Section_M.pdf
PDF 254 KB Posted
- Attached to
- MQ-9 UAS Aircrew and Support Services Federal contract opportunity
- Solicitation number
- FA8620-20-C-2001
About this file
This document outlines the evaluation criteria for a solicitation seeking MQ-9 Unmanned Aerial System aircrew and support services. The solicitation will result in a single award contract to the offeror representing the best value based on a tradeoff between past performance and price, with past performance being significantly more important. Technical proposals will be evaluated on a pass/fail basis against factors for program management and transition plans. Past performance will be assessed based on recent and relevant references resulting in a confidence rating. Price proposals will be evaluated for completeness, reasonableness, unbalanced pricing, and total evaluated price. The deadline for past performance submissions is July 22, 2019, with proposals due August 5, 2019. The effort is set aside for small businesses. A pre-award survey may be conducted as part of the evaluation.
Section M
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AOCE-IAMAW_CBA_2017-2020.pdf | ||
| RFP_Cover_Letter_Amend1a.pdf | ||
| Final_Section_L_V_2.4_Amend1.pdf | ||
| RFP_Cover_Letter.pdf | ||
| Contractor_Questions_on_the_Solicitation_for_FA8620-20-C-2001.pdf | ||
| Contractor_Questions_on_the_Solicitation_for_FA8620-20-C-2001.pdf | ||
| Final_Section_L_V_2.4.pdf | ||
| Model_Contract.pdf | ||
| AFLCMC_Det_3_11-100_Flight_Supervision_and_Ops_OI_23_Oct_2017.pdf | ||
| AFLCMC_Det_3_OI_99-103_08_Nov_2017.pdf | ||
| MQ-9_UAS_Aircrew_and_Support_Services.pdf | ||
| Model_Contract_-_FA8620-20-C-2001.pdf | ||
| Section_L.pdf | ||
| AFLCMC_Det_3_OI_99-108_21_July_2015.pdf | ||
| ppi_tool.accdb | MDB file | |
| RFP_Cover_Letter.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8620-20-C-2001
SECTION M
EVALUATION FACTORS FOR AWARD
1 GENERAL
1.1 Basis for Contract Award
This source selection is conducted in accordance with Federal Acquisition Regulation (FAR)
Part 15.3, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition
Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement
(AFFARS), DoD Source Selection Procedures 31 Mar 2016, and Air Force Mandatory
Procedures 5315.3. These regulations are available electronically at the Air Force (AF)
FARSite, http://farsite.hill.af.mil. The Government will select the best overall offer, based upon a tradeoff between Past Performance and Price among those offerors who have been determined to be technically acceptable. Past Performance is significantly more important than Price.
However, price will contribute substantially to the source selection decision.
1.2 Source Selection
A contract may be awarded to the offeror who is deemed responsible in accordance with
FAR Part 9, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation), and who is judged, based on the evaluation factors and subfactors, to represent the best value to the Government. The Government seeks to award to the offeror who gives the Air Force the greatest confidence that it will best meet the requirements.
This may result in an award to a higher rated, higher priced offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the superior past performance of the higher priced, technically acceptable offer outweighs the price difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below).
While the Government source selection team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; therefore, professional judgment is implicit throughout the entire process.
1.3 Number of Contracts to be Awarded
The Government intends to award one contract for the MQ-9 Unmanned Aerial System (UAS)
Aircrew and Support Services.
1.4 Grossly Deficient
The Government may reject any proposal from this competition prior to evaluating the proposal against the Evaluation Factors if an initial assessment of the proposal shows the proposal to be grossly deficient. Grossly deficient proposals are proposals that fail to address essential file:///C:/Users/JeffreyW.Voudren/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/LF8798DU/MP5315.3.doc%23s153 file:///C:/Users/JeffreyW.Voudren/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/LF8798DU/MP5315.3.doc%23s153 requirements of the RFP or fail to furnish information demonstrating compliance with mandatory requirements set forth in the RFP and does not represent a reasonable initial effort by the Offer to address the requirements of the RFP.
1.5 Correction Potential of Proposals
The Government will consider, throughout the evaluation, the "correction potential" of any deficiency. The judgment of such "correction potential" is within the sole discretion of the
Government. If an aspect of an offeror's proposal does not meet the Government's requirements and is not considered correctable, the offeror may be eliminated from the competitive range.
1.6 Discussions
The Government intends to award a contract without discussions. The Government, however, reserves the right to conduct discussions if deemed in its best interest.
If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision
(FPR) will be considered in making the source selection decision. The offeror may update any part of its proposal at the FPR submission. Please note, however, that while any change(s) to the proposal could be deemed improvements and render the proposal more competitive for award, there is also the possibility that the change(s) could be deemed detrimental and render the proposal less competitive for award or even un-awardable.
1.7 Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The
Government reserves the right to determine any such exceptions unacceptable and the proposal, therefore, ineligible for award or determine the exception is acceptable and extend it to all offerors.
2 EVALUATION FACTORS
2.1 Evaluation Factors and Subfactors
The following evaluation factors and subfactors will be used to evaluate each proposal:
Factor 1: Technical
Subfactor 1: Program Management/Staffing Plan
Subfactor 2: Transition Plan
Factor 2: Past Performance
Factor 3: Price
2.2 Technical Factor
The Government’s technical evaluation team shall evaluate the technical proposals on a pass/fail basis, assigning one of the ratings described below for each subfactor. Any subfactor evaluated as “Unacceptable” will render the entire proposal unacceptable and, therefore, ineligible for award. Only those proposals determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. However, the offeror is reminded that the
Government intends to award this effort based on the initial proposal, as received, without discussion. See Table 1 – TECHNICAL RATINGS, below.
The proposals shall be evaluated against the following technical subfactors:
Subfactor 1: Program Management/Staffing Plan
Measure of Merit: This requirement is met when the offeror’s proposed Program Management and staffing plan provides:
a. An organization chart or company narrative which demonstrates a sound organizational construct which facilitates effective lines of authority.
b. A narrative which demonstrates a sound understanding of necessary personnel quantity, skillsets, qualification, & certification needs.
c. A Manning, Skills, Qualifications and Certification (MSQC) Matrix which demonstrates a sound manning approach.
d. A schedule which demonstrates a sound understanding of the concept of operations and required aircrew manning levels to meet aircrew daily and monthly requirements.
Subfactor 2: Transition Plan
Measure of Merit: This requirement is met when:
TABLE 1 - TECHNICAL RATINGS
Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
a. The offeror's Milestone Chart substantiates a sound transition plan to meet the prescribed checkpoints within the 30-day timeline IAW PWS Section 4.3.
b. The offeror's narrative substantiates a sound approach to recruiting/attracting and hiring aircrew and unit-level support personnel requirements within the 30-day transition period.
c. The offeror's Risk Cube and mitigation strategies substantiate a sound understanding of the risks associated with transition.
2.3 Past Performance Factor
The Past Performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements.
2.3.1 Ratings. The Past Performance factor will receive one of the performance confidence assessments described below in Table 2.
TABLE 2 -- Performance Confidence Assessments
Adjectival Rating Description
Substantial Confidence Based on the offeror’s recent/relevant performance record, the
Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the
Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the
Government has no expectation that the offeror will be able to successfully perform the required effort.
2.3.2 Evaluation Process. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. Performance confidence is assessed at the overall Past
Performance factor level after evaluating aspects of the offeror’s recent past performance, focusing on performance that is relevant to the Technical subfactors. The Government may consider past performance in the aggregate in addition to on an individual contract basis. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance proposal volume and information obtained from other sources available to the Government, to include, but not limited to, the Past
Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity
Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers and Fee Determining
Officials; the Defense Contract Management Agency (DCMA), and commercial sources.
2.3.2.1 Recency Assessment
An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past three (3) years from the date of issuance of this solicitation. If the effort began more than 3 years ago, only the effort which occurred during the past 3 years will be considered recent. Past performance information that fails this condition will not be evaluated.
2.3.2.2 Relevancy Assessment
The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the products provided/services performed under those contracts relate to the Technical subfactors. For each recent past performance citation reviewed, the relevance of the work performed will generally be assessed for the Technical subfactors
(however, all aspects of performance that relate to this acquisition may be considered).
Consideration will be given to Remotely Piloted Aircraft (RPA) and Flight Test contract efforts.
A relevancy determination of the offeror’s past performance will be made based upon the aforementioned considerations, including joint venture partner(s) and major and critical subcontractor(s). In determining the relevancy of effort performed under individual past performance contracts, the government will only consider the specific effort or portion consistent with that proposed by the prime, subcontractor or teaming partner. The Past Performance
Questionnaire, Past Performance Volume, and information obtained from other sources will be used to establish the degree of relevancy of past performance. The Government will use the following Table 3 Relevancy Definitions when assessing recent, relevant contracts:
TABLE 3 – Relevancy Definition
Rating Definition
VERY RELEVANT Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
RELEVANT Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
SOMEWHAT RELEVANT Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
2.3.2.3 Performance Quality Assessment
The Government will consider the performance quality (how well the contractor performed on the contracts) of recent, relevant efforts. For each recent past performance citation reviewed, the performance quality of the work performed will be assessed for the Technical subfactors;
however, all aspects of performance that relate to this acquisition may be considered. The quality assessment consists of an in-depth evaluation of all past performance information available.
The quality assessment may result in positive or adverse findings. Adverse is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comment received from sources without a formal rating system. For adverse information identified, the evaluation will consider the number and severity of the problem(s), mitigating circumstances, and the effectiveness of corrective actions that have resulted in sustained improvements. Process changes will only be considered when objectively measurable improvements in performance have been demonstrated.
The Government will use the following quality levels in Table 4 when assessing recent, relevant efforts:
TABLE 4 – Quality Levels
Quality Assessment
Rating/Color
Description
EXCEPTIONAL (E)/BLUE During the contract period, contractor performance is meeting (or met) all contract requirements and consistently exceeding (or exceeded) many. Very few, if any, minor problems encountered. Contractor took immediate and effective corrective action.
VERY GOOD (VG)/PURPLE During the contract period, contractor is meeting (or met) all contract requirements and consistently exceeding (or exceeded) some. Some minor problems encountered.
Contractor took timely corrective action.
SATISFACTORY (S)/GREEN During the contract period, contractor performance is meeting (or met) all contract requirements. For any problems encountered, contractor took effective corrective action.
MARGINAL (M)/YELLOW During the contract period, contractor performance is not meeting (or did not meet) some contract requirements. For problems encountered, corrective action appeared only marginally effective, not effective, or not fully implemented. Customer involvement was required.
UNSATISFACTORY(U)/RED During the contract period, contractor performance is failing (or fail) to meet most contract requirements. Serious problems encountered. Corrective actions were either ineffective or non-existent. Extensive Customer oversight and involvement was required.
NOT APPLICABLE
(N)/WHITE
Unable to provide a rating. Contract did not include performance for this aspect. Do not know.
2.3.3 Assigning Ratings. As a result of the relevancy and performance quality assessments of the recent contracts evaluated, offerors will receive an integrated performance confidence assessment rating. Although the past performance evaluation focuses on performance that is relevant to the Technical subfactors, the resulting performance confidence assessment rating is made at the factor level and represents an overall evaluation of contractor performance. Offerors without a record of recent/relevant past performance or for whom information on past performance is so sparse that no meaningful confidence assessment rating can be reasonably assigned will not be evaluated favorably or unfavorably on past performance and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor.
2.3.3.1 More recent and relevant performance will have a greater impact on the
Performance Confidence Assessment than less recent or relevant effort. Offerors with a strong record of past performance can be considered more highly than one without a record of past performance.
2.4 Price Factor
Price proposals will be evaluated for (1) completeness, (2) reasonableness, (3) unbalanced pricing, and (4) Total Evaluated Price (TEP). Offerors whose price is determined to be incomplete or unreasonable will not be considered for award. Additionally, an offer may be rejected if the contracting officer determines unbalanced pricing poses an unacceptable risk to the Government.
2.4.1 Completeness. The Government will review the pricing submissions for completeness and compliance with Section L of the solicitation.
2.4.2 Reasonableness: The offeror’s Price proposal will be evaluated, using one or more of the techniques defined in FAR 15.404, in order to determine if it is reasonable. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through price competition, but additional analysis techniques as described in FAR 15.404 may be considered.
2.4.3 Unbalanced Pricing: The Government will analyze each proposal to determine whether they are unbalanced with respect to CLIN prices, variable quantity options, and separately priced line items in accordance with FAR 15.404-1.
file://///Periwinkle/SAF_AQC_ORG/AQCP/5640%20-%20AFFARS/AFAC%20Working%20Folders%20--%20PM/far/FAR52.215.doc%23b15404
2.4.4 Total Evaluated Price (TEP): The TEP is the sum of all basic effort CLINs plus all option CLINs. TEP will be evaluated based on attachment 5 of Section L with the exception of cost reimbursable CLINs.
2.4.5 Evaluation of options shall not obligate the Government to exercise such options.
3 PRE-AWARD SURVEY
The Government may conduct a pre-award survey (PAS) as part of this source selection. Results of the PAS (if conducted) will be evaluated to determine each offeror's capacity to meet the requirements of the solicitation.
4 REVIEWS and VISITS
The Source Selection Evaluation Board (SSEB) may conduct site visits during the evaluation phase to gather information for judging the offeror's potential for correcting deficiencies or other areas useful in evaluating the offer. If conducted, the results will be assessed under the applicable factors/subfactors and will be used to validate and confirm the offeror's written proposal.
File details come from the government source that posted it. Updated .