Atch 1 - LSS PWS Revised 29 Nov 23.pdf
PDF 561 KB Posted
- Solicitation number
- FA860124R0003
About this file
This is a performance work statement for logistics support services at Wright-Patterson Air Force Base in Ohio. The contractor will provide materiel management and maintenance services, including supply, inventory, equipment repair, and support for transient aircraft and aerospace ground equipment. Key responsibilities involve customer support, stock control, equipment management, document processing, inventory services, maintenance, and asset management. The contractor must comply with all applicable regulations and standards for logistics operations, environmental protection, safety, security, and administration. Performance will be evaluated according to detailed timeliness and quality standards. The government will provide facilities, vehicles, equipment, and materials specified in the appendices.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
LOGISTICS SUPPORT SERVICES (LSS)
Materiel Management
Maintenance (AGE/TA)
WRIGHT-PATTERSON AFB, OHIO
29 November 2023
PERFORMANCE WORK STATEMENT
LOGISTICS SUPPORT SERVICES
I
PERFORMANCE WORK STATEMENT (PWS)
RECORD OF REVISIONS
REVISION DATE EVENT DESCRIPTION
TBD Contract Award -
This space intentionally left blank.
II
TABLE OF CONTENTS
PAGE
SECTION I - DESCRIPTION OF SERVICES – GENERAL INFORMATION 1
1.1. SCOPE OF WORK 1
1.2. HOURS OF OPERATION 1
1.2.1. Normal Working Hours 1
1.2.2. Expanded Hours 1
1.2.3. Recognized Holidays 1
1.2.4. Continuation of Essential Contractor Services 1
1.2.5. Government Performance of Service During Labor Strike 1
1.3. CONTRACTOR PERSONNEL 2
1.3.1. Contract Management 2
1.3.2. Contractor Employees 2
1.3.3. Security Requirements 3
1.3.4. Employee Training 4
1.3.5. Key Personnel Qualification Requirements 5
1.4. QUALITY MANAGEMENT SYSTEM 7
1.4.1. Quality Management System 7
1.4.2. Quality Control Plan 7
1.4.3. Inspection System 7
1.4.4. Deficiency Prevention 7
1.4.5. Inspection Files 7
1.4.6. Key Control Procedures 8
1.4.7. Lock/Cipher Combinations 8
1.4.8. Self-Inspection Program 8
1.5. QUALITY ASSURANCE 8
1.5.1. Performance Evaluation Meetings 8
1.5.2. Contracting Officer Representative (COR) 9
1.6. PHYSICAL SECURITY 9
1.6.1. Facility Manager 9
1.7. RECORDS 9
1.7.1. Records Management 9
1.7.2. Disposition of Records 10
III
1.7.3. Training Requirements 10
1.8. ENVIRONMENTAL CONTROLS 10
1.8.1. Compliance with Laws and Regulations 10
1.8.2. Notification of Environmental Spills 10
1.8.3. Material Storage and Use 11
1.8.4. Issue Point (IP) 11
1.8.5. Environmental, Safety, and Occupational Health Compliance
Assessment and Management Program (ESOHCAMP) 11
1.8.6. Hazardous, Toxic, or Special Waste Disposal 12
1.8.7. Solid Waste Disposal and Recycling 13
1.8.8. Wastewater/Storm Water 13
1.8.9. Air Quality 13
1.8.10. Natural Resources Program 13
1.8.11. Underground/Aboveground Storage Tanks 14
1.8.12. Green Procurement 14
1.8.13. Air Force Environmental Quality Program 14
1.9. INDUSTRIAL SAFETY AND HEALTH REQUIREMENTS 14
1.9.1. Voluntary Protection Program (VPP) 14
1.9.2. Contractor Safety and Health Program 15
1.9.3. Contractor Employees 16
1.9.4. Inspections 16
1.9.5. Mishap Notification 16
1.10. EQUIPMENT MAINTENANCE 17
1.11. ANNUAL INVENTORY 17
1.12. VEHICLES 18
1.12.1. Government Furnished Vehicles 18
1.12.2. Vehicle Control Officer (VCO) Responsibilities 18
IV
1.13. ADMINISTRATION 19
1.13.1. Office Records Point of Contact 18
1.13.2. Privacy Act Monitor 19
1.13.3. Official Correspondence 19
1.13.4. Facility Manager 19
1.13.5. Information Technology Equipment Custodian (ITEC) 19
1.13.6. Labor Hour Database 19
1.13.7. Contract Performance Assessment Reporting System (CPARS) 19
1.13.8. Combating Trafficking in Person (CTIP) 19
1.13.9. Level I Antiterrorism Awareness 20
1.13.10. Special/Command Interest Items (SII/CII) 20
1.13.11. Weekly Status Update 20
1.14. COMPUTER AND NETWORK ACCESS REQUIREMENTS FOR USERS
AND EQUIPMENT 20
1.14.1. Network Access Requirements 20
1.15. DATABASES 21
1.16. PUBLICATIONS APPLICABLE TO THIS CONTRACT 21
1.16.1. Publications and Forms 22
1.16.2. Technical Order Distribution Office (TODO) 22
1.17. HOUSEKEEPING 23
1.17.1. Trash Containers 23
1.17.2. Common Areas 23
1.17.3. Liquid Spills 23
1.17.4. Work Areas 23
1.17.5. Snow and Ice 23
1.17.6. Bulletin 24
1.18. TRANSITION PERIOD 23
1.20.1. Follow-on Contractor 23
1.20.2. Access to Facilities 23
1.20. PHASE OUT 24
1.20.1. Incumbent Contractor 24
1.20.2. Joint Inventory 24
