Q&A_4_-14_September_18.pdf

PDF 16 MB Posted

Attached to
MT65 and MT45 Microwave Absorber Federal contract opportunity
Solicitation number
FA8601-18-Q-0204
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Disregard Q&A 3 - this is the corrected version. Please also see the corrected SOW

View the file

Other files for this federal contract opportunity

Other files attached to MT65 and MT45 Microwave Absorber, newest first.
File Type Posted
SOW-_Updated_-14_Sep_2018.pdf PDF
Updated_SOW-14_September_2018.pdf PDF
Q&A_14_September_18.pdf PDF
Q&A_31_August_2018.pdf PDF
Attachment_1.pdf PDF
Attachment_3.pdf PDF
Attachment_2.pdf PDF
Q&A_30_August_2018.pdf PDF
AFIT_ACER_(bldg_168).pdf PDF
Attachment_2_Offeror_Reps_and_Certs.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment_3_Clauses.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFMC)

WRIGHT-PATTERSON AIR FORCE BASE OHIO

14 September 2018

FROM: AFLCMC/PZIBC (Hannah Wood) 1940 Allbrook Drive, Room 109 Wright-Patterson AFB, OH 45433

SUBJECT: Response to Inquiries regarding FA8601-18-Q-0238 MT65 and 45 Microwave Absorber

QUESTIONS

1. The SOW for AFIT requires both polystyrene Microwave Absorber model MT65 and MT45 manufactured by Comtest Engineering. Can the user identify the areas when each size RF absorber is to be used MT45 and MT65?

Location Size

1. Transmit End Wall MT45 or MT65

2. Receive End Wall MT45 or MT65

3. Side Walls MT45 or MT65

4. Ceiling MT45 or MT65

5. Floor MT45 or MT65

2. Polystyrene Microwave Absorber Model MT65 and 45 may not be the best models to meet SOW performance specification. Is a design using ALL MT45-JT an acceptable alternate (see cut sheet)?

3. ECT45 white foam caps negatively affect the RF absorber performance and are not recommended. If the "Hallway area" is located within an indirect RF illumination area the affects may have less impact. Can you identify the "hallway area" and coverage area in surface square feet.

ANSWERS

1. The choice is up to the vendor as long as they meet the required return loss specifications provided in the salient characteristics. I would suggest MT65 on the back wall.

2. This is a brand name acquisition, only the MT 65 and MT 45 models are acceptable.

3. The "hallway" area is 256 square feet. Please see the SOW - Updated - 14 September 2018, and the photo below for reference.

DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFMC)
WRIGHT-PATTERSON AIR FORCE BASE OHIO
14 September 2018