Exhb_A_Contract_Data_Requirements_List.pdf
PDF 2 MB Posted
- Attached to
- T-1A Ground Based Training System (GBTS)
- Solicitation number
- FA8621-15-R-6315
About this file
CDRLs
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T-1A GBTS_18 Mar 15
FA8621-15-R-6315
CONTRACT DATA REQUIREMENTS LIST
(CDRL)
GENERAL INSTRUCTIONS
FOR THE
T-1A Ground Based Training System
DATED: 18 March 2015
RFP NUMBER: FA8621-15-R-6315
PREPARED BY:
AFLCMC/WNSS, AGILE COMBAT SUPPORT DIRECTORATE
SIMULATOR DIVISION
(AFLCMC/WNSS)
WRIGHT-PATTERSON AIR FORCE BASE, OHIO 45433-7249
1. CDRL MODIFICATION MATRIX.
This matrix identifies the CDRL changes as implemented by contract modification.
PROPOSAL NO. CDRL REV NO. DATE CDRL/PAGES REVISED
Contract Award Basic
TABLE OF CONTENTS
PARAGRAPH TITLE
1 Applicable Documents
2 Reference Documents
3 Data Deliveries
3.1 Delivery Dates
3.2 Tailored Data Items
3.3 Approval of Data
3.4 Re-submittal of Data
3.5 Final Submittal of Data
3.6 DD Form 250 Requirements
3.7 Classified Data
4.0 Electronic Data Transmission
5.0 Letters Of Transmittal
6.0 Modification Of Data Requirements
7.0 Common Abbreviations
8.0 Marking Documentation
8.1 Distribution Marking System
8.2 Marking Technical Data
8.3 Distribution Statements
8.4 Controlling Office
8.5 Export Controlled Warning Statement
8.6 Destruction Notice
9.0 Mailing List
1.0 Applicable Documents
Data Item Descriptions (DIDs)/DD Form 1664s, are identified in Block 5 of the individual
Contract Data Requirements List (CDRL)/DD Form 1423. All DIDs s are available to the contractor at the following website: http//quicksearch.dla.mil/
2.0 Reference Documents
DoD Manual 5200.01 Vol 1- 4 Information Security Program
DoD 5230.24 Distribution Statements on Technical Documents
DoD 5230.25 Unclassified Technical Data Disclosure
DoD 5010.12-M Procedures for the Acquisition and Management of
Technical Data
3.0 Data Deliveries
The CDRL establishes the data to be delivered by the contractor. The CDRL also identifies the submittal, inspection, approval, acceptance, and distribution requirements of all the CDRL data items contained herein.
3.1 Delivery Dates
In the event a CDRL delivery date falls on a Saturday or Sunday, the delivery will be made by
Friday to be counted as an on-time delivery. Unless otherwise specified in Block 16 of the
CDRL, all references to “days” will refer to working days.
3.2 Tailored Data Items
Tailoring instructions are as described in Block 16 of each affected CDRL. If the data preparation instructions contained in Block 16 of the CDRL are different than the instructions contained in Block 10 of the DID, the CDRL shall govern.
3.3 Approval of Data
a. An "A" designator in Block 8 of the CDRL indicates the Government will formally reply to each data submittal with an approval, approval with comments, or disapproval. The
Government will respond by issuing a Contracting Officer (CO) letter or e-mail to the contractor within 45 working days, unless otherwise specified on the CDRL, Block 16.
This does not apply to Engineering Change Proposals (ECPs) and Contract Change
Proposals (CCPs).
b. For those CDRLs with an "N/A" in Block 8, Government approval of the content is not required; however compliance with data item format and content requirements as specified in Block 10 of the DID, and as tailored in Block 16 of the CDRL, is mandatory.