1.20.3. Site Visit 24
V
SECTION II – MATERIEL MANAGEMENT
2. DESCRIPTION OF SERVICES 24
2.1. SCOPE OF WORK 24
2.2. MATERIEL MANAGEMENT FLIGHT 25
2.2.1. Customer Support Section 25
2.2.2. Stock Control 27
2.2.3. Research/Records Maintenance 29
2.2.4. Equipment Management 30
2.2.5. Document Control 34
2.2.6. Bench Stock Support 35
2.2.7. Systems Management 36
2.2.8. Asset Management System 37
2.2.9. Inspection Section 38
2.2.10. Central Storage 40
2.2.11. HAZMART 42
2.2.12. Individual Protective Equipment (IPE) 43
2.2.13. Flight Service Center 47
2.2.14. Inventory Section 48
2.2.15. Quality Assurance 49
2.2.16. Degraded Operations 51
2.2.17. Administration/Internal Management of Supplies and Equipment 52
2.3. HOURS OF OPERATION 52
2.3.1. Materiel Management (Supply) 53
SECTION III – MAINTENANCE
3. DESCRIPTION OF SERVICES 53
3.1. TRANSIENT AIRCRAFT (TA)/AEROSPACE GROUND EQUIPMENT MAINTENANCE 53
3.2. MAINTENANCE MANAGEMENT 55
3.3. TRAINING 58
3.4. BUDGET MANAGEMENT 58
3.5. MATERIEL CONTROL 58
3.6. EMERGENCY SERVICES 61
VI
3.7. TRANSIENT AIRCRAFT SUPPORT 61
3.7.1. Aircraft Services 61
3.7.2. Transient Alert 62
3.7.3. Transient Services 63
3.7.4. Arrival Services 64
3.7.5. Top V Support 65
3.7.6. Air Show Support 66
3.7.7. Crash Recovery 66
3.7.8. Maintenance Operations Center 68
3.8. JOINT OIL ANALYSIS PROGRAM (JOAP) LABORATORY 73
3.9. AEROSPACE GROUND EQUIPMENT (AGE) 69
3.9.1. Scheduling 69
3.9.2. Pick-up and Delivery 69
3.9.3. Inspections 70
3.9.4. Manage AGE Equipment 71
3.9.5. Paint 71
3.9.6. AGE Status Report 71
3.9.7. Dispatch 71
3.9.8. Uniform Standard 71
3.9.9. Fuel Bowsers 71
3.9.10. Emergency Requests 71
3.9.11. AGE Inventory 71
3.9.12. Annual transient aircraft landing data 71
3.9.13. Historical Files 71
3.9.14. Welding 72
3.10. GENERAL INFORMATION 72
3.10.1. Hours of Operation 72
3.10.2. Contractor Personnel 72
3.10.3. Clothing/Uniform Requirements 73
SECTION IV - SERVICES SUMMARY (SS)
4.1 SERVICES SUMMARIES 74
4.2. PERFORMANCE EVALUATION 74
4.3. PERCENTAGE OF EFFORT 74
4.4. CONTRACTOR PAYMENT 74
VII
4.5. EXAMPLES OF PAYMENT COMPUTATIONS 75
4.5.1. For services evaluated using 100% Inspection 75
4.5.2. For services using Customer Complaint 75
4.5.3. For services evaluated using Periodic Inspection 76
4.5.4. For services evaluated less than Monthly 76
4.6. SERVICE SUMMARY TABLES 77
4.6.1. General 77
4.6.2. Materiel Management 79
4.6.3. Maintenance 82
SECTION V - GOVERNMENT-FURNISHED PROPERTY AND SERVICES 83
5.1. GENERAL 83
5.1.1. Government-Furnished Facilities 83
5.1.2. Government-Furnished Equipment 83
5.1.3. Property Leased by the Government 85
5.1.4. Vehicles/Mechanized Material Handling Equipment (MMHE) 85
5.1.5. Government-Furnished Materials 85
5.1.6. Equipment Maintenance 85
SECTION VI APPENDICES
PAGE
6.1. APPENDIX TABLE OF CONTENTS 87
APPENDIX A Definitions 88
APPENDIX B Support Agreements, MOA’s and Plans 93
APPENDIX C Publications and Forms 95
APPENDIX D Workload 103
1-D Materiel Management 103 2-D AGE Maintenance/Transient Aircraft 106
APPENDIX E Government Furnished Equipment/Tools 113
1-E Materiel Management 114
VIII
2-E AGE Maintenance/Transient Aircraft 115
APPENDIX F Government Furnished Facilities 116
1-F Materiel Management 117 2-F AGE Maintenance/Transient Aircraft 120
APPENDIX G Government Furnished Vehicles 123
1-G Materiel Management 124 2-G AGE Maintenance/Transient Aircraft 125
APPENDIX H Timeliness/Quality Standards 126
APPENDIX I Materiel Management Geographically Separated Units (GSUs)
SECTION I – DESCRIPTION OF SERVICES -- GENERAL INFORMATION
1.1 SCOPE OF WORK. The contractor shall furnish all labor, supervision, facilities, vehicles, equipment, tools, materials, and other items and services (except those identified as Government-furnished) to perform logistics support services (LSS) primarily at Wright-Patterson Air Force Base (WPAFB), other locations throughout the state of Ohio, and some locations in other states supported by WPAFB; specific locations are identified in each section of this Performance Work Statement (PWS).
The contractor shall perform in accordance with (IAW) the terms and conditions of the contract and the requirements and standards of this PWS. Organizations supported, locations where services are to be performed, and estimated quantities of work are listed in this PWS. Logistics support services fall under the functional headings below. Services the contractor shall perform are listed under each of these functional headings and are specified in the corresponding sections of this PWS.
