QuestionsandAnswers-FA860126Q0066.pdf
PDF 290 KB Posted
- Attached to
- F10295 CONSOLE FURNITURE
- Solicitation number
- FA860126Q0066
About this file
This is a Questions and Answers document issued by the Air Force Life Cycle Management Center (AFLCMC) in response to inquiries regarding solicitation FA8601-26-Q-0066 for F10295 Console Furniture. The document does not address specific products or services requirements but rather clarifies ambiguities in the solicitation documents.
Key clarifications provided include: the console requires sit/stand capabilities with specifications detailed in the console drawings; the system will include 9 CPUs and monitor specifications referenced in the Statement of Work (SOW) page 9, line items 17 and 18; the project is funded with an installation timeline outlined in SOW section 7.3; Cybersecurity Maturity Model Certification (CMMC) Level 1 is required; offerors must budget for 90 days of storage with no offsite storage requirement; the manufacturing facility requirement can be satisfied through the proposed furniture manufacturer with supporting documentation; electrical connections to building power will be performed by others and are not included in contract scope; and the offer due date is 22 June 2026 at 11:00am Eastern Daylight Time (EDT). The document was issued on 10 June 2026 by Contracting Officer Candice Snow of AFLCMC/PZIBA.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
WRIGHT-PATTERSON AIR FORCE BASE OHIO
One AFMC…Powering the World’s Greatest Air Force
10 June 2026
FROM: AFLCMC/PZIBA
2275 D Street Building 16, Area B Wright-Patterson AFB OH 45433
SUBJECT: Response to Inquiries regarding FA8601-26-Q-0066, F10295 Console Furniture
Questions & Answers
1. Will the console require sit/stand capabilities.
Answer: Yes, please refer to attachment 05b-F10295 Console Drawings.
2. How many monitors and CPUs will be on the console?
Answer: Please refer to the SOW page 9 line items 17 & 18, 9 CPUs refer to attachment 05b-F10295 Console Drawings page 4 Item #9.
3. Is this project funded?
Answer: Yes
4. What is your project timeline for estimated installation?
Answer: Please refer to the SOW section on 7.3.
5. DFARS 252.204-7025 and the related CMMC contract clause in the solicitation appear to contain a blank for the required CMMC level. Please confirm the specific CMMC level required for this acquisition.
Answer: Level 1
6. The SOW references both 90 days of storage and a maximum of 30 days of offsite storage. Please confirm the storage duration that offerors must include in their firm-fixed pricing.
Answer: 90 days storage, see attached revised SOW for Sections 2.1.21 and 2.4.5.
7. The SOW States that the vendor shall have a full manufacturing facility and shall have been manufacturing products for at least 15 years. Please confirm whether an offeror may satisfy this requirement through the proposed furniture manufacturer and/or authorized installation partner, provided full supporting documentation is submitted with the quotation.
Answer: This requirement can be satisfied through the proposed furniture manufacturer by providing documentation submitted with the quotation.
8. Please confirm whether electrical connection of systems furniture power to building power is required under this contract, or whether building-side conduit and wiring will be performed by others as indicated in the console drawings.
Answer: Electrical work is not required under this contract and will be performed by others as stated in the console drawings.
9. Please confirm whether the offer due date of 22 June 2026 at 11:00am is intended to be Eastern Daylight Time (EDT).
Answer: Due date is 11:00am Eastern Daylight Time (EDT).
CANDICE SNOW
AFLCMC/PZIBA, Contracting Officer
| 2026-06-10T09:07:28-0400 | |
| SNOW.CANDICE.LYNN.1423542060 |
File details come from the government source that posted it. Updated .