7Nov2019_Adjudicated_CRM.pdf
PDF 88 KB Posted
- Attached to
- Special Warfare Procurement Multiple-Award IDIQ Contract (SW-MAC) Federal contract opportunity
- Solicitation number
- FA8629-20-R-5003
About this file
This document summarizes a request for proposal for a Special Warfare Procurement Multiple-Award Indefinite Delivery Indefinite Quantity contract. The Air Force Life Cycle Management Center is soliciting proposals to establish multiple IDIQ contracts to procure commercial and non-developmental equipment, training, and product support for Special Warfare operators over a potential ten-year period. Eligible equipment categories include ground mobility, aerial insertion, maritime/dive, assault zones, weather sensing, information technology, and surveying/mapping items. The total ceiling value is $950 million to be distributed across the five-year base and five-year option ordering periods. Proposals are due by the date specified in Section L and will be evaluated per the criteria in Section M to award contracts to offerors rated acceptable with low to moderate risk. A price proposal is not required at this time. The minimum task order amount will be fulfilled for all awardees to attend a post-award conference. This is a 100% small business set-aside for NAICS code 339999 with a size standard of 500 employees. The non-manufacturer rule and limitations on subcontracting will apply at the order level.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 7Nov2019_Statement_of_Work.pdf | ||
| 7Nov2019__Instructions_to_Offerors.pdf | ||
| 7Nov2019_Amendment_01_Letter.pdf | ||
| 21OCT2019_Statement_of_Work_(SOW).pdf | ||
| 21OCT2019_Sec_M_Evaluation_Factors_for_Award.pdf | ||
| 21OCT2019_CRM.xls | XLS spreadsheet | |
| DID_DI-MGMT-82256_(A004).pdf | ||
| DID_DI-NDTI-80809B_(A001).pdf | ||
| 21OCT2019_Sec_L_Instructions_to_Offerors.pdf | ||
| DID_DI-MISC-81832_(A005).pdf | ||
| DID_DI-MGMT-80368A_(A009).pdf | ||
| DID_DI-PSSS-81523C_T_(A010).pdf | ||
| 21OCT2019_Exhibit_A_CDRLS.pdf | ||
| 21OCT2019_MODEL_CONTRACT_FA8629-20-R-5003.pdf | ||
| DID_DI-MGMT-80933A_(A006).pdf | ||
| DID_DI-SESS-81248B_(A002).pdf | ||
| DID_DI-TMSS-81815_(A008).pdf | ||
| DID_DI-IPSC-81442_(A003).pdf | ||
| DID_DI-MISC-80508B_(A007).pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Type of Comment
(C) Critical - Would NOT be able to propose to requirement as written, completely missing scope, contradictory requirements between RFP documents, or other "show-stopping" issues with RFP.
(S) Substantive - important issue to address that might cause significant challenges to propose and/or to execute contract. Also, vague or missing requirements and misalignment of CLINs with SOW, CDRL, clauses.
(A) Administrative - punctuation, grammar, undefined terms or acronyms, etc.
D oc um en t T itl e
Pa ge
Pa ra gr ap h
L in e
Comment/Question Disposition of Comment (Government Only)
S SOW 11 Figure 10.1 The current illustration does not include coordination between the Primes and the OEMs. Suggest arrows be inserted that flow both ways between the MAC Prime and the MAC OEM for both R&R Reporting and R&R Coordination
The Government will not have privity of contract with the OEMs; the reporting mechanisms and coordination requirements will need to be agreed upon between the MAC Primes and the OEMs as required in order to fulfill the requirements of the SOW.
S SOW 12 11.1 Responsibilities for Warranty processing is not specifically addressed
Section 10.1 Warranty Repair and Return states: The Contractor shall coordinate with the OEM and/or report the status of warranty repair items as illustrated in Figure 10.1. There are no non-warranty repair and return requirements included in the SOW; there are no non-warranty repair or return CLINS in the model contract. See Amendment 01. SOW Figure 10.1 cross-reference is added to SOW Section 11.2.
S SOW 13 13.1 The requirement for meeting packing military standards may be considered too vague.
See Amendment 01. MIL-STD-2073 Reference has been incorporated into SOW Sec 13.1. and Table 3.1
S Draft Contract 20 9 FAR 52.212-04, alternate I (page 20) and FAR 52-212-04 (page 15) are both included
Alt I of the clause is applicable only to the T&M - type CLINS.
S Draft Contract 20 9 DFARS 252.225-7001, alternate I (page 88) and DFARS 252.225- 7001 (page 86) are both included
Alt I of the clause is applicable only to the T&M - type CLINS.
S Sec L 5 3.2.3 Is the Government requesting a narrative on our full export control process or a singular example of ITAR compliance?
Section L 3.2.3 states: "The Offeror shall provide a narrative that describes the necessary steps to accomplish OCONUS shipping of an item with ITAR restrictions. The narrative shall describe corporate processes to ensure ITAR violations do not occur..." The Offeror would need to discuss the corporate processes in describing the steps to accomplish OCONUS shipping for an item with ITAR restrictions.
Type of Comment
(C) Critical - Would NOT be able to propose to requirement as written, completely missing scope, contradictory requirements between RFP documents, or other "show-stopping" issues with RFP.
(S) Substantive - important issue to address that might cause significant challenges to propose and/or to execute contract. Also, vague or missing requirements and misalignment of CLINs with SOW, CDRL, clauses.
(A) Administrative - punctuation, grammar, undefined terms or acronyms, etc.
D oc um en t T itl e
Pa ge
Pa ra gr ap h
L in e
Comment/Question Disposition of Comment (Government Only)
S SOW 2 1 Will goods and/or services made or provided by a company owned in full or in part by a prime contractor on the MAC contract be allowed to be sold on the MAC contract.
At this time the Government is not restricting MAC Primes from quoting supplies/services manufactured by a company owned in whole or in part by a MAC Prime in response to a fair opportunity request for quote/proposal.
Requirements will be solicited in terms of performance, functional, and physical specifications. If a particular item/service is required then the Government will prepare a brand name/sole-source J&A and will also determine what contract vehicle is most appropriate for the acquisition of those particular supplies/services.
S SOW 4 4.2 Is the Government going to allow MAC Contract Holders to also be an SE&I or ICP Prime?
Refer to Model Contract Clause 5352.209-9000 Organizational Conflict of Interest, Alt V, paragraph (b), and 5352.209-9001 Potential Organizational Conflict of Interest. If the SE&I Prime or Sub is also a MAC Prime; then it will be excluded from participating in MAC delivery orders that provide a solution that is developed/produced/identified by the SE&I contract. The potential OCI created by the ICP and MAC relationship may be mitigated; an OCI mitigation plan would need to be submitted for Government review and approval; the requirement to submit an OCI mitigation plan is dependent on the timing of the MAC and ICP awards.
S Sec M 1 1.1 Will specific NAICS codes be provided per FORQ/P to determine if there is a class waiver of the Non-Manufacturer's Rule for the items being requested?
See response to #13.
RFP Previously, on FBO the Government stated that it was seeking a small business waiver for this solicitation. Has there been any update to that status of that waiver request or is it still pending? If it is still pending, does the Government have any indication whether the waiver request will be successful?
The Government requested a blanket waiver to the NMR; however, the request was disapproved. If, and when necessary during contract performance, the Government will seek a NMR waiver at the order-level.
C Section L - Instructions to Offerors
2 2.2 3,4 Can the government please clarify if an 11x17 page is equivalent to one (1) page or two (2) pages?
See Amendment 01. Clarifying language has been added to Section 2.2.
Each face of an 11 x 17 sheet of paper containing information will be treated as two pages. If both faces contain information, the sheet will be treated as four pages.
C Section L - Instructions to Offerors
3 2.3 2 Can the government please clarify if a subparagraph number is equivalent to a subsection heading?
Refers to a numbered subparagaph.
C Section L - Instructions to Offerors
3 2.6 b, 1 Will the government consider electronic submission by email? No. Section L Section 2.8 provides the physical address to which the proposals shall be delivered.
C Section L - Instructions to Offerors
4 2.9 a (all) Will the government establish Non Disclosure Agreements (NDAs) with the source selection support contractors?
Both Government and Non-Government personnel have signed NDAs. Refer to Section L Section 2.9.
S Attachment 1 - Statement of Work
2 1.0 7-May Can the government please clarify if there will be a contingency plan if SW SE&I and SW ICP contracts are protested/delayed?
No; the SW-MAC can stand alone.