Materiel Management – Section II Maintenance (TA/AGE) – Section III
1.2. HOURS OF OPERATION
1.2.1. Normal Working Hours. The normal working hours for each functional area are specified in the corresponding sections of the PWS.
1.2.2. Expanded Hours. The contractor shall perform services after normal working hours up to twenty-four (24) hours per day, seven days per week (24/7) as requested to support mission requirements upon implementation of contingency plans and during surges, emergencies, disasters, deployments, exercises, or Continuation of Essential Department of Defense Contractor Services during crises. The contractor shall respond within one (1) hour (or as otherwise specified in each functional-specific section of the PWS) after notification of a requirement for after hours or expanded hours support. The contractor shall provide a workforce during surges, emergencies, disasters, deployments, and exercises or upon implementation of contingency plans as requested by the Government.
1.2.3. Recognized Holidays: The following Federal holidays are observed at WPAFB: New Year’s Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Juneteenth Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. The contractor is not required to provide services on Federal holidays, except as required to support mission requirements during expanded hours as described in Para 1.2.2. For Transient Alert see para 3.10.1.1.
1.2.4. Continuation of Essential Contractor Services. The Government has identified a portion of the contractor services performed under this contract as essential contractor services in support of mission essential functions. The Functional Director has identified Transient Alert Service as an essential contractor service IAW DFARS 252.237-7023, Continuation of Essential Contractor Services. The contractor shall be responsible for performing those services identified as essential contractor services during crisis situations as directed by the Contracting Officer (CO). The Contractor shall submit an original copy of the Mission-Essential Contractor Services Plan to the CO per DFARS regulation.
1.2.5. GOVERNMENT PERFORMANCE OF SERVICE DURING LABOR STRIKE. Because the services called for under this contract are of critical importance to the Air Force, the Government reserves the right to take over performance of this contract in the event of a labor strike by the contractor’s employees. In such an event, the services will be performed exclusively by Air Force employees and not a mix of Air Force and non-striking contractor employees. Under such circumstances and at the direction of the CO, the contractor agrees to remove its non-striking work force from the performance site and not interfere in any way with Government performance. The contractor further agrees under such circumstances to permit the Government to use any essential contractor-furnished property. The Government will equitably compensate the contractor for the additional costs to the contractor for use of such property.
1.3.1. Contract Management. Contractor shall provide a primary and alternate representative to manage and oversee performance of work. Names of primary and alternate (who shall act for primary representative in his/her absence) shall be designated in writing to the Contracting Officer (CO). Contractor shall provide email addresses and telephone numbers for primary and alternate representatives where these persons may be contacted before, during, or after normal work hours.
Representatives shall be able to read, write, speak, and understand English. Representatives shall have full authority to act for contractor on the installation and possess full contractual signatory authority.
1.3.2. Contractor Employees. Contractor shall not employ persons if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population. Contractor employees shall be able to read, write, speak, and understand English fluently.
1.3.2.1. Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person has received approval for such employment according to DoD 5500.7-R, Joint Ethics Regulations (JER). The contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities.
1.3.2.2. Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours, or deployment. Military reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
1.3.2.3. Contractor shall not employ off-duty Contracting Officer Representatives (CORs) who are surveilling any contracts/subcontracts awarded to the contractor.
1.3.2.4. Contractor shall require contractor employees to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, the contractor shall require contractor personnel to appropriately identify themselves as contractor employees on telephone conversations and in formal and informal written correspondence, to include electronic correspondence.
If contractors must go to COR offices, they shall be required to appropriately identify and/or announce themselves when walking into COR office.
1.3.2.5. Contractor shall ensure that its employees have current, valid professional certifications and licenses, as required for contract performance, before starting work under and throughout the life of this contract. The contractor shall obtain and maintain an AF Form 483, Certificate of Competency, for all employees who will operate vehicles on the flight line. All contractor employees operating vehicles carrying hazardous material on and off base, in the performance of this contract, shall have a Hazardous
Materials endorsement, IAW applicable Federal and state driver’s licensing requirements.
1.3.2.6. Contractor personnel shall present a neat, clean, and professional appearance at all times, unless precluded by assigned work. All contractor employees shall be easily recognized as contractor employees by wearing contractor-provided name tags/badges depicting company name, employee’s name, and employee’s title and function. Name tags/badges shall be displayed on the outer clothing in such a way that they are visible at all times and do not pose a safety or Foreign Object Damage (FOD) hazard. Contractor personnel performing duties under this contract shall not wear sweat suits, warm-up suits, halter-tops, shorts or other abbreviated attire, opened toed shoes, or flip flops. During summer months, contractor personnel assigned to warehousing functions may wear walking or knee-length shorts.
Contractor Transient Alert personnel (not including branch supervisors or equivalent) shall wear anti-static uniforms (shirts and pants or coveralls). Clothing worn by contractor employees shall not present a potential FOD hazard. Contractor personnel required to work outside between dusk and dawn shall wear reflective belts/vests IAW Occupational Safety and Health Act (OSHA) Standards.
1.3.2.7. Contractor employees assigned to operate Government vehicles and mechanized material handling systems shall maintain a valid state driver’s license in compliance with the Real ID Act and be certified by the contractor, at the contractor’s expense, as being fully qualified to operate the vehicles/equipment to which they are assigned. The contractor shall document all operator qualifications and provide a letter to the CO and Chief Contracting Officer Representative (C-COR) that lists all personnel and individual qualifications before any employee engages in any mode of equipment operation IAW AFI 24-301 paragraph 11.10. The contractor shall keep this letter current, and the letter shall remain on file with Operator Records and Licensing (OR&L) and the CO.
