ICS QA - NEW 15Jan2020.pdf

PDF 75 KB Posted

Attached to
Advanced Development for Enhanced Performance Technologies (ADEPT) Federal contract opportunity
Solicitation number
FA8650-20-S-6009
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document contains questions and answers related to a federal solicitation for the development of an Integrated Cockpit Sensor (ICS) system. The solicitation seeks proposals to develop prototypes of an ICS that can monitor and assess pilot physiology and performance. The ICS prototypes are required to integrate multiple sensors, perform real-time alerting and data analysis, and be compatible with existing communication systems. Proposals are due by January 29, 2020. The government will evaluate proposals based on technical approach and cost, and intends to award a contract or Other Transaction Agreement to develop ICS prototypes through testing and demonstration in operational aircraft environments. Questions covered include sensor requirements, data handling, form of proposals, security clearances, and availability of government test facilities.

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Development for Enhanced Performance Technologies (ADEPT), newest first.
File Type Posted
ICS Solicitation -- Revised (Final).pdf PDF
ICS QA - UPDATE 3Jan2020.pdf PDF
ICS Industry Day Attendees.pdf PDF
ICS Industry Day overview - v.2.3.pdf PDF
ICS QA - Industry Day FINAL 23Dec19 (JPM).pdf PDF
ICS Attach 5 -- COG Pack 88ABW-2019-4175.pdf PDF
ICS Attach 4 -- Prime Analysis.pdf PDF
ADEPT Attach 1 -- DD254 (Final).pdf PDF
ICS Attach 2 -- DD254 (Final).pdf PDF
ICS Solicitation -- 10Dec19 (Final).pdf PDF
ADEPT -- Basic ARA (Final).pdf PDF
ICS Attach 1 -- SOO -- 10Dec19 (Final).pdf PDF
ADEPT Attach 2 -- SOO (Final).pdf PDF
ICS Attach 3 -- Model Contract (Final).pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICS Q&A – Update 15 Jan 2020 FA8650-20-S-6009 Call 1

[1] Should the prototypes be able to work in parallel to any existing communication system?

Yes, there should be no interference with any flight system.

[2] Should the prototypes be able to measure before and 24 hours after a physiological event?

There is no requirement for base-lining in the solicitation. Individual differences, and day-to-day differences are a factor, so it is a good idea to consider. Absent specific incidents, there is no requirement that the prototypes monitor continuously as it is unlikely the pilot community will be supportive of physiology monitoring while in a non-duty status.

[3] How many technical areas are there?

There are 5 technical areas in the Statement of Objectives (see SOO on beta.SAM.gov). All technical areas should be addressed in proposals. If a contractor cannot address all areas, teaming is encouraged to meet all requirements in the SOO.

[4] There was no funding profile in the solicitation. Was this an error?

No, this is not a level of effort (LOE) requirement - the Government is looking for a demonstrated, sound prototype at the end of this effort. Contractors should provide a good-faith estimate of the anticipated cost to deliver a viable system in their proposals.

[5] Will cost be evaluated? Is the Government looking for the Lowest Price, Technically Acceptable (LPTA) solution?

Cost/Price will be evaluated in accordance with Section V. of the Solicitation (see page 12 of 15). Cost/Price is second in importance to the Technical evaluation criteria. The Government is looking for the best technical approach and value.

[6] Does the Government have any guidance on adhesive solutions?

The Government’s experience with adhesive solutions is that adhesives comfortable for the pilot tend to detach in the presence of heavy sweat. Conversely, stronger adhesives that work well in heavy sweat cause skin irritation after repeated use when applied to the same contact area.

[7] Who should we contact for follow-up questions?

Please contact the POCs listed in the solicitation.

[8] Is there a requirement to use the COG Pack open architecture platform?

There is no requirement to use COG Pack, however, all deliverables must be compatible with the COG Pack architecture. If you have a platform that works with COG Pack, you can use that platform or build on it. Additionally, since COG Pack is an open architecture, contractors are free to modify COG Pack for their proposed solutions as long as the Government has access/use of the modified code. The Government can make the COG Pack available if the offeror requests it in their proposal.

[9] Do we have to use the entire COG Pack system, or can we use components?

As long as the final deliverable is compatible with COG Pack, then you can use either the whole platform or individual components.

[10] Is the RMF (Risk Management Framework), ATO (Authority to Operate) relevant? Will this be a Government-led or a Contractor-led team, or a mix?

There will be a mix. The Government is responsible for shepherding the required artifacts through the RMF/ATO process. The Government will rely on the contractor to provide technical details and information required for the RMF/ATO process.

[11] What is the allocation of post-operation/offline analysis?

There is no relative priority on post-operation/offline analysis. The goal of this effort is to support and improve cockpit sensing that the pilot can use in real time. Real-time alarms are not within the scope of this current effort.

[12] Do you want a more processed product then?

We want whatever data is available, as rapidly as possible. The goal is to get as much information as possible in order to determine what actually occurred.

[13] Will the Industry Day slides be posted on beta.SAM.gov?

Yes.

[14] Can other vehicles such as a GSA contract be used for this effort?

The intent is to use our own vehicle for this effort to include either a C-type contract or an Other Transaction (OT).

[15] Is a SBIR contractual vehicle appropriate for this effort?

SBIR data rights are not adequate for this effort due to the requirement to transition. The Government intends to use its own vehicle for this effort.

[16] Does the Government want aircraft and pilot physiological data to be aligned and packaged together for easier analysis?

This would be outside the scope of this effort.

[17] Does the Government want the data to be shown in context of acceleration, cabin pressure, etc?

Yes, in accordance with Objective 3.2.4 of the Statement of Objectives, the selected and integrated sensors should account for the cockpit environment, to include acceleration and cabin pressure.

[18] Does the Government want flight profile/performance/maneuver data provided in addition to actual flight parameters; e.g., G-force.

No, this is not within scope of the effort.

[19] Is there a difference between training and operations? Should the prototypes focus on one or the other?

There are no big differences in terms of the requirements for this effort. Aeromedically, the symptoms and issues are the same.

[20] Is the Government interested in using the collected data as an instructional or training tool?

No, this is not within scope of this effort.

[21] Has the Government identified a specific data/cloud storage or data backbone solution – is there a data storage platform available or do we need to make one?

The Government has not identified a specific platform at this time. There should be local storage in the cockpit, which can be uploaded later. The ease of being able to off-load is important.

Logistical speed is a necessity.

[22] Is a 10 minute download of recorded data appropriate?

Time to download aircraft data for current systems is roughly 10 minutes. ICS downloads should be as good as or better than this.

[23] Is it more meaningful to field a system not having all sensors now and iterate future releases or to field a system three years out that has all the required sensors?

Refer to the solicitation and meeting the requirements in the solicitation. The prototypes, with all required capabilities, must be delivered by the end of the Period of Performance.

[24] Is a prototype that filters contaminants relevant?

A prototype that filters contaminants is not relevant, but a prototype that senses contaminants is relevant.

[25] Does the Government anticipate any additional calls under this ARA?

Yes, the Government anticipates separate calls under this ARA.

[26] If the sensor is not on the arm or in a garment—what is the most practical solution?

The Government is looking for a solution to integrate with flight. Broadly, the question is how the solution works with the pilot. Operationally, the device needs to be where the pilot can access without taking away from the mission.

[27] Does the Government have any pilot feedback on body-worn devices versus a separate unit?

The concern with a watch is detectability. If there is a visual on a watch, it would be better to be connected with a haptic and auditory alert. A watch platform is OK, it depends on how it is used in the overall solution. A watch may not have enough computing capability.

[28] Is the Government interested in mounted display options?

Aircraft mounted displays are not platform agnostic and require integration with the aircraft which conflicts with the requirement for a stand-alone system.

[29] Is something in the base layer desirable?

Not necessarily. The Government is looking for ideas.

[30] What is the proposal deadline? Is this a firm date?

Per the solicitation, the proposal due date is 29 January 2020 at 3:00 PM EST. Please review the submission requirements in the solicitation. Please send any additional questions on proposal submittals to the PCO, Mr. Joseph Mizzi.

[31] Is a Secret clearance required for this work? Can subcontractors work at the unclassified level?

Yes, a Secret clearance is required for the Prime Contractor. Subcontractors may work at the unclassified level if they are performing an unclassified aspect of the work. A DD 254 will be put on the contract as an Attachment.

[32] What are the travel requirements for this program?

The program team is manned out of WPAFB. Contractors should propose trips as they deem necessary to accomplish the program objectives.

[33] When will negotiations for data rights take place?

Regarding the proposal selected for negotiation, data rights negotiations will take place after the Government has received business clearance. The vendors’ position regarding what level of data rights the Government should have regarding (1) technical data/software developed under the ICS Program and (2) the Technical Data Package deliverable (refer to CDRL A010) should be stated in the proposal. See Section I, 6.d. of the solicitation for more information on data rights.

The Government desires sufficient data rights to successfully complete air worthiness requirements. The Technical Data Package requirement applies to pre-developed items.

[34] Does the Government have a list of preferred Bluetooth devices?

No.

[35] May a foreign company participate in ICS?

A foreign company is not allowed to participate in ICS. However, Foreign Nationals (FNs) could participate as employees of US prime contractors and/or US subcontractors if they received approval from the Government Foreign Disclosure Office (FDO) and only worked on public domain aspects of the program.

[36] Are there restrictions on exporting data to a cloud repository?

Cellular transmission cannot be used for classified data. There is a possibility to use cellular devices to transmit controlled unclassified information (CUI) data.

[37] What is the classification level for ICS data coming off the aircraft?

This depends on the aircraft platform and cyber security requirements.

[38] Are pilots able to feel haptics/watches against their skin and/or over clothes?

This depends on the platform and what the pilots are doing at that time. Generally, haptic devices would need to be touching the skin for max effectiveness.

[39] Is the Government looking at the data module being on-body or aircraft mounted?

Solutions that do not involve physical integration with the aircraft are sought.

[40] If we can meet 2 or 3 of the requirements, and another contractor can meet the remaining requirements, will the Government force us to partner?

No, the Government cannot force a contractor to partner with another contractor. In this case, vendors would need to form subcontracting relationships on their own to satisfy all the technical requirements of the Solicitation.

[41] Does the Government desire solutions under this proposal to integrate ICS data with aircraft data?

No, this is not within scope of this effort.

[42] What are the conditions for a FAR-based contract versus an OT for Experimentation?

OT’s are typically for non-traditional contractors. There is flexibility in that we would negotiate the clauses -- the FAR clauses would not apply. However, the negotiation and review process could take longer. Please mention if you would like an OT to be considered in your proposal.

The Government is looking for the shortest timeline to award.

[43] What is the anticipated color of money for this effort?

The majority of the funds will be Research and Development (R&D, 3600), with the potential for some Operations and Maintenance (O&M, 3400), as well as DHP R&D and/or DHP O&M. No Procurement funds (3010) are anticipated.

[44] Does the use of O&M (3400) money limit a contract?

There may be some scenarios that could use O&M. However, a contract as a vehicle does not limit the use of O&M in itself. The Purpose Statute must be analyzed in determining whether the use of O&M is appropriate. 3400 O&M funds could be used on both C-type and OTE awards provided the Purpose Statute is satisfied.

[45] What are the testing requirements to prove out a TRL7 prototype?

By the end of the program, the ICS prototype will be at or near planned operational capability and have been demonstrated in an operationally relevant aircraft and flight environment.

[46] Will the Government grant a 30 day extension to the proposal submission deadline?

No, the 22 January 2020 at 3:00 PM EST proposal submission deadline is firm.

[47] The Government states that the ICS prototype will be a stand-alone system (i.e., no integration required with the aircraft); however, the statement was made that integration with the communication system would be acceptable for pilot alerting. Can you clarify these potentially conflicting statements?

Solutions for alerting that operate in parallel with existing communication systems is reasonable and acceptable; e.g., additional speaker in headset ear cups.

[48] Is the Government interested in using collected data to fine tune personalization of alarms?

Yes.

[49] Is there a requirement for ICS to be integrated into the next generation helmet? It could potentially impact the technologies were considering in ICS.

We do not know at this time what the impacts are, if any.

[50] The ADEPT solicitation mentions that each Call will contain a budget. However, Call 1 does not list a budget. Was this a mistake?

The Government intentionally did not include a budget for Call 1. The Government wants vendors to propose what they think the program will actually cost. It’s possible that the Government will include a budget in future Calls.

[51] The ICS RFI # AFRL-711-RHX-002 has a closing date of 3 Jan 2019. Is that when the RFI responses are due?

As stated in Section 4 of AFRL-711-RHX-002, the RFI responses were due on 11 October 2019.

This does appear to be in conflict with the form data listing 3 Jan 2020, however the narrative deadline is the controlling date. The form data is pushed out further than the narrative in the posting because the Government wanted to keep the RFI open to adjust/update the Industry Day information. As stated, the date in Section 4 (11 October 2019) was the deadline. However, vendors who did not submit an RFI response are still able to submit a proposal under FA8650- 20-S-6009 Call 1.

[52] Is it required that prime offeror have a Secret clearance? Or just one of the team members on the proposal?

The prime contractor is required to have the facilities and systems necessary for work at the Secret level.

[53] The solicitation requests one original and one hard copy of the proposal. Can this be satisfied by submitting a CD? Does the Government want an email? Is a hard copy required? If so, how should it be bound?

Two paper versions are required – an original and one (1) copy. Vendors should not submit a CD. Vendors should submit e-copies of their proposals via email. Hard copies can be bound by 3-ring binders, staples, or other plastic binding.

[54] SOO paragraph 3.1 Data Collections and Data Analysis states: "The Contractor shall Develop a method to ensure “sanitization” of data or software being brought into and out of the facility. Data collection in field conditions will be required."

Does this mean the contractor shall apply DoD 5220 with associated series, along with NIST 800-88, and other AFIs, AFRL policy and procedures, and or MIL STDs to ensure “sanitization” or <security> of data or software being brought into and out of the facility occurs?

As opposed to data "cleaning" that is found in Data Science Methods (yes/no)?

“Sanitization” refers to ensuring that technical data transferred between different physical/network environments will adhere to the protection levels commensurate with that environment. For purposes of the ICS effort, technical data/information will either be categorized as classified or unclassified controlled information (UCI). Handling, storage, generation of classified data will follow the National Industrial Security Program Operating Manual (NISPOM) guidance as stated in the ICS solicitation DD254. Protection of technical data/information that is considered UCI is subject to DFARS 252.204-7012 “SAFE GUARDING

COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT

2016)”. Reference the model contract on specific requirements associated with this clause.

[55] Is the contractor working in AFRL facilities and provided office space, cubicles, computers, the base network, and also use of AFRL lab space, and access to USAF simulators, altitude chamber, centrifuge, and test equipment, etc? Or does the contractor have to rent that stuff from the USAF? If so at what rate? If the contractor must provide its own office and lab space and test equipment the contractor should also include that cost in proposal (yes/no)?

The Government is not providing base support (i.e., on-base office space and access to IT and telecomm systems). The expectation is that contractors will conduct the majority of the contracted effort in their facilities. The Government will test contractor supplied components or systems in specialized test chambers (e.g., environmental, altitude, centrifuge) and the final prototype in an operational aircraft. All testing and operational assessments executed by the Government will be at the Government’s expense. Contractors will be issued visitor passes, as needed, for base access to support the Government test, evaluation, and operational demo/assessment activities.

[56] For the Resumes, are names supposed to be on them or not on them?

The Government prefers names are included on resumes but it is not required

[57] Will the Government grant a 7 working day extension on the ADEPT ARA Call 1 ICS solicitation?

The Government will allow for an extension to the Call 1 ICS solicitation proposal submission date to 29 January 2020.

[58] The solicitation indicates that we can communicate with you until the submission of the proposal. Is there a preference for the communications to be via email?

During the RFP phase all questions regarding the solicitation will need to be submitted in writing. Responses to questions will be posted to the beta.SAM.gov site to ensure a level playing field for all bidders.

[59] What is an acceptable size and format of a computational platform? I believe that you indicated that an iphone or ipad or watch or a device of this side could be acceptable, but would like some clarity on this.

The Government does not have a precise requirement for size and weight of the computational platform, but in general smaller is better due to limited or no options for hard mounting such devices in the cockpit. Devices the size of off-the-shelf small PCs and laptops are too large for some USAF platforms; currently many pilots use tablet computers as electronic flight bags so this is a reasonable upper limit on size.

[60] Is there a format/method for data download after the mission?

There is no specified requirement regarding format and method for data download. Contractor format/method is acceptable. Note that CUI or classified data could potentially restrict or limit use of certain transmission methods (e.g., wireless data transfer).

[61] In addition to the data analysis required for the requested parameters, some of which are derived, is there a requirement to do real-time sensor fusion on board during this program?

For example, we could anticipate that a combination of environmental parameters such as cabin pressure, acceleration and a biometric parameter might warrant an alert.

The requirement is to perform effective real-time alerting and mitigation. It would be reasonable to consider that fusion of multiple sensor parameters would be useful to meet this requirement or that it would contribute to a more robust, accurate, and higher confidence of an alert event.

[62] What is the vision for the anticipated future deployment? Which of following best matches thoughts on the ICS system deployment when mature:

o Anticipate using in root cause analysis work in limited number of aircraft o Anticipate deployment in many or all appropriate aircraft

While we cannot commit the Government to a future acquisition, we anticipate that a fully successful ICS system would be procured in relatively large quantities. Due to the low frequency of physiological events, significant numbers of aircraft would need to be equipped for either specific investigations/root cause analysis or routine use. The intent is for the system to serve both needs.

[63] Regarding the need for flight qualified hardware as a data hub recording and computational platform: There had been discussion about use of COTS devices. Is that preferred, or is there a desire to have a flight qualified robust hardware device within this program?

We do not have a preference for COTS devices or flight qualified dedicated hardware, though we would note that the distinction is not as clear now as in the past due to proliferation of approved electronic flight bags and smart watches. Any device that goes into test flights will have to accomplish airworthiness and Safe to Fly as appropriate. We would also emphasize again that desire is to have a capability that is easily applicable to multiple aircraft types.

[64] Section 13, Reference Block 10 G of the DD254 indicates that SIPR-net is required for contract performance. Is this required for performance at the start of the program?

The DD254 is specifying that contractor access to SIPRNet is warranted and such access will be provided and facilitated by the Government. The point at which SIPRNet access is, or will be needed, is undetermined at this time but SIPRNet access will not be needed at the start of the program.

[65] Section 13, Reference Block 10 G of the DD254 indicates that SIPR-net is required for contract performance. Is this required for performance at the start of the program?

The DD254 is specifying that contractor access to SIPRNet is warranted and such access will be provided and facilitated by the Government. The point at which SIPRNet access is or will be needed is undetermined at this time but SIPRNet access will not be needed at the start of the program.

[66] Please can you advise of the limitation on file size (for email submissions) the government can receive in the event DOD Safe is down?

Vendors are encouraged to use email and DoD SAFE to submit electronic copies of their proposals. Note that if DoD SAFE is not working properly, the vendor’s hard copy proposal will be used to determine whether the proposal was submitted timely. If a vendor has trouble sending attachments through email, the vendor can attempt to split up the files and send the attachments through multiple emails.

[67] Is there a cut-off date for the submission of Questions?

Yes, all questions must be received by 22 January 2020.

[68] In the SOO, Section 3.4, it indicates that “The government will conduct independent verification and validation of component and integrated system prototypes throughout the execution of this work utilizing government assets and facilities including use of altitude chambers, human rated centrifuges, etc.” Should we then assume that we should be responsible for finding facilities that can do initial testing in the altitude chambers, and centrifuge, and that AFRL will do verification testing of these initial tests? Can the AFRL or Gov’t chambers/ centrifuge be used to gather data to create/verify transfer functions and algorithms or should we plan on independent work for this?

Our intent in stating “throughout the execution of the program” was to indicate that government test facilities would be available as needed from beginning to end. If you feel there is a more cost or time effective way to execute the work that is not reliant on government facilities you may include that in your proposal. At least some independent verification testing will be performed by the government regardless of the testing plan proposed.