Q&A_27_December_2017.docx
DOCX document 12 KB Posted
- Attached to
- Waterless Fire Supression System Maintenance and Repair Federal contract opportunity
- Solicitation number
- FA8601-18-R-0013
About this file
Q&A 27 December 2017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_Fire_Suppression_System_Maintenance-17-12-26.docx | DOCX document | |
| FAQ_26_December_2017.docx | DOCX document | |
| PWS_revised_1_year.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A 27 December 2017
Q1. On the Phoenix rig do they want the panel removed and cable release added, or just remove flame detector?
A1. Just remove the flame detector, convert to manual operation, and relocate nozzle. Panel should remain. (The Phoenix rig is in Bldg 490, Rm 152)
Q2. Is the panel for 18C in the basement?
A2. Yes, it is for the basement battery vault B003.
Q3. Is the supply pipe that feeds that room accessible?
A3. Yes, it is accessible.
File details come from the government source that posted it.