1.3.2.8. Contractor personnel shall comply with WPAFBI 31-218, Installation Traffic and Parking Code, pertaining to operation of privately-owned vehicles on WPAFB.
1.3.2.9. Contractor personnel shall comply with the Air Force smoking policy as specified in AFI 48-104, Tobacco Free Living, and local directives.
1.3.2.10. Contractor shall provide, in writing to the C-COR, a single point of contact on the first (1st) day of the first performance period, and then annually thereafter, for coordinating all plans, support agreements, memorandums of agreement (MOA), memorandums of understanding (MOU), and other similar documents. Additionally, this individual shall serve as the contractor’s point of contact for any other AF initiatives involving contractor supported equipment and/or facility requirements as it pertains to contractor responsibilities. The contractor shall comply with all agreements and plans as listed in Appendix B to this PWS. The contractor shall notify the C-COR in writing of any personnel changes within five (5) calendar days and send a copy to the respective CORs.
1.3.2.11. Meetings. Contractor shall attend and participate in all scheduled and unscheduled meetings and/or briefings as requested/required.
1.3.3. Security Requirements
1.3.3.1. The contractor shall possess a Facility Clearance Level (FCL) of Secret. This contract requires performance at a government location in the U.S. At least thirty (30) calendar days prior to beginning operations, the contractor shall provide the Information Protection Office shown in the distribution block of the DD Form 254 with all required information IAW the clause at AFFARS 5352.204-9000, Notification of Government Security Activity and Visitor Group Security Agreements.
1.3.3.2. Contractor employees shall comply with security requirements imposed by the Base Commander while on the installation.
Contractor shall provide an initial employee personnel listing, with names and social security numbers, to the Government Security Manager (GSM) thirty (30) calendar days prior to contract start date for initial vetting. All employees shall in-process with the GSM. All contractor employees shall have or be eligible for a favorable suitability determination based on a Tier-1 investigation or equivalent. Contractor employees shall be submitted for suitability investigations by the GSM. All contractor employees requiring access to a controlled/restricted area must have a favorably adjudicated Tier-1 investigation.
1.3.3.3. Safeguarding Classified Information. Contractor employees requiring access to classified information shall have Secret eligibility based on a Tier-3 investigation or equivalent. Contractor employees shall be submitted for security investigations by the Facility Security Officer (FSO).
Contractor shall conform to provisions of DoDM 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). Contractor shall only give access to classified information or material to those with proper security clearance, a valid need to know, and a signed SF 312, Non-Disclosure Agreement, on file.
1.3.3.4. Controlled Unclassified Information. Contractor shall comply with DoDM 5200.01, Volume 4, DoD Information Security Program: Controlled Unclassified Information (CUI), Enclosures 3 & 4, for identification, protection, and training requirements of CUI. Contractor shall be responsible for training contractor personnel and accomplishing out-processing procedures identified in DoDM 5200.01, Volume
4, Enclosure 4. Contractor shall comply with DoD 5400.7‑R/Air Force Manual 33‑302, DoD Freedom of Information Act (FOIA) Program, requirements.
1.3.3.5. Operations Security. Contractor shall comply with AFI 10-701, Operations Security (OPSEC).
Contractor shall follow Government organization’s OPSEC plan and utilize Government critical information listing. GSM shall provide initial and recurring OPSEC training to all contractor employees assigned to this contract.
1.3.3.6. Contractor shall appoint a Security Focal Point (SFP) who shall provide contractor employee training required by the NISPOM, Chapter 3. GSM shall provide initial and recurring security training to all contractor employees assigned to this contract, as well as resource protection training IAW AFMAN 31- 101V1, Integrated Defense Planning, to personnel requiring access to controlled/restricted areas.
1.3.3.6.1. Contractor SFP shall maintain a current listing of contractor’s employees to include: employee name, social security number, date and place of birth, and security clearance level. Listing shall be provided to GSM NLT fifth (5th) calendar day of each new quarter (January 5th, April 5th, July 5th, and October 5th) IAW LRS OI 16-1404.
1.3.3.7. Contractor shall comply with all Force Protection Conditions and implement random antiterrorism measures as directed by the Government.
1.3.3.8. Contractor shall sign an agreement stipulating security requirements of this contract as provided for in DoDM5220.22V2,AFMAN16-1406V2, National Industrial Security Program: Industrial Security Procedures for Government Activities. The following provisions of NISPOM shall apply: Chapters 1, 2, 3, 4, 5, 6, and 7.
1.3.4. Employee Training.
1.3.4.1. Contractor employees shall be fully trained. The contractor shall remain proficient and current in its areas of responsibility according to a contractor-provided training plan. The training plan shall be provided to the CO and C-COR for acceptance no later than (NLT) sixty (60) calendar days after contract start date. Any additional training required due to loss of employee proficiency in his/her specialized duty function shall be completed prior to resuming duties and at the expense of the contractor.
1.3.4.1.1. Expenses incurred for periodic training are the responsibility of the contractor. In the event centrally funded AF-unique training courses are requested by the Government through the MAJCOM and funded seats are available to the contractor, only travel and per diem costs associated with these courses shall be the contractor’s responsibility. When funded seats are not available, course costs including travel and per diem costs associated with these courses shall be the contractor’s responsibility.
1.3.4.2. The Government may request the contractor to attend Government-provided informal/formal training, including Computer Based Training (CBT). The contractor shall complete/attend Government provided training as requested.
1.3.4.3. The Government will provide technical training for new equipment or new technologies specified for use in the performance of the contract. Training will be provided to an initial cadre of contractor personnel identified by the contractor and validated by the COR. Training will be provided to a minimum of one (1) contractor employee but will not exceed ten (10) percent of total contractor employees assigned to the contract. This initial cadre shall provide on-the-job training to the remainder of the contractor’s employees and Government employees as required. When recommended by the COR and approved by the CO, the training classes for the initial cadre will be provided at the Government’s expense. Per-diem and travel costs shall be at the contractor’s expense.
1.3.5. Key Personnel Qualification Requirements
1.3.5.1. Key personnel qualification minimum requirements are provided and shall be maintained throughout the entire contract. Below is a description of the type of experience required for each key position.
Minimum Years Key Position of Experience Type of Experience
Project Manager
Multi-operational Management experience. See 1.3.5.2.
Materiel Management Focal Point 7 Requires 7 years experience in DoD or Air Force Materiel Management including Asset Management Operations and Customer Support Operation
Customer Support Focal Point 4 Requires 4 years experience in DoD or Air Force Customer Support operations to include Document Control, Research/ Record Maintenance, Equipment Management, Stock Control, Bench Stock and Systems Management functions.
Asset Management Focal Point 4 Requires 4 years experience in DoD or
Air Force Asset Management operations to include Receiving, Inspection, Central Storage, HAZMAT, Individual Protective Equipment, Repair Cycle and Inventory functions.
TA Focal Point 7 Requires 7 years experience in DoD or Air Force Transient Aircraft Support. To include detailed knowledge of Aircraft Services, Transient Alert, Arrival Services, Departure services, Crash Recovery, Joint Oil Analysis, FOD and DOP Programs, and MOC.
AGE Focal Point 7 Requires 7 years experience in DoD or Air Force AGE. To include detailed Knowledge of Scheduling, Pick-up & Delivery, Inspections, Corrosion Control, AGE Status Reports, Dispatch, Technical Orders, Tool Accountability, Crash Recovery, Underground Storage Tanks and fuel Control, Welding, AGE Inventories and Transient Aircraft Landing Data.
1.3.5.2. Project Manager. Requires knowledge of all aspects of management to include labor and contractual negotiations, hiring and placement of qualified personnel, scheduling workload, developing programs and procedures to assure surge or disaster requirements, coordination with on-base support, preparation of official correspondence, ability to evaluate suggestions, and knowledge of chain of command and protocol. Manager is ultimately responsible for all aspects of contract performance and compliance with fire, safety, and environmental protection requirements.
1.3.5.3. Materiel Management Focal Point. Individual shall have background on all retail materiel management functions for a base/location, such as receiving, storing, inspecting, inventorying, issuing, returning, repair cycle, and customer support. Individual must be able to effectively communicate with CORs on the Materiel Management functions of the PWS. Manager shall be liaison for the LRS CC/AO for Deputy Maintenance Group Commander (MXG/CD) daily production/scheduling meeting.
1.3.5.4. Customer Support Focal Point. Individual shall have background in equipment management, quality management, document control, customer support, research and base level records maintenance, base level stock control functions, bench stock management, and Inventory.
1.3.5.5. Asset Management Focal Point. Individual shall have background in Central Storage, Aircraft Parts Store (APS), HAZMART, Inspection, Flight Service Center, Receiving, Care of Supplies in Storage (COSIS), Individual Protective Equipment (IPE), Inventory, and Delivery Staging Area.
1.3.5.6. TA Focal Point. Individual shall have background in management, maintenance, procurement, processing parts, transient alert, and all other function/responsibilities identified in the PWS referring to TA. Individual must be able to effectively communicate with CORs on the Maintenance functions of the
PWS.
1.3.5.7. AGE Focal Point. Individual shall have knowledge in management, maintenance, procurement, processing parts, repair of aerospace ground equipment, and all other function/responsibilities identified in the PWS referring to AGE.
1.4. (SS-1-1) Quality Management System (QMS)
1.4.1. Quality Management System. Contractor shall establish and maintain an acceptable QMS.
System shall be resourced adequately to execute the following quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and 4) Follow-up to ensure quality-related problems/defects do not reoccur. Furthermore, a mature QMS requires contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on COR’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not reoccur. Contractor shall submit QMS to CO for acceptance no later than (NLT) ten (10) business days before start of first operational performance period. Plan shall include, but not be limited to, the following:
1.4.2. Quality Control Plan. Contractor shall establish and maintain a comprehensive Quality Control Plan (QCP), subject to acceptance by the CO and ChiefCOR, that addresses the “detection” function that defines the type, number, Acceptable Quality Levels (AQLs), and frequency of quality assurance/control inspections planned by the contractor that meet the intent of the clause at FAR 52.212- 4(a), to ensure the requirements of the contract are satisfied.
1.4.3. Inspection System. A description of the inspection system covering all services listed in each functional-specific section of this PWS. Specify areas to be inspected on either a scheduled or unscheduled basis, frequency of inspections and titles of the individuals who shall perform the inspection, their organizational placement, and the location of inspection records.
1.4.4. Deficiency Prevention. A description of the methods used for identifying and preventing defects in the quality of service performed before the level becomes unacceptable.
1.4.5. Inspection Files. A description of the records shall be kept that document all inspections conducted by the Contractor and the necessary corrective and preventive actions taken. This documentation shall be always made available to the Government during the term of the contract.
The records shall be maintained at the location designated in the Contractor’s Quality Control Plan. The inspection record’s format shall include, but not be limited to:
a. Date, time, and location of the inspection.
b. A signature block for the person who performed the inspection.
c. Ratings of acceptable or unacceptable work performance.
d. Areas designated for deficiencies noted and corrective action taken.
e. Total number of observations.
1.4.6. Key Control Procedures. Contractor shall establish and implement methods to provide accountability for keys issued to contractor by the Government. Contractor shall not duplicate keys issued by the Government. Contractor shall develop procedures covering key control to include turn-in of issued keys by personnel who no longer require access. Contractor shall include procedures in the QMS.
Contractor shall return keys at conclusion of contract.
1.4.6.1. Contractor shall report any occurrence of lost or duplicated keys to COR within one (1) hour of discovery, or next business day if discovered after normal business hours.
1.4.6.2. In the event Government-provided keys are lost or duplicated, affected lock(s) shall be re-keyed or replaced by the Government at contractor’s expense. In the event a master key is lost or duplicated, Government will replace all locks and keys for that system, and total cost shall be at contractor’s expense.
These costs shall be deducted from the applicable total CLIN price.
1.4.6.3. Contractor shall prohibit use of Government-issued keys by any persons other than contractor's employees unless authorized by COR. Contractor shall prohibit its employees from opening locked areas to permit entrance of persons other than contractor's employees without CO approval.
1.4.7. Lock/Cipher Combinations. Contractor shall establish and implement procedures to preclude lock/cipher combinations from disclosure to unauthorized persons. Contractor shall ensure lock/cipher combinations are changed when personnel having access to combinations no longer have a “need to know.” COR/CO shall be notified within one (1) business day of any change. Contractor shall include procedures in the QMS.
1.4.8. Self-Inspection Program. Contractor shall participate in the unit Self-Assessment Program
(SAP) IAW AFI 90-201, AFI 90-201 AFMCSUP, and 88th Logistics Readiness Squadron (LRS) Operating Instruction (OI) 90-201. Contractor shall utilize the Management Internal Control Toolset (MICT) to complete self-assessments.
1.4.8.1. Contractor shall attend all SAP training provided by Government SAP Manager.
1.4.8.2. Contractor shall provide self-assessment communicator (SAC) point of contacts to Government SAP Manager. Contractor shall ensure all applicable SACs are tracked in the MICT.
1.4.8.3. Contractor shall complete self-assessments as required by 88 LRS OI 90-201. Results shall be provided to COR no later than two (2) business days prior to suspense date.
1.4.8.4. Contractor shall use Government’s process for deficiency management as outlined in 88 LRS OI 90-201.
1.5. QUALITY ASSURANCE. The Government will evaluate the contractor’s performance under this contract. The Government will record all surveillance observations on a Corrective Action Report (CAR) or equivalent form and provide this report to the contractor. The CO shall make the final determination on any disputed discrepancies.
1.5.1. Performance Evaluation Meetings. Contractor may be required to meet at least weekly with the COR and the CO during the first month of performance, as requested by the Government. Meetings shall be as often as necessary thereafter as determined by the CO. The contractor can request a meeting with the CO as deemed necessary. The written minutes of all performance evaluation meetings will be prepared by the Government and shall be signed by the contractor, CO, and COR. Should the contractor non-concur with the minutes, the contractor shall so state any areas of non-concurrence in writing to the CO within ten (10) calendar days of receipt of the signed minutes. The minutes shall be included in the contract file.
1.5.2. Contracting Officer Representative (COR)
1.5.2.1. CORs are technical representatives of the CO and will participate in the administration of this contract.
1.5.2.2. The COR(s) will inform the contractor in writing via a corrective action report (CAR) when discrepancies are observed and will request corrective action be taken. The COR(s) will note the discrepancy with the date and time observed and request the contractor initial the entry and provide corrective action.
1.5.2.3. The contractor shall refer to the CO, not the COR(s), any alleged change to the scope, prices, terms, or conditions of the contract.
1.6. PHYSICAL SECURITY. Contractor shall safeguard all Government property provided for contractor use. At the close of each work period, contractor shall secure all Government facilities, property, and materials. The contractor shall comply with AFMAN 31-101V1, Integrated Defense Planning, as it pertains to safeguarding Government-furnished facilities and material contained therein.
1.6.1. Facility Manager. Contractor shall identify in writing within ten (10) calendar days of contract start date, and updated annually thereafter, a single point of contact for each logistics function, to manage issues related to the maintenance/serviceability of the Government-furnished facilities per WPAFB Pamphlet 32-2, para 1.2.
1.7. RECORDS. Records include books, papers, maps, photographs, machine-readable materials, and other documentary materials, regardless of physical form or characteristics. Records are made or received under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation, as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities, or because of the informational value of the data in them. A record covers information in any medium, and includes operational, logistics, support, and other materials created or received in training, contingency, and wartime operations as well as in all routine and peacetime business. Electronic media is the choice for use, storage, and management of records. Paper records should only be created to meet a historical and/or legal requirement. All records, files, documentation, working papers, and software provided by the Government or generated in the performance of this contract become and remain Government property.
1.7.1. Records Management. Records, files documentation, and working papers, developed as a result of activities associated with performance of this contract are Government property and shall be maintained in accordance with AFI 33-322, Records Management and Information Governance Program; AF Electronic Records Management (ERM) Solution; AF Records Information Management System (AFRIMS), Records Disposition Schedule located on-line and have CAC or PKI access at https://www.my.af.mil/afrims/afrims/afrims/rims.cfm; and all other pertinent directives, as supplemented. Note: AFRIMS on-line is where the contractor shall manage all files, paper and electronic, that pertain to this PWS and contract. AFRIMS online will be accessible after contract award and with CAC or PKI access.
1.7.2. Disposition of Records. At the time of disposition, contractor shall seek disposition guidance from CO or COR prior to removing any records, physical or electronic, from their approved location(s).
Based on the decision of the Government representative, electronic files will be moved to the appropriate staging area for disposition IAW AFI 33-322. The contractor shall box and label contents, and turn over physical files to the COR or the CO. If requested by the Government, the contractor shall provide the original record or a reproducible copy of any such record within five (5) business days of receipt of the request.
1.7.2.1. Personnel shall not conceal, remove, mutilate, obliterate, or destroy records without prior documented Government approval.
1.7.3. Training Requirements. The contractor shall ensure Level 1, General Records Awareness Training, is completed annually by all employees. The contractor shall ensure that employees designated as the Records Custodian complete Level II, AF CBT, and Records Management, and that designated Office Records Points of Contact additionally complete Level III, AF CBT, and Advanced Records Management (to include Electronic Records Management). The contractor shall provide one (1) copy of the required training certificates to the COR at the completion of the training.
1.8. ENVIRONMENTAL CONTROLS.
1.8.1. Compliance with Laws and Regulations. Contractor shall comply with applicable Federal, State, and Local laws, regulations, and requirements regarding environmental protection and changes thereto.
Contractor shall be knowledgeable of and comply with all applicable laws, regulations, permits, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor shall comply with such laws as they become effective.
1.8.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 (or other applicable environmental statutes or regulations) into the environment, the contractor or its agent shall report the incident by dialing 911 or 257-9111 by cell phone. Additionally, the contractor shall call 88 ABW/CEV, Environmental Management Division, at 257-7152 and contact the COR. Contractor shall provide a written report to the COR within twenty-four (24) hours. The liability for the spill or release of such substance’s rests solely with the contractor and its agent.
Environmental Management shall make the final determination for acceptable clean up levels. If the spill occurs off base, contractor shall contact environmental regulators, follow Department of Transportation (DOT) regulations, and accomplish appropriate base notification.
1.8.2.1 If contractor detects, but did not create, either a spill or release of any substance contained in 40 CFR 302 (or other applicable environmental statutes or regulations) into the environment, contractor shall complete reporting requirements as defined in para 1.8.2.
1.8.2.2. Contractor shall have spill kits on hand and other items necessary for hazardous material spill containment and cleanup. Sufficient quantities of kits shall be on hand as required to absorb or contain spills from the largest container of a hazardous material stored by contractor.
1.8.3. Material Storage and Use. Contractor shall follow the manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and material handling, to include hazardous materials (HM). Contractor shall procure, use, handle, and store all HM IAW all Federal, State, and local laws, policies, regulations, and procedures, as well as Air Force policies, regulations, and procedures.
1.8.3.1. Within fifteen (15) business days after the start of the first operational performance period, and then annually thereafter, contractor shall appoint in writing a primary and alternate Environmental Control (EC) representative. Contractor shall provide a copy of the appointment letter to CO and COR along with any updates within fifteen (15) business days of any changes. EC shall manage all environmental activities performed by the contractor and support the 88 LRS Unit Environmental Coordinator as required. The EC shall 1) serve as the liaison to Environmental Management for issues concerning the management of HM/Hazardous Waste (HW), water quality, air quality, tanks, Polychlorinated Biphenyls (PCBs), mercury lamps, natural resources, used oil, and Environmental Impact Analysis Program; 2) Attend the installation’s Hazardous Substance Steering Committee (HSSC) to provide feedback from the meeting and implement any changes introduced there; AND 3) Participate in quarterly Hazardous Waste Site Inspection Team (HWSIT) audits and other inspections as directed by the HSSC Chairperson.
1.8.3.2. Notification Requirements. Contractor shall notify the Hazardous Material (HAZMAT) Cell, through the Air Force Tracking System, of all hazardous material it will use in the performance of this contract (regardless of procurement method) IAW procedures outlined in the Installation HAZMAT Management Program (IHMP) Plan and AFI32-7086_WRIGHTPATTERSONAFBSUP, Hazardous Material Management. Contractor shall obtain prior approval from the HAZMAT Cell before any container of HM is brought on WPAFB. Additionally, contractor shall report within two (2) business days through the Air Force Tracking System to the HAZMAT Cell when a HM container is empty or removed from the installation. These requirements do not apply to hazardous material stored by base supply and accounted for on the Standard Base Supply System/Integrated Logistics System-Supply
(SBSS/ILS-S).
1.8.3.3. Hazardous Material Purchases. Contractor shall route and coordinate all customer requests for the purchase/use of hazardous materials/supplies to the HAZMAT Cell; the only exception being items purchased for HM stock replenishment requirements. Contractor shall not purchase or store hazardous material on WPAFB (except for HM accounted for on SBSS/ILS-S records and stored in the supply operated HAZMAT warehouse) without prior acknowledgement of the HAZMAT Cell IAW the WPAFB IHMP Plan, including all policy statements contained therein.
1.8.4. Issue Point (IP). Contractor shall establish, through the HAZMAT Cell, a centralized location to store, receive, transfer, and issue hazardous materials IAW AFI32- 7086_WRIGHTPATTERSONAFBSUP, Hazardous Material Management.
1.8.4.1. Within fifteen (15) business days after the start of the operational performance period, and then annually thereafter, the contractor shall appoint in writing a primary and alternate responsible for management of the IP. A copy of the appointment letter shall be provided to CO and COR and a copy forwarded to Environmental Management. The appointed individual shall update and maintain accurate data in the HAZMAT tracking system database. The appointed individual shall ensure all HM items are labeled and stored IAW OSHA Standards and the WPAFB HM Management Plan.