However, the government will not provide a formal response back to the contractor. The
Government has the right to disapprove any data submittal(s) not in compliance with contract requirements.
https://cs4.eis.afmc.af.mil/sites/1565/T1/SiteCollectionDocuments/Source%20Selection%202014/CDRL/http/quicksearch.dla.mil
3.4 Re-submittal of Data
If re-submittal of a CDRL is required, it shall be resubmitted within 30 working days after CO notification, unless otherwise specified. Should the contractor disagree with the re-submittal requirements, they shall submit their comments to the CO within 30 working days of notification. Each page of a re-submittal shall have changes indicated by a vertical line down the outer right margin designating those areas that have been revised. The document revision shall be indicated on the title page of the data item, each page, and a summary of document changes section contained within the document.
3.5 Final Submittal of Data
a. For the final delivery of each data item in the contract/delivery order, the contractor shall clearly state in the Letter of Transmittal (LoT), as defined in paragraph 5.0, when it is the last submittal being made, and that all contractual requirements concerning that data item have been fulfilled.
b. When the final delivery on a CDRL has been made, Block 16 the CDRL shall be modified to state this. The revised CDRLs will be incorporated into the contract via a modification.
3.6 DD Form 250 Requirements
Block 7 of the CDRL directs the method of submittal - individual DD Form 250s are required only if indicated in Block 7. All other submittals shall be via a letter of transmittal.
3.7 Classified Data
Classified data shall be submitted in accordance with the requirements established by the DD
Form 254. The contractor shall contact the CO for the mailing addresses for classified data.
4.0 Electronic Data Transmission
a. The contractor shall submit all data deliverables in accordance with the specific submittal instructions indicated in Block 16 of each CDRL. The versions of the software used shall remain compatible with current program office software. Any submittals by other means shall require program office approval prior to delivery of data. Data to be submitted by electronic data transmission (EDT) shall be identified in “Block 14.b Repro” of the
CDRL.
b. Electronic Delivery includes delivery/availability of data files via Government-approved website, web page, and server or via attachment of electronic files, as mutually agreed to between the Government and the contractor. Electronic data delivery and access is subject to Government protection/security requirements.
c. The contractor shall inform the program office if any of their data deliverables cannot comply with the required electronic formats. In such cases the contractor shall recommend, for program office approval, an alternative delivery format(s).
d. Financial information provided in excel spreadsheets should be able to be manipulated.
5.0 Letters Of Transmittal (LOT)
All data deliveries shall include a LOT. The LOT may be in the form of a letter or e-mail from the designated contractor representative. As a minimum, the LOT shall contain:
Contractor’s POC
Contractor’s address
Date
Contract number and program name
Letter control number
Document control number
Document revision level
Document date
CDRL sequence number
DID Number
Data Title/Subtitle
Reason/Frequency of submittal (monthly, draft, final, update, etc.)
List of Distribution addressees as identified in Block 14 of the CDRL
Any additional information which may aid in the processing of the submittal.
a. If a paper copy of the LOT is prepared, a complete list of addressees shall be placed at the end of the LOT, annotating the recipients (as identified on the DD Forms 1423, Block
14) including the transmittal-letter-only recipients.
b. If submittal is made via e-mail, the list of addressees in the “TO” line shall include the complete list of addressees and shall be considered sufficient.
6. Modification To Data Requirements
a. During the performance of this contract, the CO may unilaterally increase or decrease the number of addressees and/or number of copies the technical office required; or may make other administrative or clarification changes to the CDRL.
b. The amendment shall be at no change in contract price provided the increase for an individual line item of data is not greater than 150% nor a decrease of less than 50% in the total number of copies initially specified in the CDRL. In the event of an increase greater than 150% or of a decrease greater than 50%, the parties will negotiate any equitable adjustment in accordance with the procedures of the “Changes” clause.
c. The CO may unilaterally make other administrative and/or clarification changes to the
CDRLs. The contract price will constitute full satisfaction of any entitlement of equitable adjustment under the “Changes” clause provided the Contractor agrees to accept such change at no change in contract price. Unilateral action shall be by the issuance of a CO's letter, which will reference this paragraph as its authority. The
Contractor shall notify the CO of the estimated cost if the changes impact the contract price.
