Contractor Information.doc
DOC document 41 KB Posted
- Solicitation number
- FA8604-10-R-7932
About this file
Contractor Information
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Status Report.doc | DOC document | |
| DI DRPR 81003.pdf | ||
| DI TMSS 80527.pdf | ||
| Cover PD.docx | DOCX document | |
| Figure 7.dwg | DWG drawing | |
| Appendix B - Bin Shelving.docx | DOCX document | |
| Program Plan.doc | DOC document | |
| DI MGMT 80909 T.pdf | ||
| RFP2.pdf | ||
| IBP Manuals.doc | DOC document | |
| Figure 5.dwg | DWG drawing | |
| Appendix A - Mobile Storage System.docx | DOCX document | |
| Figure 2.dwg | DWG drawing | |
| Figure 3.dwg | DWG drawing | |
| Shop Drawings.doc | DOC document | |
| DI MGMT 80227 T.pdf | ||
| DI TMSS 80528 T.pdf | ||
| Requirements Certification.doc | DOC document | |
| O M Manuals.doc | DOC document | |
| System Checkout Certificate.doc | DOC document | |
| Figure 6.dwg | DWG drawing | |
| As-built Drawings.doc | DOC document | |
| Figure 4.dwg | DWG drawing | |
| Figure 1.dwg | DWG drawing | |
| Figure 8.dwg | DWG drawing |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11 March 2010
CONTRACTOR INFORMATION
1. SERVICES AVAILABLE TO THE CONTRACTOR
A. Work Schedule
Normal Working Hours
Days of the Week
| 1st Shift |
| 0800 |
| to |
| 1700 |
Monday - Friday
2nd Shift to
3rd Shift to
The Contractor is not allowed to work holidays or other than the normal work schedule unless approved in advance by the base project officer.
B. Office space available?
| Yes |
| X |
| No |
C. Classroom space available?
(For number required to be trained)
| Yes |
| X |
| No |
| D. Staging space available? |
| X |
| Yes |
No
(1) Inside square feet:
1,000
Clear height:
12 feet
Location:
Work area
Secured area?
| Yes |
| X |
| No |
E. Rail siding available?
| Yes |
| X |
| No |
| F. Restrooms available? |
| X |
| Yes |
No
Building number:
Same bldg
G. Utilities available:
(1) Electrical outlets available in area?
| X |
| Yes |
No
Voltage:
| 110 |
| Hertz: |
| 60 |
| Phase: |
| single |
(2) Water available?
| X |
| Yes |
No
Location:
Same bldg
2. SERVICES NOT AVAILABLE TO THE CONTRACTOR
A. Forklifts. Government forklifts are not available for the Contractor's use.
B. Tools. Government tools or equipment are not available for the Contractor's use.
C. Loading/unloading. Government personnel will not load or unload any Contractor equipment, tools, and system components shipped under this contract.
3. JOINT OCCUPANCY
The Contractor will be installing the equipment in close proximity to normal Air Force operations. The Contractor must minimize interference with base personnel.
4. SITE VISIT
To acquaint bidders/offerers with this project, arrangements may be made to visit the site by contacting:
| Name: |
| MSgt Andy Davis |
| E-mail: |
| Todd.davis.1@ang.af.mil |
| Telephone |
| 307-772-6026 |
Contractor Information.doc
File details come from the government source that posted it. Updated .