RFI_3_Response 1 .pdf
PDF 3 KB Posted
- Attached to
- Replace Steam Lines S219 to Facility 20642, Project 100157 Federal contract opportunity
- Solicitation number
- FA8601-12-B-0009
About this file
Additonal RFI Responses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8601-12-B-0009-0001.pdf | ||
| Environmental Report.pdf | ||
| DBA Wage Decision OH2 - Heavy - 10 Aug 12.pdf | ||
| RFI Responses - 9 Aug 2012.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| FA8601-12-B-0009.pdf | ||
| 100157 Project Specifications.pdf | ||
| DBA WD OH2 Mod 18.pdf | ||
| 100157 Project Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8601-12-B-0009
Replace Steam Lines Between S-219 & F/20642 Vendor RFIs and Government Responses
10 Aug 2012
1. Are there any soil test borings of new piping locations? If not, is there any concern that there may be rock in the new excavation areas?
Response: There are no soil test borings for the new pipe locations. As-built drawings did not indicate rock, and the new piping is going in the same location as the existing piping at or above the depth of the existing piping.