1.8.5. Environmental, Safety, and Occupational Health Compliance Assessment and Management Program (ESOHCAMP). Contractor shall support and participate in external and internal ESOHCAMP inspections (at least one per year). If notified by the COR, the contractor shall provide a representative to augment the ESOHCAMP team for the period specified in the notification – usually one business week.
The contractor shall ensure that representative completes ECAMP/ ESOHCAMP training provided by the Air Force Institute of Technology (AFIT).
1.8.6. Hazardous, Toxic, or Special Waste Disposal. Contractor shall comply with all Federal, State, local, Air Force environmental laws, policies, regulations, and procedures specified in, but not limited to:
40 Code of Federal Regulations (CFR) Parts 260 through 268; 40 CFR Pt 761; 40 CFR Pt 279; 49 CFR Parts 170 through 177; Ohio Administrative Code (OAC) 3745-50 through 3745-58; AFMAN 32-7002, Environmental Compliance and Pollution Prevention, Air Force Materiel Command (AFMC) Standard Hazardous Waste Operating Procedures; and AFI32-7086_WRIGHTPATTERSONAFBSUP, WPAFB Hazardous Waste Management, including all policy statements contained therein for hazardous, toxic, or special wastes which cannot be disposed of as solid waste in a “Subtitle D” landfill generated as a result of performance of work under this contract.
1.8.6.1. Waste Streams. Contractor shall report new waste streams and any changes to existing waste streams to Environmental Management (EM), including any changes made to processes that could change the characteristics of the wastes being generated to determine whether a specific waste is hazardous. The HW generating site supervisor shall ensure that all waste streams are reported directly to Environmental Management and the appointed Environmental Coordinator (EC)/Unit Environmental Coordinator (UEC) IAW the AFI32-7086_WRIGHTPATTERSONAFBSUP.
1.8.6.2. Initial Accumulation Point (IAP) Management. Contractor shall establish, as required, and operate all necessary IAPs/Satellite Accumulation Points for the temporary storage of hazardous and other regulated wastes as defined in the AFMAN 32-7002, Environmental Compliance and Pollution Prevention, and 40 CFR 262. Additional information for Hazardous Waste Management Program can be found at: Site Pages - HazWaste Managers (dps.mil).
1.8.6.3. Hazardous Material/Waste Management Training. Contractor shall ensure that IAP monitor, alternate, and his/her direct supervisors (or equivalent) attend the installation Hazardous Material/Waste Management Training Course conducted by EM. Contractor shall attend the first available training session either on the first (1st) day of the transition period or the first available training session thereafter and shall complete the annual training requirement as scheduled by 88 ABW/CEV. This training is provided as a briefing on WPAFB specific procedures and does not replace any training the contractor is required to provide its employees. Training sign-up can be accomplished at the following: HazMat Training Dates - All Items (dps.mil).
1.8.6.4. Hazardous Waste Turn-In. Contractor shall properly complete a Hazardous Waste Pick-up Form, manually or electronically, for each type of hazardous waste/special waste when the waste container is ready for pick-up IAW the AFI32-7086_WRIGHTPATTERSONAFBSUP.
Contractor shall obtain signature/coordination through EC/UEC and forward the form to EM.
1.8.6.5. Hazardous Waste Sent to Recycling. Certain hazardous wastes (i.e. Safety Kleen solvent waste turned in for recycling or wipers sent for laundering) may be handled outside of the normal CEV/Defense Logistics Agency Disposition Services (DLADS) turn-in channels. Contractor shall obtain approval in writing from CEV prior to commencing any such operations. Contractor shall obtain the signature of a CEV representative for all required Uniform Hazardous Waste Manifests and other accompanying documentation associated with the shipment of these wastes.
1.8.6.6. Used Oil and Waste Liquid Petroleum Products (WLPP). Contractor shall comply with the Used Oil and Waste Liquid Petroleum Management Policy at: Site Pages - HazWaste Managers (dps.mil) or call 937-257-5532/0023.
1.8.6.7. Mercury-Containing Light Bulbs. Contractor shall comply with the Universal Waste Management Procedures for Wright-Patterson AFB, these procedures can be found at:
https://usaf.dps.mil/teams/21020/WPAFB/CEI/CEIE/HazWaste%20Document%20Library/2021.10%20 Procedures%20-%20Universal%20Wastes.pdf#search=Spent%20mercury
1.8.6.8. Polychlorinated Biphenyl (PCB) Fluorescent Light Ballasts. Contractor shall comply with the Universal Waste Management Procedures for Wright-Patterson AFB, these procedures can be found at:
https://usaf.dps.mil/teams/21020/WPAFB/CEI/CEIE/HazWaste%20Document%20Library/2021.10%2 0Procedures%20-%20Universal%20Wastes.pdf#search=Spent%20mercury
1.8.6.9. PCB Containing Items. Contractor shall comply with the Universal Waste Management Procedures for Wright-Patterson AFB, these procedures can be found at:
https://usaf.dps.mil/teams/21020/WPAFB/CEI/CEIE/HazWaste%20Document%20Library/2021.10%20Proced ures%20-%20Universal%20Wastes.pdf#search=Spent%20mercury.
1.8.7. Solid Waste Disposal and Recycling. Contractor shall comply with all Federal, State, and local environmental laws, policies, regulations, and procedures, as well as Air Force environmental policies, regulations, and procedures specified in, but not limited to: 40 CFR Pt 240-259, OAC 3745, AFMAN 32- 7002, Environmental Compliance and Pollution Prevention, Executive Order 12873, 20 Oct 93, Policy for DoD Recycling, 28 Sep 93, AFMC Qualified Recycling Program Guidance, and the WPAFB Qualified Recycling Plan (QRP) for solid or special wastes which can…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .