This document contains questions and answers related to a federal contract opportunity for Crane and Hoists Maintenance at Wright-Patterson Air Force Base.
The key details are:
- The contract will be for Firm Fixed Price/T&M commercial items for crane and hoist maintenance.
- The contract is a 100% small business set-aside with a NAICS code of 811310 and a size standard of $12.5M.
- Proposals are due by 1:00 pm Eastern on 27 August 2024 and must be submitted via email to the specified email address.
- The contract requires compliance with the Performance Work Statement and will involve annual non-destructive testing, five-year teardowns, and load testing on various cranes and hoists on-site.
- The government will provide escorts for the contractor to access the cranes but will not provide lifts or manlifts - the contractor must supply their own equipment.
- The contractor will not be able to take photos of deficiencies found during the inspections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and answers:
• Many of the cranes on-site require annual Non-Destructive Testing per OEM and thus OSHA regulations, these include at least all of the Yale, Shawbox, and P&H hoists. Is this to be included as part of the bid spec?
o Additionally, Shawbox, Yale, and P&H each have a five-year teardown requirement on their hoists. Has this been completed or is the contractor expected to write this up as a deficiency?
CE Response – All work should be performed IAW the PWS Para 1.1.1
• There were multiple cranes noted that have been taken out of service – including those that are locked out or alternatively have completely disconnected controls – thus making a proper inspection impossible. Are these still to be quoted for an inspection, even realizing that a proper inspection can not take place?
CE Response – the cranes out of service are real property and will stay on the list in case mission changes which will require their usage. At that time, those cranes/hoists will be requested work to be performed on them.
• Will WPAFB provide an escort for all overhead cranes?
CE Response - YES
• Can WPAFP please provide a height of lift for all cranes for manlift access? Or alternatively, either provide a lift for the contractor to use – or provide a list of different manlifts required for the jobs to be completed?
CE Response – No, the government will not provide a lift for contractor usage. Historically the contractor has used both a scissor and boom lift depending on height.
• While completing the walkthrough, there was at least one crane found to be actively deficient – including deficient/unsafe wire ropes. Should this be re-written up and corrected as a result of the inspection, or alternatively should this be quoted to complete asap?”
CE Response – All work and quotes shall be performed IAW the PWS
• Load testing will require a subcontractor to bring test weights on site. Please clarify if the load testing should be completed at 100% or 125% (max recommendation)
CE Response – Load test will be performed IAW DAFMAN 91-203
• Will the awarded contractor be able to take pictures of found deficiencies to accurately report as-found conditions? Or will this be a location-by-location decision?
CE Response - No
• What is the reasonable expectation for building access on a given day? Will it be possible to complete multiple buildings in one day? Or should the contractor plan for a minimum of one day per building?
CE Response – Historically, all inspections were completed in 1 week. Prior coordination is required NLT
30 days prior due to security concerns.