7.0 Common Abbreviations
Block 7: LT Letter of Transmittal
Block 8: A Approval
N/A Approval Not Required
16 See Block 16 for further instructions
Blocks 10, 12 & 13: ANNLY Annually
ASREQ As Required
BLK 16 See Block 16
MTHLY Monthly
ONE/P One time preliminary draft
ONE/R Once with Revisions
OTIME One Time
QRTLY Quarterly
R/ASR Revisions as Required
8.0 Marking Technical Documentation
8.1 Distribution Marking System:
a. In accordance with Section 1.30 of Title 10, “United States Code” a DoD distribution marking system for technical data has been established by DoD Directive 5230.24, “Distribution Statements on Technical Documents,” 18 March 1987. The intent of the system is to stem the flow of military-related technical data to our adversaries, without inhibiting technological growth or blocking the exchange of technical data that is vital to progress and innovation. The contractor shall mark all distribution statements and export-control statements, supplemental to any security markings, on all technical data to denote the extent of its availability for secondary distribution, release, and disclosure without need for additional approvals and authorizations from the controlling DoD office.
b. Distribution statements have been annotated in Block 9 of each CDRL and defined in the following paragraph 8.2. If the contractor feels that a different statement is required, he must notify the contracting officer with the recommended statement. The Government will review the request and determine which statement is the most appropriate and provide the contractor with an acceptance of the change or reason for not accepting the contractor’s request for change.
8.2. Marking Technical Data
a. The contractor shall mark all requested technical information, regardless of its medium, with a distribution statement. This includes technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, viewgraphs, film, technical papers, photographs, etc. If the document contains export-controlled technical data, it also must be marked with an export control warning statement.
Distribution statements can be applied to technical data that contain or reveal proprietary information used.
b. Technical data categorized as cryptographic/communications security, communications/electronic intelligence, and similar categories as may be designated by the Director, National Security Agency, whose distribution is limited through alternate methods, are exempt from these marking provisions.
c. Certain types of technical data preclude placing the entire notice on the document. To accommodate this problem, each distribution statement contains an authorized abbreviation form. Abbreviated distribution statements are to be used only when space precludes placing the entire notice on the document. The use and wording of these statements are described in the following paragraphs.
8.3. Distribution Statements
The following statement, IAW Block 9 of the CDRL, regarding distribution must appear on the cover and title page of each document submitted, including the first sheet of each drawing.
The abbreviated form is: “Statement B, US Government, AFLCMC/WNSS, WPAFB, OH.”
The abbreviated form is: “Statement D, Gov’t and contractors, AFLCMC/WNSS, WPAFB, OH”
DISTRIBUTION STATEMENT B
DISTRIBUTION AUTHORIZED TO US GOVERNMENT AGENCIES ONLY:
(REASON) (DATE OF DETERMINATION). OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO AGILE COMBAT SUPPORT
DIRECTORATE, SIMULATOR DIVISION (AFLCMC/WNSS), WRIGHT-PATTERSON
AIR FORCE BASE, OHIO 45433-7249
DISTRIBUTION STATEMENT D
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DoD CONTRACTORS ONLY; CRITICAL TECHNOLOGY, CONTRACT AWARD
DATE. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO
AGILE COMBAT SUPPORT DIRECTORATE, SIMULATOR DIVISION
(AFLCMC/WNSS), WRIGHT-PATTERSON AIR FORCE BASE, OHIO 45433-7249
8.4 Controlling Office
The following address will be used on all documentation for the “controlling office” for this program:
Agile Combat Support Directorate, Simulator Division (AFLCMC/WNSPC)
Wright-Patterson Air Force Base, Ohio 45433-7249
8.5 Export-Controlled Warning Statement
Besides a distribution statement, the marking system also requires the use of a warning notice on all documents that contain export-controlled technical data. That notice is to be used in conjunction with the distribution statement.
8.6 Destruction Notice
DESTRUCTION NOTICE - For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
9.0 Mailing Lists
The Government will provide the following information for each recipient identified in
Block 14: Office symbol, mailing address, point of contact, e-mail and phone number will be updated and provided at contract award.
