PAR_FBO_FA8625-16-C-6599_DRAFT_P00008_EMD_RFP_20160912.pdf
PDF 6 MB Posted
- Attached to
- Presidential Aircraft Recapitalization
- Solicitation number
- FA8625-15-C-6599
About this file
PAR EMD RFP
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
V - CPIF
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
P00008
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY AFLCMC/WLJK CODE FA8625 7. ADMINISTERED BY (If other than Item 6) CODE S4804A
USAF/AFMC/AFLCMC
AF LIFE CYCLE MANAGEMENT CENTER
2590 LOOP RD W, BLDG 558, RM210
WRIGHT-PATTERSON AFB OH 45433-7142
BETH A. MCDONALD 937-255-7951
beth.mcdonald.2@us.af.mil
DCMA BOEING SEATTLE
20403 68TH AVENUE SOUTH
P.O. BOX 3707, MS 80KM
SEATTLE WA 98124-2207
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
THE BOEING COMPANY
DEFENSE, SPACE & SECURITY
7755 E MARGINAL WAY S
SEATTLE WA 98108-4002
(480) 891-1045
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
X FA8625-16-C-6599
10B. DATED (SEE ITEM 13)
CODE 81205 FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
X C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
10 U.S.C 2304 (c) (1), as implemented in FAR 6.302-1
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: Presidential Aircraft Recapitalization Engineering, Manufacturing, and Development (EMD)
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT OBLIGATION:
TOTAL CONTRACT AMOUNT:
PCO email address:james.patterson.41@us.af.mil Phone: 937.255.1578
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF SIGNER (Type or print)
Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY______________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.15.2 FAR (48 CFR) 53.243 Created 12 Sep 2016 3:07 PM
SCHEDULE OF CHANGES
FA8625-16-C-6599 P00008
1. Pursuant to 10 U.S.C 2304 (c) (1) as implemented in FAR 6.302-1, the subject contract is hereby modified to incorporate the requirement for Engineering, Manufacturing, and Development (EMD) for the Presidential Aircraft Recapitalization (PAR) Program.
2. The change identified in paragraph 1 above results in an increase of $xxxxxxxx to the total contract price and an increase of $yyyyyyyyyy to the total amount obligated.
3. As a result of the above paragraphs, the contract is specifically modified as follows:
a. Section A, Cover Page, SF 26, Block 15g, the Total Contract Price is changed from $X to $y, an increase of $z.
b. Section B, Supplies and Services, is changed as follows:
(1) CLINs 0005, 0006, 0304, 0305, 0306, 0307, 0308, and 0309 are established/reserved as follows:
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0005 CLIN Establish 1 $0.00 Lot $0.00 Noun: PAR EMD
PSC: 1510
NSN: N - Not Applicable Contract type: V - COST PLUS INCENTIVE FEE Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
The Contractor shall develop, integrate, modify, test, deliver and provide pre-operational support for two (2) Presidential Aircraft in accordance with the Presidential Aircraft Recapitalization Engineering, Manufacturing, and Development Statement of Work, Atch 14, dated xx yyy zz.
0005 Section B: CLIN Establish
0006 RESERVED CLIN (supply)
Noun: RESERVED
PSC: 1510
NSN: N - Not Applicable Descriptive Data:
0006 Section B: CLIN Establish
0007 RESERVED CLIN (service)
Noun: PRESIDENTIAL AIRCRAFT PAINT
PSC: 1510
Descriptive Data:
The Contractor shall paint the aircraft in accordance with the approved paint plan and paint specification.
0007 Section B: CLIN Establish
0304 CLIN Establish 1 NSP Lot NSP Noun: EMD DATA EXHIBIT F
PSC: 1510
NSN: N - Not Applicable DD1423 is Exhibit: F Contract type: V - COST PLUS INCENTIVE FEE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
The Contractor shall produce and deliver data in accordance with Atch 14, PAR EMD Statement of Work," dated xx yyy zz, and Exhibit F, "PAR EMD CDRLs."
0304 Section B: CLIN Establish
0305 CLIN Establish 1 NSP Lot NSP Noun: TECH MANUAL CONTRACT REQUIREMENTS EXH G
PSC: 1510
NSN: N - Not Applicable DD1423 is Exhibit: G Contract type: V - COST PLUS INCENTIVE FEE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
The Contractor shall produce and deliver the Technical Manual Contract Requirements (TMCR) in accordance with Atch 14, PAR EMD Statement of Work," dated xx yyy zz, and Exhibit G, "TMCR."
0305 Section B: CLIN Establish
0306 CLIN Establish 1 NSP Lot NSP Noun: TECHNICAL DATA PACKAGE EXH H
PSC: 1510
NSN: N - Not Applicable DD1423 is Exhibit: H Contract type: V - COST PLUS INCENTIVE FEE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
The Contractor shall produce and deliver the Technical Data Package (TDP) in accordance with Atch 14, "PAR EMD Statement of Work," dated xx yyy zz, and Exhibit H, "TDP."
0306 Section B: CLIN Establish
0307 CLIN Establish 1 NSP Lot NSP Noun: CLASSIFIED EMD DATA EXHIBIT I
PSC: 1510
NSN: N - Not Applicable DD1423 is Exhibit: J Contract type: V - COST PLUS INCENTIVE FEE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
The Contractor shall produce and deliver data in accordance with Section C, "Presidential Aircraft Recapitalization Program, Classified Annex" and Exhibit I, "Classified EMD CDRLs."
0307 Section B: CLIN Establish
TECHNICAL DATA VIRTUAL 3-D WALK THROUGH MODEL
0308 CLIN Establish 1 NSP Lot NSP Noun: TECHNICAL DATA PACKAGE FOR EXHIBIT J
PSC:
NSN: N - Not Applicable Contract type: V - COST PLUS INCENTIVE FEE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
The Contractor shall produce and deliver the Technical Data Package (TDP) in accordance with Atch 14, "PAR EMD Statement of Work," dated xx yyy zz, and Exhibit J, "TDP."
0308 Section B: CLIN Establish
TECHNICAL DATA FOR MOCKUPS AND TEST BENCHES
0309 CLIN Establish 1 NSP Lot NSP Noun: TECHNICAL DATA PACKAGE FOR EXHIBIT K
PSC:
NSN: N - Not Applicable Contract type: V - COST PLUS INCENTIVE FEE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
The Contractor shall produce and deliver the Technical Data Package (TDP) in accordance with Atch 14, "PAR EMD Statement of Work," dated xx yyy zz, and Exhibit K, "TDP."
0309 Section B: CLIN Establish
c. Section C, Description/Specs/Work Statement, Other Clauses in Full Text, Clause "C003 Incorporated Documents/Requirements/ (Aug 2006) (Tailored)," subparagraph (a) is changed to add the following"
-"Presidential Aircraft Recapitalization (PAR) Program EMD SOW," dated 27 July 2016, shown as Attachment 17 to Section J.
-"PAR EMD Statement of Work," Classified Annex, dated xx yyy zz.
d. Section E, Inspection and Acceptance, Section I, contract clauses incorporated by reference, paragraph A. Federal Acquisition Regulation Contract Clauses, is changed to add the following:
"52.246-03 Inspection of Supplies - Cost Reimbursement"
e. Section F, Deliveries or Performance, is changed to establish CLINs 0005, 0006, 0304, 0305, 0306, and 0307 delivery as follows:
SHIP MARK TRANS
ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE
0005 1 U ASREQ
Noun: PAR EMD Descriptive Data:
The delivery date for aircraft #1 (delivery to OT) is xx yyy zz.
The delivery date for aircraft #2 (delivery to OT) is aa bbb cc.
Final Aircraft delivery shall be in accordance with AFLCMC/WLJK H098 Presidential Mission Ready Aircraft Acceptance.
Pre-Operational Support shall be provided through completion of OT and deficiency correction.
0005 Section F: CLIN Establish
0304 1 U ASREQ
Noun: EMD DATA EXHIBIT F Descriptive Data:
The Contractor shall deliver the EMD data as required.
0304 Section F: CLIN Establish
SHIP MARK TRANS
ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE
0305 1 U ASREQ
Noun: TECH MANUAL CONTRACT REQUIREMENTS EXH G Descriptive Data:
The Contractor shall deliver the Technical Manual Contract Requirements as required.
0305 Section F: CLIN Establish
0306 1 U ASREQ
Noun: TECHNICAL DATA PACKAGE EXH H Descriptive Data:
The Contractor shall deliver the Technical Data Package as required.
0306 Section F: CLIN Establish
0307 1 U ASREQ
Noun: CLASSIFIED EMD DATA EXHIBIT I Descriptive Data:
The Contractor shall deliver the Classified EMD data as required.
0307 Section F: CLIN Establish
0308 1 U ASREQ
Noun: TECHNICAL DATA PACKAGE FOR EXHIBIT J Descriptive data:
0308 Section F: CLIN Establish
0309 1 U ASREQ
Noun: TECHNICAL DATA PACKAGE FOR EXHIBIT K Descriptive data:
0309 Section F: CLIN Establish
f. Section G, Contract Administration Data, is changed as follows:
g. Section H, Special Contract Requirements, is changed as follows:
(1) The following Section H clauses are added to contract:
AFLCMC/WLJK H096 SUPPORT FOR FUTURE PAR SYSTEM MODIFICATIONS
If the Government pursues any future modification to the PAR System or equipment, the Contractor shall support the design, certifications, approvals, and installation of such modification, regardless of whether the Government procures the modification from the Original Equipment Manufacturer or from a third party manufacturer. The Contractor's support shall include, as necessary, the same engineering consultation, analyses, and access to technical data and licenses which are made available to commercial customers.
The Contractor's support shall be provided on at least as favorable terms as the Contractor's best available commercial practices, rates, terms, and conditions at the time of the effort. The price for any support provided by the Contractor in accordance with this special contract provision shall be negotiated by the parties after the Government identifies the nature and scope of the support effort required.
AFLCMC/WLJK H097 LIMITATION ON LIABILITY FOR GOVERNMENT FURNISHED 747-8 VIP
AIRCRAFT
The 747-8 Aircraft procured under CLINS 0002 AND 0003 of this Contract will be delivered and accepted at Destination. Upon acceptance at the modification center, Boeing shall complete DD1149 inspection for transfer of Government Property. Any discrepancies identified at the time of inspection shall be corrected under the aircraft warranty. The 747-8 Aircraft procured under CLINS 0002 AND 0003 of this
Contract, and provided as Government Property to Boeing Defense, shall not be subject to the equitable adjustment provisions of FAR 52.245-01 for those discrepancies identified during the DD1149 inspection completed by Boeing Defense. Any discrepancies found during the DD1149 inspection are covered under the commercial warranties provided under CLINS 0002 AND 0003. All other aspects of FAR
52.245-01 shall remain in effect. Nothing in this Clause shall affect the Commercial Rights and Warranties afforded to the Government under CLINS 0002 and 0003.
In addition, the contractor is not entitled to any equitable adjustment to the EMD effort for late delivery of
CLINs 0002 and 0003.
AFLCMC/WLJK H098 PRESIDENTIAL MISSION READY AIRCRAFT ACCEPTANCE
CLIN 0004 of this contract requires all efforts necessary to modify two Government Furnished Boeing
747-8 VIP aircraft to meet all the requirements of this contract. Upon completion of the modification and contract compliance verification of the first aircraft the Government will conditionally accept the first modified aircraft. Provided the modified aircraft meets all contract requirements no withhold or contract consideration will be required associated with the conditional acceptance.
If non-compliances are found during contract compliance verification of the first aircraft and the
Government determines it will still conditionally accept the modified aircraft, withhold will be negotiated relative to these non-compliances and a corrective action plan will be submitted to and approved by the
Government.
Upon completion of contract compliance verification, the second modified aircraft will be DD250'ed. Final acceptance of CLIN 0005 will occur upon completion of pre-operational support which concludes at completion of Operational Test and deficiency correction.
h. Section I, Contract Clauses, is changed as follows:
a. Paragraph A, Federal Acquisition Regulation Contract Clauses incorporated by reference, is changed to add the following clauses:
FAR 52.211-05 MATERIAL REQUIREMENTS (AUG 2000)
FAR 52.216-10 INCENTIVE FEE (JUN 2011)
FAR 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT
EXCEEDING $15,000 (MAY 2014)
FAR 52.223-05 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
FAR 52.234-01 INDUSTRIAL RESOURCES DEVELOPED UNDER DEFENSE PRODUCTION ACT
TITLE III (DEC 1994)
FAR 52.243-02 CHANGES -- COST-REIMBURSEMENT (AUG 1987)
FAR 52.246-24 LIMITATION OF LIABILITY -- HIGH-VALUE ITEMS (FEB 1997)
FAR 52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
b. Paragraph B, Defense Federal Acquisition Regulation Supplement Contract Clauses incorporated by reference, is changed as follows:
1) DFARS clause 252.211-7003 Item Unique Identification and Valuation (DEC 2103), is deleted as a reference clause and is included as a DFARS clause incorporated in Full Text, as included in subparagraph h. 2. below.
2) The following clauses are incorporated by reference:
DFARS 252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)
DFARS 252.217-7028 OVER AND ABOVE WORK (OCT 1991)
DFARS 252.223-7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC OR
HAZARDOUS MATERIALS - BASIC (SEP 2014)
DFARS 252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 2012)
DFARS 252.225-7021 TRADE AGREEMENTS - BASIC (NOV 2014)
DFARS 252.228-7001 GROUND AND FLIGHT RISK (JUN 2010)
DFARS 252.228-7005 ACCIDENT REPORTING AND INVESTIGATION INVOLVING AIRCRAFT,
MISSILES, AND SPACE LAUNCH VEHICLES (DEC 1991)
DFARS 252.246-7007 CONTRACTOR COUNTERFEIT ELECTRONIC PART DETECTION AND
AVOIDANCE SYSTEM (MAY 2014)
c. Paragraph C, Air Force Federal Acquisition Regulation Supplement Contract Clauses incorporated by reference, is changed to add the following clauses:
AF 5352.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (NOV 2012)
AF 5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)
i. Section J, List of Documents, Exhibits, and Other Attachments is changed to add Exhibits and Attachments identified on page 9 herein.
LIST OF ATTACHMENTS
DOCUMENT PGS DATE TITLE
EXHIBIT F 231 09 SEP 2016 EMD CONTRACT DATA REQUIREMENTS LIST
EXHIBIT G 29 24 AUG 2016 EMD TECHNICAL MANUAL CONTRACT
REQUIREMENTS
EXHIBIT H 26 24 AUG 2016 EMD TECHNICAL DATA PACKAGE
EXHIBIT I TBD CLASSIFIED EMD CONTRACT DATA
REQUIREMENTS LIST
EXHIBIT J 13 24 AUG 2016 TECH DATA PACKAGE FOR 3-D VIRTUAL WALK
THROUGH MODEL
EXHIBIT K 26 24 AUG 2016 TECH DATA PACKAGE FOR MOCK UPS AND
TEST BENCHES
ATTACHMENT 17 115 27 JUL 2016 PAR EMD STATEMENT OF WORK
ATTACHMENT 18 5 31 AUG 2016 DD FORM 2794 DATA AND SOFTWARE
REPORTING PLAN PRIME CONTRACTOR
ATTACHMENT 19 4 29 AUG 2016 DD FORM 2794 DATA AND SOFTWARE
REPORTING PLAN COMMUNICATIONS SUBK
ATTACHMENT 20 5 29 AUG 2016 DD FORM 2794 DATA AND SOFTWARE
REPORTING PLAN PROPULSION SUBK
ATTACHMENT 21 4 29 AUG 2016 DD FORM 2794 DATA AND SOFTWARE
REPORTING PLAN FURNISHINGS AND
EQUIPMENT SUBK
ATTACHMENT 22 6 08 JUN 2015 DD FORM 254 RFP (EMD)
ATTACHMENT 23 1 08 OCT 2015 DD FORM 1653 V2 TRANSPORTATION DATA FOR
SOLICITATIONS
ATTACHMENT 24 2 08 OCT 2015 AFMC FORM 158 PACKAGING REQUIREMENTS
ATTACHMENT 25 1 02 FEB 2016 PAR EMD GFI/GFP/GFE LIST
ATTACHMENT 26 5 17 JUN 2016 DD FORM 2794 DATA AND SOFTWARE
REPORTING PLAN BOEING COMMERCIAL
AIRCRAFT
ATTACHMENT 27 5 20 JUN 2016 PAR EMD COST AND SCHEDULE INCENTIVE
PLAN 20160620
GENERAL NOTES/INSTRUCTIONS
CONTRACT DATA REQUIREMENTS LIST (CDRL)
for the
PRESIDENTIAL AIRCRAFT RECAPITALIZATION PROGRAM
(PAR)
9 September 2016
PREPARED BY
AFLCMC/WLJ
MOBILITY DIRECTORATE
WRIGHT-PATTERSON AIR FORCE BASE, OHIO 45433
FA8625-16-C-6599
Exhibit F
Presidential Aircraft Recapitalization Program (PAR)
TABLE OF CONTENTS
PAGE
NUMBER
1. SCOPE 3
2. GENERAL 3
3. TAILORED DATA ITEMS 3
4. MODIFICATION OF DATA REQUIREMENTS 3
5. DATA SUBMITTAL APPROVALS 4
6. REVISIONS TO DATA SUBMITTALS AND RESUBMITTALS OF DATA 4
7. DATA PREPARATION 5
8. DOCUMENT REVISIONS 6
9. DOCUMENTATION MARKING 7
10. METHOD OF TRANSMITTAL 8
11. DISTRIBUTION/MAILING ADDRESS LIST 8
12. REFERENCE DOCUMENTS 8
13. ACRONYMS AND ABBREVIATIONS 9
FA8625-16-C-6599
CDRL GENERAL NOTES/INSTRUCTIONS
1. SCOPE: This Contract Data Requirements List (CDRL) establishes the data to be delivered by the Contractor and the submittal, approval and distribution requirements of all the CDRL data items contained herein. The Contractor shall utilize best commercial practices and the guidance referenced in paragraph 12 of these general notes/instructions in meeting the requirements of this CDRL.
2. GENERAL: The Data Item Description (DID) specified in the CDRL is in the Acquisition Streamlining and Standardization Information System (ASSIST) database.
3. TAILORED DATA ITEMS: A slash (/) and the letter "T" (e.g., DI-ILSS-80569/T) added to the DID number in Block 4 of the CDRL (DD Form 1423-1) denotes that the DID has been tailored to comply with specific system requirements. The tailoring instructions are listed in Block 16 of each affected DD Form 1423-1.
4. MODIFICATION OF DATA REQUIREMENTS:
a. From time to time during the performance of this contract, the Procuring Contracting Officer (PCO) may, unilaterally, change the place of delivery and the technical office for any line item of contract Exhibit A (DD Form 1423-1) hereto, at no change in contract price, notwithstanding the provision of the clause of Section I entitled “Changes.” If there is a change in the place of delivery the Contractor and the PCO may mutually agree to an extension of the data submittal requirement date.
b. From time to time during the performance of this contract, the PCO may, unilaterally, increase or decrease the number of addresses and/or increase or decrease the number of paper copy deliverables (regular or reproducible) specified for any data item of the CDRL hereto, at no change in price provided that the increase in the total number of paper copies (regular or reproducible) for an individual line item of data shall not be greater than one hundred-fifty percent (150%) of the total number of paper copies (regular or reproducible) initially specified in the CDRL nor shall the decrease in the total number of paper copies (regular or reproducible) for an individual item of data be greater than fifty percent (50%) of the total number of paper copies (regular or reproducible) initially specified in the CDRL. In the event of an increase greater than such 150% or of a decrease greater than fifty percent (50%), the parties will negotiate any equitable adjustments in accordance with the procedures of the “Changes” clause. The Contractor shall provide electronic access to all CDRL deliveries without any limitation on number of users.
c. From time to time during the performance of this contract, the PCO may, unilaterally, make other administrative and clarification changes to the CDRL hereto, and the contract price will constitute full satisfaction of any entitlement of equitable adjustment under the “Changes” clause provided the Contractor agrees to accept such change at no change in contract price.
FA8625-16-C-6599
d. Unilateral actions pursuant to (a), and (b) above shall be by the issuance of
PCO Letter (PCOL) followed by a Supplemental Agreement to this contract, which will reference this clause as its authority. Any action directed by this clause shall be effected by the Contractor beginning with the first submission of the particular data item or items after receipt by the Contractor and PCO’s direction.
5. DATA SUBMITTAL APPROVALS: The following definitions apply to Block 8 of the DD Form 1423-1:
a. The use of an "A" in Block 8 indicates that Government approval of the identified document is required to assure that the Contractor is sufficiently prepared to proceed to the next phase of the contract in addition to verifying compliance with the DID and CDRL requirements and requires advance written approval prior to preparation and publication of the final document. Unless otherwise specified on the DD Form 1423-1, the Office of Primary Responsibility (OPR) noted in block 6 will review the data submitted for approval and the PCO (AFLCMC/WLJC) will notify the Contractor of approval/disapproval or corrective action required within forty-five (45) calendar days after receipt of data submittal. If the program office is not able to respond within forty-five (45) calendar days, the Contractor will be notified and a new mutually agreed upon suspense date will be established. If the program office has not provided approval/disapproval/intent to extend due date within forty-five (45) calendar days, the data will be considered automatically approved. However, the Contractor shall notify the program office via telecon or fax prior to assuming approval.
b. If Block 8 has an “N/A” these data items are considered non-approval, however this does not relieve the Contractor of the responsibility of compliance with applicable regulations, standards, procedures, etc. All data submissions are subject to review and approval by the procuring agency for departure from said compliance. Block 8, left blank, does not require a draft submission in advance of the final document unless otherwise specified on the DD Form 1423-1. The presence or absence of an “A” in Block 8 does not relieve the Contractor of the responsibility of full contractual compliance and all data will be subject to review and acceptance by the Government.
c. The PAR program office will formally respond to the Contractor within forty-five (45) calendar days after receipt of any data that is technically disapproved. Data submittal requirements shall not be considered to have been met until the procuring agency has determined that all contractual requirements have been met regarding the identified data.
6. REVISIONS TO DATA SUBMITTALS AND RESUBMITTALS OF DATA:
a. Unless otherwise specified, data submittals that are disapproved by the Government, shall be revised and resubmitted by the Contractor within thirty (30) calendar days after receipt of PCOL. If the Contractor cannot resubmit within thirty (30) calendar days, the PAR Data Manager shall be notified within fifteen (15) calendar days and a new mutually agreed upon suspense date will be established.
b. Data submittals that are approved contingent upon revision shall be revised and distributed within thirty (30) calendar days after receipt of PCOL, or as specified in the
FA8625-16-C-6599
delivery requirements of the applicable DD Form 1423-1. If the Contractor cannot resubmit within the required time, the PAR Data Manager shall be notified within fifteen (15) calendar days and a new mutually agreed upon suspense date will be established. Final distribution shall be accomplished within thirty (30) calendar days after receipt of approval or completion of corrective action constituting approval.
7. DATA PREPARATION:
a. Data submitted by the Contractor shall conform to the quality requirements specified on the CDRL for each data item. If the data preparation instructions contained in Block 16 of the DD Form 1423-1 are different from the instructions contained in the DID, the DD Form 1423-1 instructions shall have precedence.
b. Data shall be delivered by one of the following methods.
1) Electronic Delivery/Availability – includes delivery/availability of data files via a
Government approved website, webpage, server or via attachment of electronic files to e-mail messages as mutually agreed to between the Government and the Contractor. Electronic data delivery and access is subject to Government protection/security requirements. Notification of electronic delivery/availability of deliverables shall be sent to AFLCMC/WLJC Data Management Office (DMO). CDRLs (F018, F010, F020, F021, F022, F023, F024, F096, and F123) shall be submitted in accordance with the address in Block 16 of the DD Form 1423-1.
2) Other Electronic Formats – data may be provided in appropriate format using media such as, CD-ROM or DVD-ROM or other suitable physical electronic media. A document may consist of multiple files, but files should not be compressed or archived to save space. Exceptions must be prearranged with AFLCMC/WLJ. The Contractor shall contact AFLCMC/WLJC DMO for Block 14 DD Form 1423-1 distribution requirements ten (10) business days prior to first delivery for each DD Form 1423-1 delivered by these means. Disc label shall contain the following information:
CDRL Item No. Distribution Statement Document Title Export-Control Warning Statement Submission Date Destruction Notice Author, Company, Phone File Name(s) and Formats
All text files shall be submitted as MS-Word or searchable Acrobat (PDF) file documents with copy and paste capability. Each MS-Word document shall have a filename, a subject field and the file should have author/agency/phone in the Author field and key words in the Keywords field.
All non-text documents (spreadsheets, graphics, databases etc.) shall be accompanied by a MS-Word document as described above. Acceptable applicable files for non-text documents include, but are not limited to, PowerPoint, Excel, Access, Project and PDF. Each non-text document shall have a filename, a subject field and the file should have author/agency/phone in the Author field and key words in the Keywords field.
3) Paper Copies – Paper copies shall be submitted on standard 8 ½ x 11- inch document size bond paper and shall be sufficiently legible to be suitable for reproduction from a direct copying machine. The Contractor shall contact AFLCMC/WLJC DMO for Block 14 DD Form 1423-1 distribution requirements ten (10) business days prior to first delivery for each DD Form 1423-1 delivered by these means.
c. The order of precedence is: 1) electronic delivery/availability; 2) CD-ROM/DVD- ROM; 3) 8 1/2 X 11-inch paper format.
d. All data shall be submitted in the English language.
e. Formal deliverables shall be in accordance with Blocks 10-13. Any initial, preliminary, draft, or other interim versions not called out in CDRLs shall be made available informally to the Government upon request.
8. DOCUMENT REVISIONS: The Contractor shall comply with the following requirements in the revision of documents provided in response to the data requirements specified in the CDRL. The Government will request from the Contractor, by PCO Letter, submittal of revision(s) to a final data delivery. If the Contractor identifies the need for a revision to a final data delivery, the Contractor shall request from the Government, by contracting letter, approval to proceed with submittal of revised data.
a. When resubmission of data is requested, complete documents shall be submitted unless otherwise specified and shall be marked in accordance with Paragraph 9, Documentation Marking, of these General Notes.
b. A "revisions" page shall be provided and shall contain, as a minimum:
1) A brief description of the reason for revision, including the applicable authority;
e.g., Engineering Change Proposal (ECP), change order, supplemental agreement.
2) Revision identification letter or number and revision date.
c. Each revised page shall have the specific changes identified on the revision page.
d. Each page shall contain the revision number.
e. Anytime a revision is submitted, the title page of the document shall indicate the number or letter and date of that revision. Latest revision symbol and date shall be visible on the front surface of the document.
f. The letter of transmittal for each revision shall reference all previous/pertinent correspondence relating to the documentation being submitted.
FA8625-16-C-6599
9. DOCUMENTATION MARKING: DoD Directive 5230.24, Distribution Statements on Technical Documents, provides policy and guidance on marking documents.
Air Force Instruction (AFI) 61-204, Disseminating Scientific and Technical Information, specifies certain distribution statements to be used on data to control distribution by government agencies such as the Defense Technical Information Center (DTIC).
a. Distribution Statements: Block 9 of the DD Form 1423-1 annotates the relevant distribution statement applicable to the data to be submitted. This distribution statement shall have precedence over other technical documentation on this contract, unless otherwise specified by the PAR program office.
b. Export-Controlled Warning Statement: In addition to the distribution statement annotated in Block 9 of the DD Form 1423-1, the following warning statement shall also apply on all technical data on this contract:
“WARNING” - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, USC, App 2401, et seq. Violations of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DoD Directive 5230.25.
When it is not technically feasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the “Notice to Accompany Release of Export- Controlled Data” required by DoD Directive 5230.25.
c. Contractor Imposed Distribution Statements. Part 35, of the Federal Acquisition Regulations (FAR) stipulates control procedures for contractor controlled technical information in which the government has limited rights. These procedures shall be followed as described in AFI 61-204, Disseminating Scientific and Technical Information.
d. DESTRUCTION NOTICE – For classified documents, mark documents with the following statement “Destruction Notice - Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Regulation, Chapter VI.” For unclassified, limited documents, (i.e., not approved for public release) mark documents with the following statement “DESTRUCTION NOTICE – Destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
e. The contractor is responsible for ensuring adequate marking and security measures are in place to prevent unauthorized access to electronic data. The contractor is not authorized to provide copies of any data on the CDRL to activities who are not specifically identified in the distribution block of the CDRL without written government approval from the AFLCMC/WLJ program office.
FA8625-16-C-6599
10. METHOD OF TRANSMITTAL:
a. In addition to DD Form 250 Material Inspection and Receiving Report requirements (where applicable), all data submittals shall be accompanied by a letter of transmittal and the Government shall acknowledge receipt and acceptance, where Government approval is required. All deliverables shall be directed to the OPR listed in Block 6 of the DD Form 1423-1 regardless of the method of data submission (i.e., paper copy, CD ROM/DVD, on-line access, e-mail message, provided at a review, etc.) The letter of transmittal shall include as a minimum: reference to the contract number, program name, data item number, title, CDRL sequence number, revision level, any Contractor's control number assigned to that data, and the method of submittal. The data itself shall contain the above information as well as the transmittal letter number. The Contractor shall place a complete list of addresses at the end of the transmittal document, annotating the data recipients (as listed on the DD Form 1423-1) and of the corresponding number of copies distributed to each.
b. Unless otherwise specified in Block 16 of the DD Form 1423-1, data submittal date is interpreted as the date the Government receives the data. Electronic data available after 3:00 ET shall be considered delivered the next business day. Submittal days are considered as work days unless it’s a Saturday delivery, then it would be a Friday submittal; if a Sunday delivery then it would be a Monday submittal. If the submittal day is a federal holiday, then the delivery day would be the first work day following the holiday.
c. For each data item in the CDRL, the contractor shall clearly state in the final transmittal letter (or final DD Form 250 delivery) that this is the last submittal being made and that all contractual requirements concerning that data item have been fulfilled.
d. Classified data shall be submitted in accordance with NISPOM. The Contractor shall contact the PCO for the addressees of classified data.
e. If the same documentation is required on multiple contracts/tasks, only one submittal per functional addressee will be made. When updates are required on one contract/task, all addressees will receive the updates to the documentation with that contract absorbing the cost for the update/change.
11. DISTRIBUTION/MAILING ADDRESS LIST: Identify applicable CDRL OPR and addressees. Government data management will provide updated CDRL addressees to Contractor data management via electronic media as required.
12. REFERENCE DOCUMENTS (for guidance purposes).
a. DoDI 5000.02, Operation of the Defense Acquisition System
b. DoDI 5200.01, DoD Information Security Program and Protection of Sensitive Compartmented Information
c. DoD 5200.1-R, Information Security Program Regulation
d. DoD 5010.12-M, Procedures for the Acquisition and Management of Technical Data.
e. DoD 5220.22-M, National Industrial Security Program Operating Manual
f. DoD Directive 5230.09 Clearance of DoD Information for Public Release
FA8625-16-C-6599
Exhibit F http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2126.html
g. DoDI 5230.24, Distribution Statements on Technical Documents
h. DoD Directive 5230.25 Withholding Of Unclassified Technical Data From Public Disclosure
j. AFI 61-204, Disseminating Scientific and Technical Information
k. Acquisition Streamlining and Standardization Information System (ASSIST)
13. ACRONYMS AND ABBREVIATIONS:
AFI Air Force Instruction ASSIST Acquisition Streamlining and Standardization Information System CDRL Contract Data Requirements List DID Data Item Description DMO Data Management Office DoD Department of Defense DTIC Defense Technical Information Center ECP Engineering Change Proposal FAR Federal Acquisition Regulations NISPOM National Industrial Security Program Operating Manual OPR Office of Primary Responsibility PAR Presidential Aircraft Recapitalization PCO Procuring Contracting Officer PCOL Procuring Contracting Officer Letter
CONTRACT #: FA8625-16-C-6599
CONTRACTOR: Boeing
SET NAME: Exhibit F EMD SYSTEM ITEM:
PROGRAM: PAR
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
F001 AFLCMC/WLJ DI-MISC-81241 SOW Para 1.2.3.a.1.viii
Airworthiness Directives/Service Bulletins/Advisory Data
F002 AFLCMC/WLJ DI-MISC-81454C SOW Para 1.2.3.a.1.vii
Automated Computer Program Identification Number (ACPIN) Data and Control Record
F003 AFLCMC/WLJ DI-ADMN-81249A/T BLK16
Conference Agenda
Conference, Meeting, Review or Audit Agenda
F004 AFLCMC/WLJ DI-ADMN-81250A/T BLK16
Conference Minutes
Conference, Meeting, Review or Audit Minutes
F005 AFLCMC/WLJ DI-SESS-81646B SOW Para 1.2.3.a.1.iii
Configuration Audit Plan
FCA and PCA Plan
F006 AFLCMC/WLJ DI-SESS-82007 SOW Para 1.2.3.a.1.ii
Configuration Item (CI) Documentation Recommendation
(MIL-STD-3046)
BLK16
F007 AFLCMC/WLJ DI-SESS-81253B/T SOW Para 1.2.3.a.1.ix
Configuration Status Accounting (CSA) Information
F008 AFLCMC/WLJ DI-ADMN-81401B SOW Para 1.2.3.a.1.viii
Contract Change Proposal
F009 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.2.10.2.e
Management Plan
BLK16
F010 AFLCMC/WLJ DI-MGMT-81453A SOW Para 1.2.3.a.2
Data Accession List
F011 AFLCMC/WLJ DI-SESS-80639D BLK16
Engineering Change Proposal (ECP)
17of1Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
F012 AFLCMC/WLJ DI-SESS-80642D SOW Para 1.2.3.a.1.viii
Notice of Revision (NOR)
F013 AFLCMC/WLJ DI-SESS-80640D SOW Para 1.2.3.a.1.viii
Request for Variance (RFV)
F014 AFLCMC/WLJ DI-SESS-81254C SOW Para 1.2.3.a.1.vi
Request For Nomenclature (DD FORM 61)
F015 AFLCMC/WLJ DI-MISC-80508B/T SOW Para 1.2.3.a.1.viii
Technical Report-Study/Services
Service Publication Review Report
F016 AFLCMC/WLJ DI-SESS-80643D SOW Para 1.2.3.a.1.viii
Specification Change Notice (SCN)
F017 AFLCMC/WLJ DI-MISC-81283/T SOW Para 1.2.1.d
Specification Requirement Verification Matrix
F018 AFLCMC/WLJ DI-MGMT-81468/T SOW Para 1.3.3.e
Contract Funds Status Report (CFSR)
F019 AFLCMC/WLJ DI-MGMT-81334D SOW Para 1.3.3.a
Contract Work Breakdown Structure
F020 AFLCMC/WLJ DI-FNCL-81765B SOW Para 1.3.3.k
Contractor Business Data Report (DD Form 1921-3)
F021 AFLCMC/WLJ DI-FNCL-81565C SOW Para 1.3.3.b
Cost Data Summary Report (DD Form 1921)
F022 AFLCMC/WLJ DI-FNCL-81566C SOW Para 1.3.3.b
Functional Cost-Hour Report (DD Form 1921-1)
F023 AFLCMC/WLJ DI-MGMT-82035/T SOW Para 1.3.3.b
Software Resources Data Reporting: (BLK 16)
F024 AFLCMC/WLJ DI-MGMT-81861A/T SOW Para 1.3.3.d
Integrated Program Management Report (IPMR)
F025 AFLCMC/WLJ DI-SAFT-80102C/T SOW Para 1.2.7.1.p
Safety Assessment Report (SAR)
F026 AFLCMC/WLJ DI-SAFT-80101C SOW Para 1.2.7.1.n
System Safety Hazard Analysis Report (SSHAR)
Safety Hazard Analyses (SHA) Report
F027 AFLCMC/WLJ DI-SAFT-80970A/T SOW Para 1.2.13.e.4
17of2Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
Critical Safety Item, Characteristic and Critical Defect Report
BLK16
F028 AFLCMC/WLJ DI-SAFT-81932/T SOW Para 1.2.7.1.b
Critical Safety Item (CSI)/Critical Application Item (CAI) List
PAR System Critical Item List
F029 AFLCMC/WLJ DI-SAFT-81934 SOW Para 1.2.13.e.1
Process/Operations Sheet
PAR System CSI Process and Operations Sheet
F030 AFLCMC/WLJ DI-SAFT-81935 SOW Para 1.2.13.e.2
Inspection Method Sheet
PAR System CSI Inspection Method Sheet
F031 AFLCMC/WLJ DI-SAFT-81933 SOW Para 1.2.13.e.3
Critical Safety Item Inspection and Material Certification Report
BLK16
F032 AFLCMC/WLJ DI-HFAC-80746C SOW Para 1.2.6.c
Human Engineering Design Approach Document-Operator
F033 AFLCMC/WLJ DI-HFAC-80747B/T SOW Para 1.2.6.d
Human Engineering Design Approach Document-Maintainer
F034 AFLCMC/WLJ DI-HFAC-80744B SOW Para 1.2.6.f
Human Engineering Test Report
Anthropometric Evaluation Report
F035 AFLCMC/WLJ DI-HFAC-80744B SOW Para 1.2.6.h
Human Engineering Test Report
Usability Evaluation Report
F036 AFLCMC/WLJ DI-HFAC-80744B SOW Para 1.2.6.l
Human Engineering Test Report
Workflow Evaluation Report
F037 AFLCMC/WLJ DI-HFAC-80744B SOW Para 1.2.6.j
Human Engineering Test Report
CSO Workload Evaluation Report
F038 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.1.7.22.a
Technical Report-Study/Services
17of3Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
BLK16
F039 AFLCMC/WLJ DI-MISC-80508B/T SOW Para 1.1.7.22.b
Technical Report-Study/Services
Presidential Interior Acceptance Standards Report
F040 AFLCMC/WLJ DI-MISC-81688 SOW Para 1.3.7.j
Key Management Plan (KMP)
F041 AFLCMC/WLJ DI-MISC-80508B/T SOW Para 1.1.7.22.g
Technical Report-Study/Services
Layout Of Passenger Accommodations (LOPA)
F042 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.1.1.6.c
Management Plan
PAR System Paint Plan
F043 AFLCMC/WLJ DI-MGMT-80004/T SOW Para 1.2.10.2.c
Management Plan
BLK16
F044 AFLCMC/WLJ DI-NDTI-80603A SOW Para 1.1.4.13.2.n
Test Procedure
BLK16
F045 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.4.14.a
Test Plan
BLK16
F046 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.1.4.13.2.k
Management Plan
Communications Commissioning Plan
F047 AFLCMC/WLJ DI-NDTI-80809B SOW Para 1.1.4.13.2.l
Test Inspection/Report
Communications Commissioning Report
F048 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.1.4.13.2.j
Management Plan
BLK16
F049 AFLCMC/WLJ DI-EMCS-81543A SOW Para 1.1.14.15.i
Spectrum Supportability Risk Assessment (SSRA)
EMD SSRA
17of4Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
F050 AFLCMC/WLJ DI-EMCS-81827 SOW Para 1.2.10.3.a
Spectrum Certification Spectral Characteristics Data
F051 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.1.4.13.2.b, 1.1.4.15.h
Technical Report-Study/Services
BLK16
F052 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.1.4.13.2.e
Technical Report-Study/Services
BLK16
F053 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.1.4.13.2.c
Technical Report-Study/Services
BLK16
F054 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.1.3.7.b
Technical Report-Study/Services
BLK16
F055 AFLCMC/WLJ DI-SESS-80567B SOW Para 1.1.3.5.d
Subsystem Design Analysis Report
Electrical Controls Integration Report
F056 AFLCMC/WLJ DI-SESS-80567B SOW Para 1.1.3.5.c
Subsystem Design Analysis Report
Electrical Load Analysis Report
F057 AFLCMC/WLJ DI-SESS-80567B SOW Para 1.1.3.5.b
Subsystem Design Analysis Report
Electrical Subsystem Design Analysis Report
F058 AFLCMC/WLJ DI-MCCR-80700/T SOW Para 1.1.3.7.c
Computer Software Product End Items
Environmental Control System Computer Model
F059 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.2.10.1.c
Management Plan
PAR Airworthiness Plan
F060 AFLCMC/WLJ DI-SESS-81766 SOW Para 1.2.10.1.d
Airworthiness Specification
PAR Airworthiness Certification Basis
F061 AFLCMC/WLJ DI-SESS-81768 SOW Para 1.2.10.1.e
17of5Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
Airworthiness Certification Criteria Report
PAR Airworthiness Certification Compliance Report
F062 AFLCMC/WLJ DI-SESS-81956 SOW Para 1.2.12.c
Aircraft Structural Integrity Program (ASIP) Master Plan
F063 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.12.e
Technical Report-Study/Services
Avionics Integrity Program (AVIP) Master Plan
F064 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.12.g
Technical Report-Study/Services
BLK 16
F065 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.2.12.i
Management Plan
BLK 16
F066 AFLCMC/WLJ DI-MFFP-81972/T SOW Para 1.2.8.g
BLK16
F067 AFLCMC/WLJ DI-MGMT-81501A SOW Para 1.2.1.p
Weight and Balance Report for Aircraft
F068 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.4.13.4.e
Test Plan
Wireless Service Functional Test Plan
F069 AFLCMC/WLJ DI-NDTI-80603A SOW Para 1.1.4.13.4.g
Test Procedure
Wireless Service Functional Test Procedures
F070 AFLCMC/WLJ DI-NDTI-80809B SOW Para 1.1.4.13.4.h
Test/Inspection Report
Wireless Service Functional Test Report
F071 AFLCMC/WLJ DI-ILSS-80872/T SOW Para 1.3.1.a.
Training Materials
BLK16
F072 AFLCMC/WLJ DI-EMCS-81541B/T SOW Para 1.1.9.f
Electromagnetic Environmental Effects (E3) Verification Procedures (E3VP)
F073 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.8.f
Technical Report – Study/Services
17of6Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
Downtime Drivers Report
F074 AFLCMC/WLJ DI-IPSC-81428A SOW Para 1.2.2.d
Software Installation Plan (SIP)
F075 AFLCMC/WLJ DI-IPSC-81432A SOW Para 1.2.2.d
System/Subsystem Design Description (SSDD)
F076 AFLCMC/WLJ DI-IPSC-81433A SOW Para 1.2.2.d
Software Requirements Specification (SRS)
F077 AFLCMC/WLJ DI-IPSC-81435A SOW Para 1.2.2.d
Software Design Description (SDD)
F078 AFLCMC/WLJ DI-IPSC-81436A SOW Para 1.2.2.d
Interface Design Description (IDD)
F079 AFLCMC/WLJ DI-IPSC-81439A SOW Para 1.2.2.d
Software Test Description (STD)
Software/Firmware Test Description
F080 AFLCMC/WLJ DI-IPSC-81440A SOW Para 1.2.2.d
Software Test Report (STR)
Software/Firmware Test Report
F081 AFLCMC/WLJ DI-SESS-80255A SOW Para 1.2.8.d
Failure Summary & Analysis Report
F082 AFLCMC/WLJ DI-MCCR-80700/T Sow Para 1.1.8.a
Computer Software Product End Items
F083 AFLCMC/WLJ DI-SESS-81248B SOW Para 1.2.1.i
Interface Control Document (ICD)
F084 AFLCMC/WLJ DI-SESS-81785A SOW Para 1.2.1.f
Systems Engineering Management Plan (SEMP)
PAR SEMP
F085 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.9.o
Technical Report-Study/Services
Information System Continuous Monitoring Plan
F086 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.9.d
Technical Report-Study/Services
BLK16
F087 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.9.p
17of7Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
Technical Report – Study/Services
Information System Continuous Monitoring Report
F088 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.9.u
Technical Report – Study/Services
BLK16
F089 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.9.v
Technical Report – Study/Services
Chain of Custody Report
F090 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.9.mm
Technical Report-Study/Services
Cybersecurity Audit and Maintenance Log Report
F091 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.9.oo
Technical Report-Study/Services
Cybersecurity Vulnerability Analysis Report
F092 AFLCMC/WLJ DI-EMCS-81684 SOW Para 1.2.9.l
TEMPEST Test Evaluation Report
Cybersecurity Report
F093 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.1.7.22.j
Technical Report-Study/Services
Casket Accessibility Report
F094 AFLCMC/WLJ DI-MGMT-81398C SOW Para 1.2.7.1.m
Hazardous Materials Management Program (HMMP) Plan
F095 AFLCMC/WLJ DI-MISC-81397C SOW Para 1.2.7.2.f
Hazardous Materials Management Program (HMMP) Report
F096 AFLCMC/WLJ DI-FNCL-81567C SOW Para 1.3.3.b
Progress Curve Report (DD Form 1921-2)
F097 AFLCMC/WLJ DI-MGMT-81949 SOW Para 1.3.10.d
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation
F098 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.8.o
Technical Report – Study/Services
Failure Modes and Effects Testing (FMET) Report
F099 AFLCMC/WLJ DI-ILSS-80095/T SOW Para 1.3.10.l
Integrated Logistics Support Plan
17of8Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
ILSP
F100 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.3.10.g
Management Plan
Maintenance Inspection Program Plan
F101 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.3.10.f
Technical Report-Study/Services
Optimized Maintenance Program Report
F102 AFLCMC/WLJ DI-IPSC-81431A BLK16
System/Subsystem Specification (SSS)
BLK 16
F103 AFLCMC/WLJ DI-ILSS-80134A/T SOW Para 1.11.a
Proposed Spare Parts List
F104 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.8.b
Technical Report-Study/Services
Standard/Modified Hand Tools List
F105 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.7.a, 1.8.a.
Technical Report-Study/Services
Support Equipment List
F106 AFLCMC/WLJ DI-SESS-81521B/T SOW Para 1.5.b
Training Program Structure Document
Training Program Plan
F107 AFLCMC/WLJ DI-SESS-81639 SOW Para 1.3.10.m
Warranty Performance Report
F108 AFLCMC/WLJ DI-EMCS-80201C SOW Para 1.1.9.h
Electromagnetic Interference Test Procedures (EMITP)
F109 AFLCMC/WLJ DI-EMCS-80200C SOW Para 1.1.9.i
Electromagnetic Interference Test Report (EMITR)
EMI/EMC Test Reports
F110 AFLCMC/WLJ DI-NDTI-80566A/T SOW Para 1.4.6.e
Test Plan
Master Test Plan (MTP)
F111 AFLCMC/WLJ DI-QCIC-81536 SOW Para 1.4.6.g
Test Information Sheets (TIS)
17of9Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
F112 AFLCMC/WLJ DI-NDTI-80809B SOW Para 1.4.1.b, 1.4.6.h
Test/Inspection Report
Test Report
F113 AFLCMC/WLJ DI-NDTI-80603A SOW Para 1.4.1.d, 1.4.6.f
Test Procedure
F114 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.8.l
Technical Report – Study/Services
Fault Tree Analysis (FTA) Report
F115 AFLCMC/WLJ OT-16-30027 SOW Para 1.2.7.1.c
Hazard Tracking System (HTS) Database
HTS Database
F116 AFLCMC/WLJ DI-MGMT-80004A/T SOW Para 1.2.7.1.h
Management Plan
Crisis Management Team (CMT) Mitigation Plan
F117 AFLCMC/WLJ DI-SAFT-81626/T SOW Para 1.2.7.1.m
System Safety Program Plan (SSPP)
BLK16
F118 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.3.10.h
Technical Report–Study/Services
Aircraft Quick Turn Workflow Report
F119 AFLCMC/WLJ DI-MCCR-80700/T SOW Para 1.2.10.3.a
Computer Software Product End Items
BLK 16
F120 AFLCMC/WLJ DI-MISC-80508B/T SOW Para 1.2.7.1.o
Technical Report–Study/Services
Test Hazard Analysis Worksheet (THAW)
F121 AFLCMC/WLJ DI-EMCS-81540B SOW Para 1.1.9.e
Electromagnetic Environmental Effects (E3) Integration & Analysis Report (E3IAR)
F122 AFLCMC/WLJ DI-MGMT-81803/T SOW Para 1.2.1.l
Item Unique Identification (IUID) Marking Plan
PAR IUID Marking Plan
F123 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.3.8.a
Technical Report-Study/Services
17of10Page
CDRL Table of Contents9/9/2016 1:04:08 PM CDT
FA8625-16-C-6599
Affordability Report
F124 AFLCMC/WLJ DI-MISC-80508B SOW Para 1.2.10.3.a
Technical Report-Study/Services
Frequency Allocation Report
F125 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.4.1.b
Test Plan
PAR Aircraft Avionics Functional Test Plan
F126 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.4.3.a
Test Plan
BLK16
F127 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.4.15.a
Test Plan
BLK16
F128 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.4.15.d
Test Plan
BLK16
F129 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.4.13.2.m
Test Plan
BLK16
F130 AFLCMC/WLJ DI-NDTI-80566A SOW Para 1.1.9.b
Test Plan
Air Vehicle Subsystem Functional Test Plan
F131 AFLCMC/WLJ DI-NDTI-80603A SOW Para 1.1.9.c
Test Procedure
Air Vehicle Subsystem Functional Test Procedures
F132 AFLCMC/WLJ DI-NDTI-80809B SOW Para 1.1.9.d
Test Report
Air Vehicle Subsystem Functional Test Report
F133 AFLCMC/WLJ…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .