Requirements Document dated 26 December 2017

View the file

Other files for this federal contract opportunity

Other files attached to Waterless Fire Supression System Maintenance and Repair, newest first.
File Type Posted
Q&A_27_December_2017.docx DOCX document
FAQ_26_December_2017.docx DOCX document
PWS_revised_1_year.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED 26 Dec 17

REQUIREMENTS DOCUMENT

IN SUPPORT OF

FIRE SUPPRESSION SYSTEM SERVICES

FOR

AEROSPACE SYSTEMS DIRECTORATE

AIR FORCE RESEARCH LABORATORY

WRIGHT PATTERSON AFB, OH

The Aerospace Systems Directorate, Air Force Research Laboratory, is seeking a contract for normal maintenance services, yearly inspections, testing, upgrades, modifications, and emergency maintenance for three (3) high pressure carbon dioxide fire suppression systems and nine (9) low pressure carbon dioxide systems installed between 1940 and 2008 and one (1) Aqueous Fire Fighting Foam (AFFF) system. The Contractor shall furnish all equipment, labor, and materials, and shall perform all operations necessary to complete the work.

Estimated Annual Requirements:

Description
Annual Quantity
Low pressure CO2 system inspection
9 EA
High pressure CO2 system inspection
3 EA
AFFF inspection
1 EA
Emergency Call
1 EA (20 hours)
Backup battery replacement
4 EA (2 calls)
Main tank top off
17,000 lb (2 calls)
Main tank refrigeration inspection
1 EA
Main tank refrigeration service
1 EA
Upgrade low pressure CO2 panel
1 EA
Install isolation valve
1 EA

Minimum Requirements:

1. CONTRACTOR QUALIFICATIONS

Contractor shall have a license from the Ohio state fire marshal’s office.

2. ISOLATION VALVES

Isolation valve shall be installed per PWS Para. 15b in Bldg 18C, Rm B003 (Battery Vault). The main header for this valve is 1 ½ inch diameter.

3. UPGRADE SPECIFICATIONS

Equipment replaced or modified in PWS Para. 15b shall be compatible with the equipment listed below.

FLOOD

30 SECOND DELAY

LOW PRESSURE

LOCATION
PANEL

TYPE

SPURT
MANUAL

DUMP

AUTOMATIC

DUMP

INPUTS
OUTPUTS
Bldg 18C, Battery vault B003
Chemetron Micro 1 EV
X
X
· Heat detector

· Manual switch

· Bldg alarm

· HVAC shutdown

· Annunciators

· Trouble

Phoenix Rig No Delay

HIGH PRESSURE

Bldg 490

RC-152

Gemini Kidde-Fenwal

WK-265134-000

X
X
· UV/IR Detector

· Manual Switch

· Annunciators