AFLCMC/WNSS 2300 D Street
WPAFB, OH 45433-7249
rodolfo.alejandro@us.af.mil
AFLCMC/WNSE 2300 D Street cynthia.boone.2@us.af.mil
AFLCMC/WNSE 2300 D Street michael.lawson.9@us.af.mil
AFLCMC/WNSK 2300 D Street
"WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE
EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT
(TITLE 22, U.S.C., SEC 2751 ET SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C. APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT
TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE
WITH THE PROVISIONS OF DoD 5230.25.
mailto:rodolfo.alejandro@us.af.mil mailto:cynthia.boone.2@us.af.mil kerisha.wordlaw.1@us.af.mil jessie.auld@us.af.mil
AFLCMC/WNSF 2300 D Street elizabeth.staggs@us.af.mil
AFLCMC/WNSL 2300 D Street
Michelle.brown.9@us.af.mil
ACO Keith Eggers
DCMA Dayton – ACAD
1725 Van Patton Drive, Area A, Bldg. 30
Wright Patterson, AFB 45433-5302 keith.eggers@dcma.mil
HQ AETC/A3FP 1 F Street, Suite 2
Randolph AFB, TX 78150-4325 frank.yannuzzi.1@us.af.mil mailto:kerisha.wordlaw.1@us.af.mil mailto:jessie.auld@us.af.mil file:///C:/Users/1146141885C/Desktop/word_version_12%20Feb%2015/Michelle.brown.9@us.af.mil mailto:keith.eggers@dcma.mil mailto:frank.yannuzzi.1@us.af.mil
T-1A GBTS_18 March 15
G R I T S
CDRL TABLE OF CONTENTS
SET NAME: T-1A GBTS RECOMPETE
CONTRACT NO: FA8621-15-R-6315
PROGRAM ID: T-1A GBTS
CONTRACTOR: TBD
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
A001 AFLCMC/WNSS DI-MGMT-80227/T
CONTRACTOR'S PROGRESS, STATUS AND
MANAGEMENT REPORT
PWS 3.1.3, 3.2.11,
3.3.15
A002 AFLCMC/WNSL DI-MGMT-80269/T
STATUS OF GOVERNMENT FURNISHED EQUIPMENT
(GFE) REPORT
PWS 3.3.13, 3.3.13.2,
3.3.13.7, 3.5.3, 6.5
A003 AFLCMC/WNSS DI-MGMT-81861/T
INTEGRATED PROGRAM MANAGEMENT REPORT
IPMR
PWS 3.1.14, 3.3.6
A004 AFLCMC/WNSS DI-MGMT-80004A
MANAGEMENT PLAN
PWS 3.1
A005 AFLCMC/WNSS DI-ADMN-81249A
CONFERENCE AGENDA
PWS 3.1.2.1
A006 AFLCMC/WNSS DI-ADMN-81250A
CONFERENCE MINUTES
PWS 3.1.2.1, 3.1.2.2,
3.1.2.3 3.1.13.1, 3.3.13.6
A007 AFLCMC/WNSF DI-MGMT-81468/T
CONTRACT FUNDS STATUS REPORT (CFSR)
PWS 3.1.4
A008 AFLCMC/WNSF DI-FNCL-81831/T
CONTRACTOR SUSTAINMENT REPORT (DD FORM
1921-4)
PWS 3.1.4
A009 AFLCMC/WNSL DI-MGMT-81749A/T
THE 50/50 REQUIREMENT REPORT
PWS 3.1.5
A010 AFLCMC/WNSE DI-QCIC-81794
QUALITY ASSURANCE PROGRAM PLAN (QAPP)
PWS 3.1.9
A011 AFLCMC/WNSE DI-CMAN-80858B
CONTRACTOR'S CONFIGURATION MANAGEMENT
PLAN
PWS 3.1.12, 3.1.13
A012 AFLCMC/WNSE DI-MGMT-80258A/T
MATERIEL IMPROVEMENT PROJECT REPORT
PWS 3.1.15
A013 AFLCMC/WNSS DI-CMAN-80639C/T
ENGINEERING CHANGE PROPOSAL (ECP)
PWS 3.3.9.1
A014 AFLCMC/WNSS DI-ADMN-81401B/T
CONTRACT CHANGE PROPOSAL (CCP)
PWS 3.3.9.2
T-1A GBTS_18 March 15
G R I T S
CDRL TABLE OF CONTENTS
SET NAME: T-1A GBTS RECOMPETE
CONTRACT NO: FA8621-15-R-6315
PROGRAM ID: T-1A GBTS
CONTRACTOR: TBD
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
A015 AFLCMC/WNSS DI-CMAN-80640C
REQUEST FOR DEVIATION (RFD)
PWS 3.3.9.3
A016 AFLCMC/WNSL DI-TMSS-80527C
COMMERCIAL AND OFF-THE-SHELF MANUAL &
ASSOCIATED
COTS
PWS 3.3.10, 3.3.11
A017 AFLCMC/WNSL DI-MGMT-81804A
ITEM UNIQUE IDENTIFICATION MARKING ACTIVITY &
VERIFICATION REPORT (IUID)
PWS 3.3.12
A018 AFLCMC/WNSE DI-ADMN-80925
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS
PWS 3.3.9, 3.3.16,
3.3.17
A019 AFLCMC/WNSE DI-SESS-81785
SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP)
PWS 3.4
A020 AFLCMC/WNSE DI-NDTI-80566A
TEST PLAN
SYSTEM TEST PLAN
PWS 3.4.1
A021 AFLCMC/WNSE DI-NDTI-80603A/T
TEST PROCEDURES
ACCEPTANCE TEST PROCEDURES (ATPS)
PWS 3.4.1.2
A022 AFLCMC/WNSL DI-MISC-81832
COUNTERFEIT PREVENTION PLAN
PWS 5.1.1
A023 AFLCMC/WNSE DI-NDTI-80809B/T
TEST REPORTS
PWS 3.4.1.2
A024 AFLCMC/WNSE DI-MGMT-81453A/T
DATA ACCESSION LIST/INTERNAL DATA (DAL)
PWS 3.1.12.1, 5.1
T-1A GBTS_18 March 2015
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT
REPORT
4. AUTHORITY(Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
AFLCMC/WNSS
DI-MGMT-80227/T PWS 3.1.3, 3.2.11, 3.3.15
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. Date of First Submission
14. DISTRIBUTION
LT D BLK16 BLK16
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE 13. Date of Subsequent Submission: BLK 16
Final Draft Reg Repro
16. REMARKS AFLCMC/WNSS 0 1
Block 4: Tailoring of this DID is as follows:
AFLCMC/WNSE 0 1
AETC/A3FP 0 1
Delete - Paragraphs 10.3.f - 10.3.i
Blocks 10, 12 and 13:
The contractor shall deliver this report initially (10) ten days after the first complete month of the contract.
Subsequent submittals shall be due (10)ten days after the last day of each month.
15. TOTAL 0 0 3
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015 Configuration/Data Mgr Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A002 STATUS OF GOVERNMENT FURNISHED EQUIPMENT (GFE)
REPORT
AFLCMC/WNSL
DI-MGMT-80269/T PWS 3.3.13, 3.3.13.2, 3.3.13.7,
3.5.3, 6.5
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. Date of First Submission
14. DISTRIBUTION
N/A
11. AS OF DATE 13. Date of Subsequent Submission: BLK16
Final Draft Reg Repro
16. REMARKS AFLCMC/WNSL 0 1
Block 4: Delete paragraphs 10.2.6 - 10.2.8.
AFLCMC/WNSS 0 1
AFLCMC/WNSK 0 1
Blocks 10, 12 & 13: The contractor shall deliver this report AFLCMC/WNSE 0 1 initially (10) days after the first complete month of the contract. Subsequent submittals shall be due (7) seven days after the last day of each month.
15. TOTAL 0 0 4
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
IPMR A003 INTEGRATED PROGRAM MANAGEMENT REPORT
DI-MGMT-81861/T PWS 3.1.14, 3.3.6
14. DISTRIBUTION
8. APP CODE 11. AS OF DATE 13. Date of Subsequent
Submission: BLK 16 Final Draft Reg Repro
16. REMARKS AFLCMC/WNSS 0 0 1
AFLCMC/WNSE 0 0 1
Block 4: This data item is tailored as follows:
HQ AETC/A3FP 0 0 1
Paragraphs: 1.0 through 3.6.11.4 "delete"
Paragraphs: 3.7.1.3.4.1-3.7.1.3.4.3 "delete"
Paragraphs: 3.7.1.3.7-3.8.5 "delete"
a. The contractor shall submit the initial transition planning
Integrated Master Schedule (IMS) fifteen (15) days after contract award.
b. The contractor shall submit an IMS with any proposed
ECP/CCP.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A004 MANAGEMENT PLAN
DI-MGMT-80004A PWS 3.1
14. DISTRIBUTION
A
11. AS OF DATE 13. Date of Subsequent Submission: BLK 16
Final Draft Reg Repro
a. The submittal shall be sixty (60) days after contract award.
b. If no changes have occurred during the year, a letter of transmittal stating such shall suffice.
15. TOTAL 0 0 2
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ADMN
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A005 CONFERENCE AGENDA
DI-ADMN-81249A PWS 3.1.2.1
14. DISTRIBUTION
N/A
11. AS OF DATE 13. Date of Subsequent Submission: BLK 16
Final Draft Reg Repro
16. REMARKS AFLCMC/WNSS 0 0 1
Blocks 10, 12, 13: The contractor shall deliver agenda NLT AFLCMC/WNSE 0 0 1 then (10) days prior to Program Management Reviews HQ AETC/A3FP 0 0 1
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ADMN
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A006 CONFERENCE MINUTES
DI-ADMN-81250A PWS 3.1.2.1, 3.1.2.2, 3.1.2.3
3.1.13.1, 3.3.13.6
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. Date of First Submission
14. DISTRIBUTION
A
11. AS OF DATE
BLK 16
13. Date of Subsequent Submission:
Final Draft Reg Repro
Blocks 10, 11 and 12:
HQ AETC/A3FP 0 0 1
a. The contractor shall prepare and submit minutes for each conference, meeting, review and/or audit.
b. Minutes shall be drafted at each conference, meeting, review and/or audit by the contractor and signed by the cognizant Government and contractor managers at the end of each meeting.
c. Minutes shall be used to accurately reflect discussion only and shall not be construed as contractual direction if information deviates from contractual requirements. In the event discussion prompts changes in requirements, a CCP or ECP will be requested.
d. The contractor shall deliver the formal submittal of the minutes NLT then ten (10) days after each conference, meeting, review and/or audit.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A007 CONTRACT FUNDS STATUS REPORT (CFSR)
AFLCMC/WNSF
DI-MGMT-81468/T PWS 3.1.4
14. DISTRIBUTION
LT D QRTLY BLK 16
A
11. AS OF DATE
BLK16
13. Date of Subsequent Submission:
Final
16. REMARKS AFLCMC/WNSF 0 1
Block 4: This data item is tailored as follows:
AFLCMC/WNSK 0 1
The CFSR shall cover funding for all FFP CLINs. On the report, separate lines shall be shown for each FFP CLIN.
Block 11: As of close of each calendar quarter.
Block 12: Twenty-five (25) days after the first full calendar quarter following contract award.
15. TOTAL 0 0 4
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER FNCL
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A008 CONTRACTOR SUSTAINMENT REPORT (DD FORM 1921-4)
AFLCMC/WNSF
DI-FNCL-81831/T PWS 3.1.4
14. DISTRIBUTION
LT D QRTLY BLK16
A
11. AS OF DATE
BLK16
13. Date of Subsequent Submission: QRTLY
Final Draft Reg Repro
16. REMARKS AFLCMC/WNSF 1 1
Block 4:
A reconciliation of the Contractor Sustainment Report (CSR) and AFLCMC/WNSK 0 1
Contract Funds Status Report (CFSR)(DI-MGMT-81468) items, as DCARC (Blk 16) referenced in the attached, is required as an attachment to the
DD Form 1921-4.
Prepare CSR submission in accordance with CLIN-PWS Cross
Reference Matrix, attachment to CDRL A008.
Block 11: As of the close of each calendar quarter.
Block 12: The contractor shall submit the first report twenty-five (25) days after the first full calendar quarter following contract award.
Block 14: All CSR related forms must be electronically forwarded to the Central Repository at the DCARC Web Site at:
http://dcarc.pae.osd.mil/.
15. TOTAL 0 1 4
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
Attachment A008
CSR CFSR Delta Explanation (Delta)
Contract Block 7a Block 1
Report Period End Date Block 8b Block 6
Appropriation Block 21 Block 4
Cost Incurred to Date Column C Row 78
Block 12b
(ACTUAL TO
DATE) 0.00
Actual costs should match, unless estimated fee or profit earned added to CFSR
Cost Incurred at Completion Column F
Row 78
Block 13
(AT
COMPLETION) 0.00
Actual costs should match, unless estimated fee or profit earned added to CFSR
CSR to CFSR Reconciliation
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A009 THE 50/50 REQUIREMENT REPORT
DI-MGMT-81749A/T PWS 3.1.5
14. DISTRIBUTION
LT D ANNLY BLK16
N/A
11. AS OF DATE 13. Date of Subsequent Submission: ANNLY
Final Draft Reg Repro
Subject DID is tailored as follows:
Paragraphs 3.2.2, 3.2.3 and 3.2.5 through 3.2.5.2 Delete
Paragraphs 3.3.1.1 through 3.3.1.3; 3.3.1.6, 3.3.1.10, 3.3.1.13, 3.3.1.14, 3.3.1.15 and 3.3.2.1 through 3.3.2.3
Delete
Blocks 12 and 13:
a. Prior fiscal year report shall be provided no later than
(NLT) October 20th of each year beginning the first full year following contract award.
b. Out year budget forecast report shall be provided NLT 10th day of the first month after each (1) year option exercise.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A010 QUALITY ASSURANCE PROGRAM PLAN (QAPP)
AFLCMC/WNSE
DI-QCIC-81794 PWS 3.1.9
14. DISTRIBUTION
A
11. AS OF DATE 13. Date of Subsequent Submission: BLK16
Final Draft Reg Repro
16. REMARKS AFLCMC/WNSE 0 1
Blocks 10, 12 & 13:
a. A draft QAPP shall be submitted fifteen (15) days after completion of transition.
b. A final QAPP shall be due NLT thirty (30) days after receipt of Government comments or approval.
c. Revisions shall be as required, or as directed by PCO.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A011 CONTRACTOR'S CONFIGURATION MANAGEMENT PLAN
DI-CMAN-80858B PWS 3.1.12, 3.1.13
14. DISTRIBUTION
A
11. AS OF DATE 13. Date of Subsequent Submission: BLK 16
Final Draft Reg Repro
16. REMARKS AFLCMC/WNSE 0 0 1
AFLCMC/WNSS 0 0 1
a. The submittal shall be thirty (30) days after contract award.
b. Subsequent submittals shall be with any update and include any changes/modifications to the contractor's configuration management process.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A012 MATERIEL IMPROVEMENT PROJECT REPORT
DI-MGMT-80258A/T PWS 3.1.15
14. DISTRIBUTION
LT D ASREQ BLK16
A
11. AS OF DATE 13. Date of Subsequent Submission:
Final Draft Reg Repro
a. Contractor format acceptable.
b. Para 10.2.a replace "MIP" with "RCN"
c. Delete Para 10.2.c.
d. Delete Para 10.2.h.
Block 12: The contractor shall submit a final report no later than thirty (30) days after completion of the investigation.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A013 ENGINEERING CHANGE PROPOSAL (ECP)
DI-CMAN-80639C/T PWS 3.3.9.1
14. DISTRIBUTION
A
11. AS OF DATE 13. Date of Subsequent Submission: BLK 16
Final
Block 4: ECPs shall apply to all authenticated/ approved AFLCMC/WNSK 0 2 1 specifications within the contract.
DCMA/ACAD 0 0 1
Approval will be via the Government Configuration Control Board decision/contract modification.
a. The contractor shall prepare and submit an ECP whenever a change to a specification is identified and/or in accordance with a PCO letter.
b. The ECP shall be submitted in two parts as follows:
1. Technical volume
2. Cost volume
15. TOTAL 0 2 4
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ADMN
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A014 CONTRACT CHANGE PROPOSAL (CCP)
DI-ADMN-81401B/T PWS 3.3.9.2
14. DISTRIBUTION
A
11. AS OF DATE 13. Date of Subsequent Submission: BLK 16
Final Draft Reg Repro
Block 4: Use Mil-HDBK 61A as a guide.
AFLCMC/WNSK 0 2 1
a. All CCPs shall include a firm/not-to-exceed price with a time limit specified for expiration of that pricing information.
b. The CCP shall include all data to be affected from the contractual implementation of the proposal: i.e, the CCP shall identify applicable data items by sequence number, DID number and title, or shall include proposed new or revised data items.
Block 8: Government approval will be in the form of a contract modification.
a. The contractor shall prepare and submit a CCP whenever a change to any contractual document is required.
b. Whenever a CCP is requested by the Government, the contractor shall deliver the CCP in accordance with
PCO's direction.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A015 REQUEST FOR DEVIATION (RFD)
DI-CMAN-80640C PWS 3.3.9.3
14. DISTRIBUTION
LT D ASREQ Blk 16
11. AS OF DATE 13. Date of Subsequent Submission: Blk 16
Final
AFLCMC/WNSK 0 2 1
Blk 8: Approval will be via Government Configuration Control AFLCMC/WNSE 0 0 1
Board (CCB) decision and contract modification.
Blks 12 & 13: The deviation shall be submitted in two volumes if required (both volumes to be submitted together):
1. Technical volume
2. Cost volume(if applicable)
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER TMSS
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
COTS A016 COMMERCIAL AND OFF-THE-SHELF MANUAL & ASSOCIATED
DI-TMSS-80527C PWS 3.3.10, 3.3.11
14. DISTRIBUTION
LT D ASREQ Blk 16
A
11. AS OF DATE
N/A
13. Date of Subsequent Submission: Blk 16
Final
Blocks 12 and 13:
a. Deliver the COTS manual concurrent with the delivery of the modification/software upgrade/revision.
b. Revisions as required to keep data current with the equipment.
Block 14:
One copy of the manual shall be delivered to the TSSCs.
Notification shall be provided by email to all the addressees.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A017 ITEM UNIQUE IDENTIFICATION MARKING ACTIVITY &
VERIFICATION REPORT (IUID)
DI-MGMT-81804A PWS 3.3.12
14. DISTRIBUTION
A
11. AS OF DATE 13. Date of Subsequent Submission: N/A
Final Draft Reg Repro
16. REMARKS AFLCMC/WNSL 0 0 1
Block 12:
a. The IUID shall be delivered six (6) months after contract award and updated as required.
b. The contractor shall submit the information in accordance with the procedures and guidelines in MIL-STD-130N.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ADMN
D. SYSTEM/ITEM
T-1A GBTS
E. CONTRACT/PR NO.
FA8621-15-R-6315
A018 REVISIONS TO EXISTING GOVERNMENT DOCUMENTS
DI-ADMN-80925 PWS 3.3.9, 3.3.16, 3.3.17
14. DISTRIBUTION
A
11. AS OF DATE 13. Date of Subsequent Submission: BLK16
Final Draft Reg Repro
a. Delivery shall be 30 days after completion of Government
SVR/PCA.
b. Revisions as required to maintain the systems and TSSC data in a current status for each configuration and location.
* An electronic copy is to be maintained at the TSSCs master library. An email notification shall be sent to the program office addresses whenever any changes occur.
Cindy Boone 3/18/2015 Maj Rudolfo Alejandro 3/18/2015
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .