This document contains a federal contract opportunity solicitation for a storage aid system. The solicitation seeks proposals for the performance, design, fabrication, installation, and testing of a Storage Aid System for Building 863 at Minneapolis St. Paul IAP ARS in Minnesota. The work must be completed within 238 days from award. The opportunity is set aside solely for small businesses with 500 employees or fewer. Evaluation will be based on a lowest price technically acceptable basis. Proposals are due by July 18, 2023. The Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is the contracting agency.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8604‐23‐R‐B011
Minneapolis St. Paul IAP ARS, MN Questions/Answers Set 4 Date 20 July 2023
Questions/Responses:
1. Is the handrail depicted in light blue with the gates also depicted in red around the pla orm and short conveyor lane sides of the concrete pad or is it only required on the side with the gates?
The only gates and railing (surrounding the raised slab and GRC) the contractor shall provide per this MMHS contract are the ones identified on AF‐Drawing VMN902‐01 as light blue in color. The contractor is not responsible for the railing (surrounding the raised slab and GRC) identified on AF Drawing VMN902‐01 as red in color.
2. It is assumed the opening width of the gates should be 126” and that the height of the gates should match the handrail at 48”, is this correct?
The opening width of each gate shall be 126”. The height of the gates shall match the 48” railing height detailed in sec on 3.1.10.