signal-to-Noise Ratio to prevent packet drop-offs and latency spikes.

Reference: SOW Section 1.1.9 (Completion of Work) and Section 1.1.3 (Maintenance): Mandates that the contractor monitor, maintain, and mathematically verify "signal quality, and capacity 24/7/365" and deliver "an accurate heat map of WAP’s surface coverage" using professional predictive/active survey tools (such as Ekahau or equivalent) before final payment is authorized.

See also SOW Section 3.9 and CDRL 0001 (Coverage Heat Map).

Question 66 Question:

Does a Service Contract Act wage determination or Davis-Bacon apply to the installation labor? Is a Service Contract Act wage determination attached? If so, which WD number?

Government Response:

Asked and answered.

Question 67 Question:

May equipment and installation costs be recovered in the monthly service CLINs, or does the Government expect them in the one-time installation CLIN? (Note: The notice warns about unbalanced pricing between those lines).

Government Response:

Referencing the SOW, No. Bidders may not amortize, recover, or "hide" their one-time equipment and installation costs (Non-Recurring Costs, or NRC) inside the monthly recurring service CLINs (Monthly Recurring Costs, or MRC).

Bidders must place 100% of their physical installation costs—including new CAT6/6A cabling, new access point hardware for the first floor C & D wings, switches, edge gateway configuration, and the post installation RF heat map engineering labor—strictly within this one time CLIN.

Bidders must price these CLINs to represent only the true monthly cost of operations; specifically the ISP commercial fiber bandwidth subscription, 24/7/365 remote monitoring, helpdesk support, and recurring hardware maintenance.

To ensure a fair, transparent, and compliant source selection, the Contracting Officer will evaluate bids for unbalanced pricing and may reject any proposal that fails to clearly separate physical installation costs from ongoing monthly service subscriptions.

See also SOW Section 3.1 (Hardware & Materials) and Section 3.9.

Question 68 Question:

The notice says funds are not presently available. When is funding expected, and how will the 10-business-day and 30-day clocks be handled if award is delayed?

Government Response:

Funds were not available at the time the solicitation was initially posted, which is why the notice included standard FAR 52.232-18 (Availability of Funds) language.

Funds are now available for this requirement. However, consistent with federal contracting procedures, this contract will not be awarded until funds are formally obligated in the contract writing sytem.

The 10-business-day core restoration period and the 30-calendar-day expansion period will both begin on the effective date of contract award (date the contract is awarded and funds are obligated).

Question 69 Question:

Commercial carriers usually require 36-month service commitments, but each contract option period is only 12 months. If an option year is not exercised by the Government, may early-termination fees/charges be included in the price, or is there a separate CLIN for them?

Government Response:

No, under federal contracting rules (FAR Subpart 17.2), the Government is under no legal obligation to exercise an option period. The non-exercise of an option is simply the natural expiration of the contract, and the Government is not liable for any early-termination fees or "lost profits" of the contractor or their subcontractor carrier.

Bidders must negotiate their commercial carrier backhaul agreements (with Spectrum or other providers) to align with the Government's annual option structure, or price the risk of potential non-renewal into their initial pricing.

See also SOW Section 2 (Period of Performance).

Question 70 Question:

Do the 10-business-day and 30-day deadlines start on the date of contract award, at a formal Notice to Proceed (NTP), or once contractor personnel have been issued base access credentials?

Government Response:

Referencing the SoW…Both the 10 business day core restoration deadline and the 30 calendar day first floor expansion deadline start officially on the date of contract award.

See also SOW Section 3.2.

Question 71 Question:

A new dedicated 500/500 Mbps fiber circuit typically takes 30 to 90+ days to build on base. Will the Government accept an interim connection (e.g., business 5G fixed wireless) to meet the 10-business-day restoration deadline while the permanent dedicated circuit is provisioned?

Government Response:

A new fiber circuit should not be needed since everything is already there. In regards to the extension, we understand that acceptable delays are possible.

See also SOW Section 3.2.

Question 72 Question:

How long is base credentialing currently taking at JBSA-Randolph, and can the security vetting process begin before the contract award date?

Government Response:

Standard base access credentialing through DBIDS or the processing of temporary passes currently takes 5 to 10 business days from the date the complete and correct paperwork is submitted.

The Government will require selected contractors to complete a Unaccompanied Base Access Request Form (or equivalent JBSA-Randolph form) for all personnel requiring unescorted access to Building 977. This form must be submitted after contract award.

The security vetting process cannot begin prior to contract award.

See also SOW Section 4.2 (Security Requirements).

Question 73 Question:

Given the aggressive 10-day and 30-day completion milestones, is work permitted after hours or on weekends if coordinated in advance with the Government escort?

Government Response:

SOW Reference Section 1.2.1…No Standard hours of installation and maintenance are restricted to Monday–Friday from 0800 to 1600 hours (excluding federal holidays).

See also SOW Section 4.1 (Hours of Access & Maintenance Support).

Question 74 Question:

What do the red, yellow, and green room colors on the first-floor CISP floor plan (Attachment 1) represent?

Government Response:

They do not mean anything, the colors were not used for any purpose. However the stars signify the APs. The blue are the AFNet, the Red are commercial.

See also SOW Section 5 (Attachment 1).

Question 75 Question:

With a 500/500 Mbps circuit requirement, does the Government have an expected or mandated throughput limit per concurrent user (bandwidth throttling)?

Government Response:

Asked and answered See also SOW Section 3.1 and Section 3.5.

Question 76 Question:

Does this commercial Wi-Fi network need to support IoT devices, such as network printers, security cameras, smart TVs, or digital thermostats?

Government Response:

Reference SOW Section 3.2 and 1.1.5 See also SOW Section 3.1 (Coverage Area) and Section 3.5.

Question 77 Question:

What specific monitoring software or options does the Government expect to view on the web-based monitoring interface (e.g., AP online/offline status, active client counts, bandwidth utilization per client)?

Government Response:

Asked and answered See also SOW Section 3.3 (Maintenance – web-based monitoring dashboard).

Question 78 Question:

Does the 500 Mbps symmetrical requirement need to be a dedicated internet access (DIA) circuit with a carrier Service Level Agreement (SLA), or is business-class commercial broadband acceptable if it tests at 500/500 Mbps?

Government Response:

Yes, the circuit must be a Dedicated Internet Access fiber circuit equipped with a carrier level Service Level Agreement. Standard shared business class commercial broadband is not acceptable.

See also SOW Section 3.1 (Circuit Bandwidth) and Section 3.5.

Question 79 Question:

Is any commercial OEM brand acceptable if it meets the specifications, or must it be a specific manufacturer (e.g., Ruckus, Cisco Meraki, Aruba, Juniper Mist)? Are there any DoD Approved Products List (APL) requirements for this commercial network?

Government Response:

Reference SoW Section 1.1.1 & Section 3.1 See also SOW Section 3.1 (Specifications table).

Question 80 Question:

Will the Government provide a dedicated 120V AC circuit/outlet at each…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .