Solicitation Questions and Answers 15 APR.pdf
PDF 330 KB Posted
- Attached to
- Outdoor Static Model Display Refurbishment
- Solicitation number
- FA860126Q0023
About this file
This is a Questions and Answers (Q&A) document issued by the Air Force Life Cycle Management Center (AFLCMC) at Wright-Patterson Air Force Base in response to inquiries regarding Combined Synopsis/Solicitation FA8601-26-Q-0023 for the refurbishment of outdoor static model aircraft displays.
The procurement involves the removal, refurbishment, and reinstallation of six display models located at Buildings 553 and 556. The contractor is responsible for all removal and reinstallation activities, including removal of models from concrete bases (which remain in place), transport, storage, and reinstallation of refurbished models and pedestals. The displays are fixed single units constructed primarily of fiberglass with wood components; weights are unknown. Models have been in their original condition for approximately 25 years. The contractor must perform surface preparation, structural reinforcement of damaged or failing components, corrosion identification and repair, complete repainting where damage is widespread, accurate reproduction of all original markings and insignia, and identification of correct paint codes and camouflage patterns through independent research. Support poles and mounting structures are excluded from the scope. The contractor must provide secure storage throughout the refurbishment process and submit progress photos in high-resolution JPEG or PDF format. Final acceptance will be determined by the Contracting Officer through visual inspection verifying compliance with Performance Work Statement requirements, with a two-year warranty against peeling, cracking, or significant fading. Optional site visits were scheduled for April 2 and April 15, 2026, with the solicitation response deadline extended to April 22, 2026 at 3:00 PM Eastern Time.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFLCMC) WRIGHT-
PATTERSON AIR FORCE BASE OHIO
15 April 2026
SUBJECT: Response to Inquiries regarding Combined Synopsis/Solicitation
FA8601-26-Q-0023, Outdoor Static Model Display
QUESTIONS AND ANSWERS
1. QUESTION: Is this a brand new contract or is/was there an incumbent performing these services? If not brand new, please provide the current / previous contract number.
ANSWER: This is a new requirement and as such, there is no previous contract number to provide.
2. QUESTION: Request for a site visit to better evaluate current conditions of the static model displays.
ANSWER: An optional Site Visit will be held on Thursday, 02 April 2026 at 8:00AM Eastern Time (ET). If you plan on attending, please submit the following information to both amanda.hoyng@us.af.mil and tracy.ferrise@us.af.mil not later than (NLT) Tuesday, 31 March 2026 at 3:00 PM ET:
1. Full name as it appears on your driver’s license
2. Driver’s license number
3. Email address
3. QUESTION: Transport / Logistics: Can the Government provide approximate dimensions, weights, and construction materials for each of the six (6) display models?
ANSWER: The Government can provide rough dimensions, but not able to identify weight while anchored to concrete base. Bidders are strongly encouraged to attend the site visit to verify measurements and conditions firsthand
4. QUESTION: Transport / Logistics: Is the contractor responsible for removal and reinstallation of the display models, including any foundations, anchoring systems, or structural supports?
ANSWER: Yes
5. QUESTION: Transport / Logistics: Are the display models able to be disassembled for transport (e.g., wings, tail sections), or are they fixed as single units?
mailto:amanda.hoyng@us.af.mil mailto:tracy.ferrise@us.af.mil
ANSWER: Fixed as a single unit
6. QUESTION: Transport / Logistics: Are the bases permanently attached to the models, or are they separate structures? If separate, should the bases remain in place or be removed and refurbished as part of this effort?
ANSWER: The display models are mounted on a concrete base with mounted pedestal. The concrete base shall remain in place. The models/pedestals will be removed from the concrete base for refurbishment and reinstalled upon completion
7. QUESTION: Transport / Logistics: Are the support poles or mounting structures included in the scope of work for surface preparation and coating?
ANSWER: No, Contractor will be responsible to remove and reinstall to concrete base. “poles are not in the scope of work for this project”
8. QUESTION: Transport / Logistics: Are there any known access limitations, rigging constraints, or lifting requirements at Buildings 553 and 556?
ANSWER: None known at this time. The contractor is responsible for assessing site conditions and providing all necessary rigging, lifting, and transportation means.
9. QUESTION: Scope / Repairs: Can the Government clarify the expected extent of “structural reinforcement” and “corrosion repair”? Should this be interpreted as minor cosmetic repair?
ANSWER: Structural reinforcement includes restoring failing or damaged components to restore structural integrity, such as (fallen tailwing). Corrosion repair goes beyond minor cosmetic fixes and includes identification, removal of corrosion, treatment, and repair of affected areas to ensure long-term durability in an outdoor environment
10. QUESTION: Scope / Repairs: How should latent or previously unidentified damage (e.g., internal corrosion, substrate failure) that is not visually available during inspection be handled? Will these conditions be addressed via modification or change order?
ANSWER: Any latent or hidden damage discovered during performance of the work that could not reasonably have been identified during the pre-bid site inspection must be promptly documented with photos and brought to the attention of the Contracting Officer. Such conditions will be evaluated and addressed, if necessary, through a contract modification or change order.
11. QUESTION: Coatings / Standards: Are there specific coating systems, or MIL-spec requirements that must be followed beyond the referenced standards?
ANSWER: No
12. QUESTION: Coatings / Standards: What level of surface preparation is expected (e.g., full coating removal vs. scuffing, etc.)
ANSWER: The contractor shall perform surface preparation sufficient to ensure proper adhesion and long-term performance of the new coating system under outdoor exposure conditions. This typically includes removal of all loose, peeling, flaking, or defective coatings, cleaning of dirt, grease, chalking, and contaminants, and creation of a suitable surface profile on sound substrates.
Full removal to bare substrate is not required where existing coatings are intact and well-adhered, but all surfaces must meet the performance requirements of the solicitation. Methods may include high-pressure washing, scraping, sanding, power tool cleaning, or other appropriate techniques consistent with industry standards (e.g., SSPC guidelines). A thorough site inspection is recommended to evaluate current coating conditions.
13. QUESTION: Markings / Documentation: Will the Government provide reference drawings or historical documentation for accurate reproduction of markings and insignia?
ANSWER: The Government will not provide comprehensive reference drawings or historical documentation for this purpose. The contractor shall perform its own research, take detailed measurements and photographs during the site visit, and ensure all markings and insignia are accurately replicated in size, color, location, and style consistent with the original configuration of each display model. if vendor is unable to perform its own research, measurements and photographs, customer can inquire with local program offices for assistance Any available basic reference materials (if they exist) may be provided to the awarded contractor, but the contractor must not rely on the Government as the primary source.
14. QUESTION: Markings / Documentation: Does the Government have any existing condition assessments or inspection reports available?
ANSWER: No existing condition assessments or inspection reports are available. Offerors should perform their own independent assessment during the site visit.
15. QUESTION: Execution / Deliverables: Is the contractor expected to provide storage during refurbishment, and are there any specific requirements for storage conditions?
ANSWER: Yes, the contractor is fully responsible for providing secure storage during removal, transport, refurbishment, and until reinstallation.
16. QUESTION: Execution / Deliverables: Are there specific formatting or submission requirements for the progress photo deliverables?
ANSWER: Progress photos shall be submitted in digital format (high-resolution JPEG or PDF) at the intervals specified in the contract.
17. QUESTION: Warranty / Acceptance: What criteria will be used for final acceptance (e.g., visual inspection, adhesion testing)?
ANSWER: Final acceptance will be determined by the Contracting Officer (or designated representative) based on a walk-through inspection verifying compliance with all PWS requirements, including uniform appearance, proper coating application, accurate reproduction of markings/insignia, structural integrity, and overall workmanship. Visual inspection will be the primary method. The work must be free of defects that would affect appearance, durability, or service life (with a two-year warranty against peeling, cracking, or significant fading).
18. QUESTION: Once awarded, would the paint codes to the original displays be given to the contractor?
ANSWER: The contractor is responsible for identifying and sourcing the correct paint codes. This is considered part of the contractor's required due diligence and expertise.
19. QUESTION: If any of the displays are camouflage would the design pattern also be available?
ANSWER: The contractor is responsible for replicating any camouflage patterns. This is considered part of the contractor's required due diligence and expertise.
20. QUESTION: Are these repairs for completely stripping the displays or just repairing in needed areas of the display?
ANSWER: The contractor is responsible for assessing the condition of each display to determine the necessary repairs. Where corrosion, peeling, or damage is widespread, full stripping and refurbishment will be required. The contractor is also responsible for addressing any major cracking, which may necessitate structural reinforcement.
21. QUESTION: Request for a site visit to view the units on site to better prepare a quote.
ANSWER: An optional Site Visit will be held on Wednesday, 15 April 2026 at 10:30AM Eastern Time (ET). ** Please arrive no later than (NLT) 10:30AM.** If you plan on attending, please submit the following information to both amanda.hoyng@us.af.mil and tracy.ferrise@us.af.mil as soon as possible and no later than (NLT) Monday, 13 April 2026 at
12:00 PM ET:
1. Full name as it appears on your driver’s license
2. Driver’s license number
3. Email address
** To accommodate this Site Visit, the solicitation response deadline is hereby extended to 22 April 2026 at 3pm.
22. QUESTION: Have these displays previously been refurbished? How long have they been here?
ANSWER: Displays are in their original condition and have been up for about 25 years.
23. QUESTION: What are the weights of the displays? What are they made of?
ANSWER: The weights are unknown. The material appears to be mainly fiberglass with wood components.
24. QUESTION: PWS Display 5 is a photo of the F-35 but is labeled as the F-16. Can you confirm the refurbishment will be on the aircraft in the photo (F-35)?
ANSWER: Correct, PWS Display 5 is mislabeled. This is a photo of the F-35 and the F-35 is the aircraft that will be refurbished.
Tracy L. Ferrise Contracting Officer
AFLCMC/PZIBB
mailto:amanda.hoyng@us.af.mil mailto:tracy.ferrise@us.af.mil
| 2026-04-15T12:12:48-0400 | |
| FERRISE.TRACY.LYNN.1502030490 |
File details come from the government source that posted it. Updated .