Additional Shuttle Orbiter model details v01.pdf

PDF 174 KB Posted

Attached to
Space Shuttle Scale Models
Solicitation number
FA8601-12-R-0081
Issued by

About this file

Questions Ansers

View the file

Other files

File Type Posted
Questions 8.20.12.pdf PDF
Questions 8.10.12.pdf PDF
Questions Answers 8.3.12.pdf PDF
Saturn V.zip ZIP file
Titan IVB Drawing.pdf PDF
Titan IIID.zip ZIP file
Delta II.zip ZIP file
407672main_iss021e032920_hires 1 .jpg JPG image
Saturn 1B.zip ZIP file
Delta IV —
Atlas V —
ISS.zip ZIP file
jupitercwithexplorersatellite 1 .jpg JPG image
Model Technical Specifications 8.2.12.pdf PDF
Explorer I.zip ZIP file
Thor Agena.zip ZIP file
Mercury-Redstone_3_Launch_MSFC-6100884 1 crop.jpg JPG image
Atlantis2.zip ZIP file
cape095f 1 .jpg JPG image
Gemini Titan II —
Atlas-Centaur 3D.zip ZIP file
Mercury Atlas.zip ZIP file
Atlantis Full Stack —
Explorer_I_Characteristics 1 .jpg JPG image
Model Technical Specifications —
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8601-12-R-0081

Additional Shuttle Orbiter model details:

On the surface of the model, thermal tiles and blankets are to be depicted visually, though it is not required to reproduce in scale the actual surface relief (i.e., “roughness”) of the actual vehicle. In addition, tile numbers are not required, but the impression of individual tiles and the tile pattern must be discernable. Surface markings such as rescue, warning, and servicing placards are to be replicated. No wear or weathering appearance on the orbiter surface is required.

Clear acrylic rods are to be sized in diameter appropriate to the weight of the model, and hold the model with 8-10 inches of clearance from the base under the left wingtip (the vehicle will be displayed banked at 40 degrees left). The support base must be sized to provide long-term stable support, and be matte black in color, showing no wood grain if constructed of wood. The exact shape of the base and rod configuration should be proposed by the contractor, subject to the parameters described above.

File details come from the government source that posted it. Updated .