100157 Project Drawings.pdf
PDF 7 MB Posted
- Attached to
- Replace Steam Lines S219 to Facility 20642, Project 100157 Federal contract opportunity
- Solicitation number
- FA8601-12-B-0009
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8601-12-B-0009-0001.pdf | ||
| Environmental Report.pdf | ||
| DBA Wage Decision OH2 - Heavy - 10 Aug 12.pdf | ||
| RFI_3_Response 1 .pdf | ||
| RFI Responses - 9 Aug 2012.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| FA8601-12-B-0009.pdf | ||
| 100157 Project Specifications.pdf | ||
| DBA WD OH2 Mod 18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
DATEDRAWNDESIGNED CHECKED
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
T001
CONTRACT NO:
PROJECT NO: ZHTV 100157
100% SUBMITTAL
DRAWING INDEX
WRIGHT-PATTERSON AFB, OHIO
S-219 TO F/20642
REPLACE STEAM LINES,
COVER SHEET
STRUCTURAL DRAWINGS
ELECTRICAL DRAWINGS
MECHANICAL DRAWINGS
SITE DETAILS
STEAM LINE PLAN & PROFILE
OVERALL SITE PLANS
TRAFFIC MAINTENANCE PLAN
GENERAL NOTES
COVER SHEET
S200 thru S201 -
E201 thru E301 -
M101 thru M301 -
C706 -
C700 thru C705 -
C100 thru C101 -
TM01 -
GN01 -
T001 -
S T
A T E
OF O
H
I O
P R
O F
E S S
IONAL EN
G I
N E
E R
R E
GISTER
E
D
E51255
BATTAGLIA
S.
PETER
GN01
SAW CUT ALL CONCRETE PRIOR TO REMOVAL.
GENERAL NOTES
1.
THEREIN.
REGULATIONS, STANDARDS, OR SPECIFICATIONS REFERENCED
THE CONTRACT PLANS AND SPECIFICATIONS AND ANY RULES,
THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH2.
3.
CONSIDERED INCIDENTAL TO THE PROJECT.
ALL PERMIT FEES. COSTS FOR PERMITS SHALL BE
IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO PAY
REQUIRED FOR THE PERFORMANCE OF THIS CONTRACT.
THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS
4.
BE THE COMPLETE RESPONSIBILITY OF THE CONTRACTOR.
ANY DAMAGE TO THE BASE AND OFF-SITE ROADS SHALL
DELIVERY OF MATERIALS AND EQUIPMENT TO THE SITE.
THE CONTRACTOR MUST OBTAIN PROPER PERMITS FOR
5.
MAINTENANCE OF UTILITY SERVICE FOR THE FIELD OFFICE.
WITH THE CONTRACTING OFFICER FOR ESTABLISHMENT AND
DURATION OF THE PROJECT. CONTRACTOR TO COORDINATE
MAINTAIN A FIELD OFFICE AT THE STORAGE AREA FOR THE
WITH THE CONTRACTING OFFICER, WPAFB. CONTRACTOR TO
AREA. THE LOCATION OF THIS AREA SHALL BE COORDINATED
PARKING SHALL BE PERMITTED IN THE DESIGNATED STORAGE
PROJECT AT THE CONTRACTOR’S EXPENSE. ON-SITE EMPLOYEE
TO THE ORIGINAL CONDITION UPON COMPLETION OF THE
MOBILIZATION AND STORAGE. THIS AREA SHALL BE RESTORED
AN AREA WILL BE MADE AVAILABLE FOR THE CONTRACTOR’S
6.
APPROVAL OF THE WORK SCHEDULE.
WORK. NO WORK SHALL COMMENCE WITHOUT WRITTEN
TIMING SEQUENCE ANTICIPATED TO COMPLETE ALL REQUIRED
WORK SCHEDULE SHALL INDICATE THE WORK ITEMS AND
PROGRESS WORK SCHEDULE FOR REVIEW AND APPROVAL. THE
SUBMIT TO THE CONTRACTING OFFICER A WRITTEN PROJECTED
PRIOR TO STARTING ANY WORK, THE CONTRACTOR SHALL
7.
COMPLETION.
ALL EXCAVATED AREAS AS NECESSARY FOR PROJECT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING
8.
9.
ATTENTION OF THE CONTRACTING OFFICER.
EXISTING FIELD CONDITIONS SHALL BE BROUGHT TO THE
INSTALLATIONS. ANY DISCREPANCIES BETWEEN PLANS AND
LOCATIONS AND ELEVATIONS PRIOR TO ANY UNDERGROUND
CONTRACTOR SHALL EXCAVATE TO VERIFY ALL UTILITY
SHALL BE THE CONTRACTOR’S RESPONSIBILITY. THE
LOCATIONS AND ELEVATIONS AS WELL AS FIELD DIMENSIONS
DRAWINGS. FINAL VERIFICATION OF EXISTING UTILITY
DRAWINGS ARE DRAWN FROM FIELD SURVEY AND AS-BUILT
SANITARY, GAS, ETC.) AS SHOWN IN THESE CONTRACT
STEAM, COMPRESSED AIR, ELECTRIC, STORM, WATER,
ALL EXISTING UNDERGROUND UTILITIES (CATV, TELEPHONE,
10.
19.
DEBRIS AT ALL TIMES.
AFFECTED BY THE WORK SHALL BE SWEPT CLEAN OF MUD AND
SHALL BE PERMITTED. TRAVELED PORTIONS OF ROADWAYS
NO STOCK PILES, WEEDS, OR GROWTH AROUND EQUIPMENT
THE CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES.
20.
POSTS. REPLACE DAMAGED SIGNS OR POSTS IN KIND.
DURATION OF CONSTRUCTION. DO NOT DAMAGE SIGNS OR
TRAFFIC SIGNS SHALL REMAIN IN PLACE AND VISIBLE FOR THE
21.
MATERIAL.
CONTRACTOR SHALL VERIFY PAVEMENT THICKNESS AND
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
ASSOCIATED WITH PAVEMENT REMOVAL AND RESTORATION
PAVEMENT SHALL BE RECUT TO NEAT LINES. ALL COSTS
BY THE CONTRACTOR BEYOND THE ORIGINAL SAW CUT, THE
LINES. IF DURING CONSTRUCTION, THE PAVEMENT IS DAMAGED
SHALL BE SAW CUT TO FULL DEPTH AND IN NEAT STRAIGHT
WHERE PAVEMENTS OR DRIVES ARE DISTURBED, THE PAVEMENT
22.
23.
24.
OFFICER.
IN KIND UNLESS OTHERWISE DIRECTED BY THE CONTRACTING
MUST BE REMOVED FOR PROJECT COMPLETION, REPLACE THEM
IF CURBS AND/OR GUTTERS, SIDEWALKS, OR CONCRETE PADS
25.
MATCH EXISTING GRADE UNLESS NOTED OTHERWISE.
WHEN BACKFILLING AND REPLACING SURFACE FEATURES,
26.
CONTRACTING OFFICER.
REPLACE TREES AND SHRUBS IN KIND OR AS DIRECTED BY THE
SEED ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS.
29.
OR DAMAGED BY THE WORK.
BENCHMARKS AND MONUMENTS THAT MAY BE DISTURBED
TO ORIGINAL LOCATION AND ELEVATION ALL PERMANENT
PERMANENT AND TEMPORARY BENCHMARKS, AND RESTORING
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL
THE RECORDS DEPARTMENT IN BUILDING 30011. THE
BENCHMARK INFORMATION AT WPAFB MAY BE AVAILABLE FROM
GENERAL NOTES
STEAM PIT (MANHOLE)
1.
3.
RADIAL FORCES.
GASKET AND TO PREVENT GASKET "CREEP" RELAXATION FROM
MACHINED INTO THE FLANGE’S FACE TO FACILITATE SEATING OF
PTFE ISOLATING GASKETS SHALL HAVE CONCENTRIC GROOVES
FLANGES USED WITH SPIRAL WOUND METALLIC GASKETS AND
4.
5.
6.
DRAWINGS.
WITH THE NOTES ON THIS SHEET, SPECIFICATIONS, AND
APPURTENANCES, FITTINGS, AND DEVICES REQUIRED TO COMPLY
FITTINGS AS SHOWN ON BOTH OR ONE VIEW, AND ANY
CONTRACTOR SHALL PROVIDE ALL APPURTENANCES AND
ON BOTH PLAN AND SECTION VIEWS OF STEAM PITS. THE
NOT ALL APPURTENANCES AND FITTINGS ARE SHOWN/LABELED
1.
GENERAL ENVIRONMENTAL NOTES
2.
3.
CONSIDERED INCIDENTAL TO THE PROJECT.
ALL PERMIT FEES. COSTS FOR PERMITS SHALL BE
IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO PAY
REQUIRED FOR THE PERFORMANCE OF THIS CONTRACT.
THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS
4.
FROM THE WATER MAIN.
ADDITIONALLY THE ELECTRIC MUST BE A MINIMUM OF 5 FEET
LINE, AND 18 INCHES VERTICAL DISTANCE FOR CROSSOVER.
MINIMUM OF 10 FEET HORIZONTAL FROM A STORM OR SANITARY
EXISTING LINE. THE NEW WATER MAIN MUST BE INSTALLED A
TO BE INSTALLED, INCLUDING TAPPING INTO OR REROUTING AN
A PLANS APPROVAL MUST BE SUBMITTED IF A WATER MAIN IS
5.
7.
8.
1.
REQUIREMENTS ON NON-MAJOR STREETS.
OBLIGATION OF THE CONTRACTOR TO FOLLOW THESE
PLANS FOR ONLY MAJOR STREETS DOES NOT RELIEVE THE
SHALL COMPLY WITH FHWA AND ODOT MUTCD. SUBMITTAL OF
ON ALL MAJOR STREETS. ALL ROAD CLOSURES AND DETOURS
PROPOSED SIGNS, SIGN LOCATIONS, BARRICADES, AND DETOURS
PER SPECIFICATION SECTION 01015. THIS PLAN SHALL SHOW ALL
THE CONTRACTOR SHALL SUBMIT A TRAFFIC MAINTENANCE PLAN
TRAFFIC MAINTENANCE NOTES
2.
AT ALL TIMES.
MAINTAIN ACCESS FOR EMERGENCY VEHICLES TO ALL FACILITIES
3.
REPLACED AS PART OF THIS CONTRACT.
ALL PAVEMENT MARKINGS AFFECTED BY THIS WORK SHALL BE
MANHOLEMH
VACUUM CONDENSATE RETURN
VITRIFIED CLAY PIPE
PUMPED RETURN
REINFORCED CONCRETE PIPE
PUMPED CONDENSATE RETURN
VCR
VCP
UNK
TRANS
TELE
VR
TYP
PCR
SAN
RCP
STM
STA
STL
PR
UNKNOWN
TYPICAL
TRANSFORMER
TELEPHONE
SANITARY
STATION
STORM
STEEL
ABOVE FINISHED FLOOR
CORRUGATED METAL PIPE
CONCRETE CULVERT PIPE
CAST IRON PIPE
FINISHED FLOOR ELEVATION
EXPANSION JOINT
HIGH PRESSURE RETURN
GALVANIZED IRON PIPE
LOW PRESSURE RETURN
HIGH PRESSURE STEAM
GND
HPR
LPR
HPS
MIN
INV
F.F.EL.
ELEV
FLR
GIP
EJ
GROUND
INVERT
MINIMUM
ELEVATION
ELECTRIC
FLOOR
GAS
CCP
CMP
CONC
DIA
ACM
AFF
BOTTOM
DIAMETER
CONCRETE
DRAWING
CREOSOTED WOOD DUCTCWD
FIBER DUCTFD
MULTIPLE CLAY DUCTMCD
BD
BDV
BLOWDOWN
BLOWDOWN VALVE
CONDENSATE PUMPED RETURNCPR
DWG/DRWG
CI/CIP
LN LINE
BTM/BOT
ST STEAM TRAP
GAL GALLON
m mm
METERS
MILLIMETERS
APPROX APPROXIMATELY
INCHESIN
SPEC SPECIFICATION
ABBREVIATION LEGEND
INFORMATION AS REQUIRED.
SUBMIT SHOP DRAWINGS WITH ANY REVISIONS OR ADDITIONAL
SUPPORT DISTANCES, LOCATION OF ANCHORS, ETC.) AND
ELBOWS, EXPANSION LOOP SIZES, EXPANSION TYPE PIPE
MANUFACTURER (SUCH AS CONDUIT SIZE AT EXPANSION
CONTRACTOR SHALL VERIFY CONDUIT DETAILS WITH THE
INSTALLATION ARE PROVIDED FOR REFERENCE ONLY. THE
DETAILS PERTAINING TO DIRECT BURIED CONDUIT DESIGN OR
STEAM PITS.
WHEREVER ANCHOR IS SHOWN WITHIN 3’ OUTSIDE THE WALL OF
ON DIRECT BURIED CONDUITS, END SEALS SHALL BE USED
18.
CONDITIONS, INCLUDING RESTORING DAMAGED TURF.
REQUIRED TO RESTORE WORK LOCATIONS TO ORIGINAL
THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIAL
30.
31.
32.
VACUUM CONDENSATE RETURN
11.
CONDITIONS AND THAT SHOWN ON THE PLANS.
LOCATIONS AND ANY DISCREPANCIES BETWEEN ACTUAL
DOCUMENTS SHALL SHOW REVISED STEAM/CONDENSATE LINE
DOCUMENTS FOR CONSTRUCTION PURPOSES. RECORD
CONDITIONS. THE CONTRACTOR SHALL NOT USE RECORD
CHANGE ORDERS, AND FIELD CHANGES DUE TO LATENT
GOVERNMENT ONE RECORD COPY OF DRAWINGS, SPECIFICATIONS,
THE CONTRACTOR SHALL MAINTAIN AT THE JOB SITE FOR THE
12.
THE CONTRACTING OFFICER PRIOR TO FINAL INSPECTION.
DETAILED AS-BUILT DRAWINGS SHALL BE TURNED OVER TO
INFORMATION SHALL BE RECORDED WITH RED MARKING PENS.
CONCEALED UNTIL REQUIRED INFORMATION IS RECORDED. ALL
WITH THE CONSTRUCTION PROGRESS. NO WORK SHALL BE
THE CONTRACTOR SHALL RECORD INFORMATION CONCURRENTLY
13.
AT THE CONTRACTOR’S EXPENSE.
REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER
MUST BE IN WRITING AND ANY RESULTING DAMAGE MUST BE
CIRCUMSTANCES ARE INVOLVED. GRANTING OF EXCEPTIONS
CONTRACTING OFFICER WHERE SHORT DISTANCES AND SPECIAL
STREETS OR ROADS. EXCEPTIONS MAY BE GRANTED BY THE
NON-RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON
14.
PROJECT.
AMENDMENTS THERETO DURING THE PERFORMANCE OF THIS
OCCUPATIONAL SAFETY AND HEALTH ACT AND ALL
SOLELY RESPONSIBLE FOR COMPLYING WITH THE
THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL BE
15.
MATERIALS.
VERIFY ALL REQUIRED DIMENSIONS PRIOR TO ORDERING THE
ALL DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD
16.
ANY PREVIOUSLY EXISTING PAVEMENT MARKINGS IN KIND.
REPLACING PAVEMENT, CONTRACTOR SHALL REPAINT TO MATCH
REMOVED/DISTURBED FOR STEAM LINE REPLACEMENT. AFTER
CONTRACTOR SHALL REPLACE ALL ASPHALT PAVEMENT
3’ FROM WALLS.
UNLESS OTHERWISE INDICATED, ANCHOR LOCATIONS SHALL BE
REFER TO PLAN AND PROFILE SHEETS FOR ANCHOR LOCATIONS.
OFFICER.
COORDINATION WITH THE GAS COMPANY AND CONTRACTING
REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR
INSTALLATION SHALL COMPLY WITH LOCAL GAS COMPANY
HOWEVER, ANY RELOCATED GAS LINE MATERIALS AND
STEAM SYSTEM ARE NOT ANTICIPATED ON THIS PROJECT.
GAS LINE INTERFERENCES TO THE PROPOSED DIRECT BURIED
9.
G
TIME THE WORK IS TO BE ACCOMPLISHED.
ALL FEDERAL, STATE AND LOCAL REGULATIONS IN EFFECT AT THE
ALL OTHER APPLICABLE SPECIFICATION SECTIONS AS WELL AS
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 AND
ALL ENVIRONMENTAL WORK SHALL BE CONDUCTED IN
SECTION 01 02 20 PARAGRAPH 3.04.D.
IS DISTURBED OR A NEW ONE INSTALLED, PER SPECIFICATION
A PERMIT TO INSTALL (PTI) IS REQUIRED WHEN A SANITARY LINE
SPECIFICATION SECTION 02 09 00.
ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH
TO DISTURBING LEAD CONTAINING PAINT, REMEDIATION OR
ALL PAINTED SURFACES CONTAIN LEAD. ANY WORK PERTAINING
9.
GRASSY AREA AND NOT DIRECTLY INTO A STORM SEWER.
IMMEDIATE AREA, THE WATER SHOULD BE DISCHARGED TO A
A SANITARY SEWER. IF A SANITARY SEWER IS NOT IN THE
OR PUMPED OUT OF STEAM MANHOLES SHALL BE DISCHARGED TO
ANY WATER PUMPED OUT OF TRENCH AS PART OF DEWATERING,6.
THE CONTRACTING OFFICER.
SHALL IMMEDIATELY STOP WORK IN THAT AREA AND NOTIFY
IDENTIFIED ON DRAWINGS ARE ENCOUNTERED, THE CONTRACTOR
IF ADDITIONAL SUSPECT ASBESTOS CONTAINING MATERIALS NOT
1 OCTOBER.
CONDENSATE RETURN LINES SHALL BE OPERATIONAL BY
THE HEATING SEASON IS COMPLETED. ALL STEAM &
ACCOMPLISHED BETWEEN 1 MAY AND 1 OCTOBER OR WHEN
EXISTING ACTIVE STEAM LINES ARE DISTURBED SHALL BE
ANY CONSTRUCTION WORK ON THIS PROJECT WHERE THE
17.
AND 02 08 10. REFER TO GENERAL NOTES #16, #17 & #18 THIS SHT.
WITH THE APPLICABLE REQUIREMENTS OF SPECIFICATION 02 08 50
ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE
EXPOSED AND UNDERMINED DURING CONSTRUCTION.
WATER, STORM, SANITARY, AND GAS UTILITY LINES THAT ARE
TEMPORARY SUPPORT OF ELECTRICAL AND COMM DUCT BANKS,
THE CONTRACTING OFFICER. THE CONTRACTOR SHALL PROVIDE
REQUIRED SHALL BE COORDINATED WITH AND APPROVED BY
ANY NECESSARY ADJUSTMENTS. ALL UTILITY OUTAGES
DETERMINE THE EXACT ELEVATION OF THE UTILITY AND MAKE
ADVANCE OF LAYING PIPE IN ORDER THAT THE ENGINEER MAY
UTILITIES NOTIFY THE CONTRACTING OFFICER SUFFICIENTLY IN
POTENTIAL GRADE CONFLICTS MIGHT OCCUR WITH EXISTING
WHERE NECESSARY DUE TO CLOSE CLEARANCE. WHERE
BY HAND AROUND UTILITIES WHOSE LOCATIONS ARE KNOWN OR
OF THE NEW DIRECT BURIED CONDUITS. EXCAVATION SHALL BE
CONDUITS, ECT., WHICH WILL INTERFERE WITH INSTALLATION
ALL UTILITIES INCLUDING PIPING, VALVES, FITTINGS, SUPPORTS,
THE CONTRACTOR SHALL REMOVE AND REPLACE OR RELOCATE
27.
28.
2.
WITH UNIONS (NOT SHOWN ON STEAM PIT DETAILS).
AROUND ALL NEW HPS BUTTERFLY VALVES 4" AND LARGER
1-1/2" BYPASS LINES WITH GLOBE VALVES SHALL BE INSTALLED
7.
8.
CA COMPRESSED AIR
ELEC; E
33.
10.
ASBESTOS CONTAINING MATERIALS
DURING THIS PROJECT.
NO ASBESTOS CONTAINING MATERIALS (ACM) MAY BE INSTALLED
SECTION 26 42 14.00 10.
FUSION BONDED EPOXY SYSTEMS ACCORDING TO SPECIFICATION
PROVIDE CATHODIC PROTECTION FOR ALL STEEL CASING,
PERFORMING OPERATIONAL TEST ACCORIDNG TO SPECIFICATIONS.
CONTRACTOR SHALL CLEAN AND FLUSH PIPING PRIOR TO
WITH SPECIFICATION SECTION 02 08 50.
MATERIALS (ACM), AND SHALL BE TREATED IN ACCORDANCE
LINES ARE PRESUMED TO CONTAIN ASBESTOS CONTAINING
ALL EXISTING DIRECT BURIED STEAM AND CONDENSATE RETURN
ALL OTHER TYPES AND CASING COATINGS ARE UNNACCEPTABLE.
REFER TO SPECIFICATION SECTION 33 63 13 AND DRAWING DETAILS.
PROVIDE STEEL CASING WITH FUSION BONDED EPOXY TYPE.
FOR DIRECT BURIED STEAM & CONDENSATE RETURN PIPING,
INSTALLED A MINIMUM OF 8" FROM PIT/TRENCH FLOOR.
PIPING AND FITTINGS (EXCEPT FOR BLOW DOWN LINE) SHALL BE
A CHANCE TO COOL BEFORE ENTERING THE SUMP PUMP. ALL
AWAY FROM THE SUMP PIT (IN ORDER TO GIVE THE CONDENSATE
SHALL BE ROUTED TO DISCHARGE TO AN APPROPRIATE CORNER
THE LOWEST PIPING POINTS IN STEAM PITS. BLOW DOWN LINES
BLOW DOWN LINES AND DRAIN VALVES SHALL BE LOCATED AT
INDICATED ON STEAM PIT PLANS AND PER DETAIL B/M203.
GATE VALVES SHALL BE PROVIDED ON CPR LINES AS
SHALL BE PROVIDED ON HPS LINES, AND 1" DRAIN LINES WITH
1-1/2" BLOW DOWN (MANUAL DRAIN) LINES WITH GATE VALVES
SHT. M301 FOR STEAM TRAP SCHEDULE.
REFER TO STEAM TRAP STATION DETAIL B/M203 AND
ROUTING.
LINE OR MANHOLE. SEE CIVIL DRAWINGS FOR DISCHARGE PIPE
SUMP PUMP SHALL DISCHARGE INTO THE NEAREST SANITARY
SUMP PUMP SHALL BE PROVIDED IN NEW STEAM PIT S-218.
GENERAL NOTES
IN HIS APPROVED PRODUCT BROCHURE.
ANCHOR BLOCKS, AND EXPANSION COMPENSATION AS DESCRIBED
PITS, INCLUDING SYSTEM WALL PENETRATIONS END SEALS,
THE DESIGN DETAILS OF THE CONDUIT SYSTEM BETWEEN STEAM
THE DIRECT BURIED CONDUIT SYSTEM SUPPLIER SHALL PROVIDE
ACCORDANCE WITH SPECIFICATION SECTION 02 08 10.
INDICATED ON PROJECT DRAWINGS, AND SHALL BE TREATED IN
ASBESTOS CONTAINING MATERIALS (ACM) UNLESS OTHERWISE
640 MECHANICAL ROOM ARE PRESUMED TO CONTAIN
INSIDE STEAM PITS (MANHOLES), 642 TUNNEL, AND
ALL EXISTING STEAM AND CONDENSATE RETURN LINES
PITS AND TUNNELS PER PROJECT SPECIFICATIONS.
ALL NEW STEAM AND CONDENSATE RETURN PIPING INSIDE
HOWEVER, INSULATION AND JACKET SHALL BE PROVIDED ON
PIPE INSULATION IS NOT SHOWN INSIDE PITS AND TUNNELS.
SEE SHT. M203 FOR TYPICAL SUPPORT DETAILS.
ADEQUATE STRUCTURAL SUPPORT FOR PIPING AND FITTINGS.
AND 640 PIPING TUNNEL WHERE REQUIRED TO ASSURE
NEW PIPE SUPPORTS SHALL BE PROVIDED IN NEW PIT S-218
A T E
OF O
H
I O
P R
O F
E S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
937-257-9009 FOR ADDITIONAL INFORMATION.
EMAIL AT ZACHARY.OLDS@WPAFB.AF.MIL OR BY PHONE AT
PLEASE CONTACT THE 88 ABW/CEANQ WATER PM ZACK OLDS BY
EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE.
FOR PROJECTS THAT DISTURB LESS THAN AN ACRE OF SOIL, AN
POLLUTION PREVENTION PLAN (SWPPP) APPROVED BY 88 ABW/CEANQ.
ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER
INTENT (NOI) MUST BE APPROVED BY THE OHIO EPA PRIOR TO
PROJECTS THAT DISTURB MORE THAN AN ACRE, A NOTICE OF
STAGING AREAS, WILL REQUIRE EROSION CONTROL MEASURES. FOR
SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT
11.
12.
13.
REPLACEMENT LISTING OR ADDITIONAL INFORMATION.
OR BY PHONE AT 937-257-4857 FOR AN ACCEPTABLE TREE
DARRYN WARNER BY EMAIL ATDARRYN.WARNER@WPAFB.AF.MIL
BE REPLACED FOR EVERY ONE TREE REMOVED. CONTACT
RESTRICTIONS. ALSO, IT IS REQUESTED THAT THREE TREES
THE ENDANGERED SPECIES INDIANA BAT NESTING SEASON
MAY ONLY BE CUT FROM OCTOBER 1 THROUGH 31 MARCH IAW
RESOURCES PM DARRYN WARNER FOR APPROVAL. TREES
TREES TO BE REMOVED TO THE 88 ABW/CEANQ NATURAL
PRIOR TO REMOVING ANY TREES PLEASE SUBMIT A LIST OF
DALTON, AT 937-257-5060 OR DAVE.DALTON@WPAFB.AF.MIL.
FOR ADDITIONAL INFORMATION, CONTACT THE RECYCLING PM, DAVE
THEM) AND CAN PROVIDE A 30 YARD CONTAINER FOR ALL METAL.
ONCE ANY ASBESTOS IS REMOVED (IF THEY HAVE ASBESTOS ON
THE WPAFB RECYCLING CENTER WANTS THE PIPE TO RECYCLE
DUMPSTER AT 937-925-5060 OR DAVE.DALTON@WPAFB.AF.MIL.
RECYCLING CENTER. CONTACT DAVE DALTON TO RESERVE A
ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE
DAVE.DALTON@WPAFB.AF.MIL
THE RECYCLING PM, DAVE DALTON, AT 937-257-5060 OR
THREE MONTHS PRIOR. FOR ADDITIONAL INFORMATION, CONTACT
APRIL 7, JULY 7, OCTOBER 7, AND JANUARY 7 COVERING THE
THE QUARTERLY SUMMARY REPORTS SHALL BE RECEIVED ON
DEMOLITION MATERIALS LAND-FILLED OR OTHERWISE DISPOSED.
RECYCLED AND (2) THE TONNAGE OF CONSTRUCTION AND
TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS
IAW WPAFB SPECIFICATION SECTION 01 02 20 STATING (1)THE
REPORT TO THE 88 ABW/CEANP RECYCLING PM, DAVE DALTON,
THE CONTRACTOR SHALL SUBMIT A QUARTERLY SUMMARY
WHAT MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-IN.
RECYCLING PROGRAM MANAGER AT 937-257-5060 TO CONFIRM
WITH WPAFB SPECIFICATION SECTION 01 02 20. CONTACT WPAFB
TURNED INTO THE WPAFB RECYCLING CENTER IN ACCORDANCE
AND ARE NOT SCHEDULED FOR OFF-SITE RECYCLING CAN BE
ARE COST EFFECTIVELY SEGREGATED FROM DEMOLITION DEBRIS
USE TO REDUCE WASTE DISPOSAL. RECYCLABLE MATERIALS THAT
THE WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR
14.
FROM WPAFBI 40-201 AND WPAFB SPECIFICATION SECTION 01 02 20.
DAYS PRIOR TO BEING BROUGHT ONTO WPAFB. THIS REQUIREMENT IS
THE WPAFB RADIATION SAFETY OFFICER A MINIMUM OF 30
INCLUDING MOISTURE DENSITY GAUGES, MUST BE APPROVED BY
ANY USE OF RADIOACTIVE MATERIALS BY THE CONTRACTOR,
OF
DATEDRAWNDESIGNED CHECKED
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES S-219 TO F/20642
N
SCALE: 1’’= 30’-0"
0 30’30’ 10’20’
BUILDING
BUILDING
Q
R E
E T
PROPOSED STEAM LINE
STEAM LINE
PROPOSED
STEAM LINE
PROPOSED
PLAN
TRAFFIC MAINTENANCE/ PHASING
TM01
BARRICADES
TEMPORARY
BARRICADES
TEMPORARY
BARRICADES
TEMPORARY
BARRICADES
TEMPORARY
BARRICADES
TEMPORARY
BARRICADES
TEMPORARY
C P
R
S-218
STEAM PIT
A T E
OF O
H
I O
P R
O F
E S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
PHASE II
PHASE I
PHASE III
C
P
R
C
P
R
C
P
R
C P RC P R
C
P
R
C P R
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES S-219 TO F/20642
N
SCALE: 1’’= 30’-0"
0 30’30’ 10’20’
BUILDING
BUILDING
S te a m
L in e
Steam Line
Tree
Tree
Tree
Tree
LPLP
LP
Underground Electric
Tree
Landscaping
MH
San.
MH
Stm.
CBStorm Line
S to rm
L in e
MH
Stm.
MH
Elec.
Box Elec.
LP
Sanitary Sewer
Storm Line
U nd er gr ou nd E le c.
St or m L in e
S a n it a r y e w e r
U nd er gr ou nd
El ec tr ic
CB
CB
Box Elec.
LP
S t e a m
L in e
G s e
U n d e r g r o u n d
E le c
W a t e
M in
G e
Com m . Line
LPLP
FH, & WV
Water Main
Sidewalk
Wall Retaining
CB
CB
CB
CB
Storm Line
S t o e
Gas Line
Drive Conc.
WV
WV
CB
CB
WV
LP
PP
Tree
Tree
Tree
CB
CB
Box Elec. Wall
Retaining
LP
LP
LP
LP
LP
LP
CB
CBCBCBCB
CB
Box Elec.
Box Elec.
LP
St or m L ine
S t o e
Underground Elec.
Steam Line
S t e e
LP
MH
Elec. Tree
(5) Tree
Storm Drain
Storm Drain
Storm Line
Gas Line
S to rm
L in e
Tree
Tree
Tree
Tree
Sidewalk
Sign
S id e w a lk
MH
San.
Steam Line
CO
CB
Tree
Tree
Tree
LP
LP
Box Elec.
CB
CB
Tree LP
FH
MH
Tele.
Steam Tunnel
Lid
Lid
Lid Lid
Lid
Lid
Lid
Mailbox
Tree
Sign
Steps
Steps
Steps
Steps
PIV
PIV
Stairs
R E
E T
S H E E T
C
SHEET C702
SHEET C704
SHEET C704
SHEET C702
S H E E T
C
Sidewalk
EXISTING SITE PLAN
OVERALL
C100
S-218 Steam Pit
A T E
OF O
H
I O
P R
O F
E S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
C
P
R
C P RC P RC P R
C P RC P R
C
P
R
C P R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES S-219 TO F/20642
N
SCALE: 1’’= 30’-0"
0 30’30’ 10’20’
BUILDING
BUILDING
S H E E T
C
SHEET C703
SHEET C705
SHEET C705
SHEET C703
S H E E T
C
R E
E T
PROPOSED STEAM LINE
STEAM LINE
PROPOSED
STEAM LINE
PROPOSED
C101
PROPOSED SITE PLAN
OVERALL
TO EXISTING SAN. MH
(SUMP DRAIN)
SANITARY LINE
CONNECT 2"
S-218
STEAM PIT
NEW
A T E
OF O
H
I O
P R
O F
E S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
C P RC P RC P RC P R
C P RC P RC P R
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
0 10
GRAPHIC SCALE IN FEET
30 40 50
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
2 9
R
C P R C P R C P R C P R
C P RC P RC P R C P R
C P R
C P R
C P R
C P R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
1+
C
P
R
C
P
R
C
P
R
SCALE: 1:10
0 10 20 40
N
C700
Existing Grade
S E E
S H E E T
C
M A
TC
H
L
IN
E
.0
S
H
E
M A
T
IN
E
.0
Comm. Line Underground
Gas Line
Underground Comm.
6" Water
Gas Line
Electric Underground
Existing Grade
Tunnel Lid
Tunnel Lid
Mailbox
Bush
Bush Bush
Bush
Bush
Bush
S to rm
Lin e
G a s
L in e
Storm Line
Tree
Guy
LP
FH
MH
Tele.
Tree
WV
WV
WV
WV
WV
G a s
L in e
C o m m u n ic a ti o n
L in e
S to rm
Li n e
W a te r
L in e
U n d e rg ro u n d
E le c tr ic
Li n e
Inv 12" (E)= 968.35 Inv 12" (S)= 968.60 Top= 970.35
CB
Inv 12" (E)= 967.13 Inv 12" (W)= 969.33 Top= 972.63
CB
Inv 12" (E)= 970.55 Top= 973.55
CB
LP
Box Elec.
Conn.
FDC
C o m m u n ic a t io e
Q
S
TR
E E T
S id e w a lk
S id e w a lk
Tree
Tree
Tree
Tree
G a s
L in e
W a te r
L in e
Inv 12" (W)= 961.00 Top= 969.82 Storm MH
Box Elec.
Inv 12" (N)= 968.94 Top= 970.92
CB
W a te r
L in e
1.
.9
1.
.3
.9
.5
.6
0+00 1+00
.7
.4
2+00
.7
.0
Q Street Sidewalk
Fire Line
REPLACE PAVEMENT
REPLACE PAVEMENT
REPLACE CURB
REPLACE CURB
REPLACE SIDEWALK
REPLACE CURB
(CONTAINS ASBESTOS)
STEAM LINE
REMOVE EXISTING
& CURB RAMP
REPLACE WALK
S-218 Steam Pit
REMOVE
Chamber Existing Sump
REMOVE
Lid Tunnel
Tunnel Lid
H P S
P C R
(2
H P S
L P C
H P S
C P R
STEAM LINES IN PLACE
ABANDON EXISTING
CUT AND CAP
END REMOVAL
CUT AND CAP
END REMOVAL
CUT AND CAP
REMOVALEND
4" HPS
ACTIVE
TO REMAIN
STEAM LINES
S te a m
Tu n n e l
(CONTAINS ASBESTOS)
(2) CONDENSATE LINES
1 STEAM LINE &
REMOVE EXISTING
STA. 0+00.00 TO 2+50.00
EXISTING/ DEMOLITION PLAN AND PROFILE
Riser Elec.
REMOVE
Pit Sump
REMOVE
GENERAL NOTES:
Trench Shallow
REPLACE
FOR ANY CONFLICTS.
CONSTRUCTION OF STEAM LINE
EXISTING UTILITIES PRIOR TO
3. CONTRACTOR TO VERIFY ALL
SITE DETAILS.
2. REFER TO SHEET C706 FOR
DETAILS.
PLANS FOR STEAM LINE & PIT
1. REFER TO MECHANICAL
(CONTAINS ASBESTOS)
CONDENSATE LINE
STEAM LINE AND
REMOVE EXISTING
(CONTAINS ASBESTOS)
CONDENSATE LINE
STEAM LINE AND
REMOVE EXISTING
(CONTAINS ASBESTOS)
CONDENSATE LINE
STEAM LINE AND
REMOVE EXISTING
1 1/2" PCR
1 1/2" PCR
minimal excvavation) around pit for (Provide shoring S-218 Steam Pit
REMOVE
H P S
C P R
(CONTAIN ASBESTOS)
STEAM LINES IN PLACE
ABANDON EXISTING
(CONTAINS ASBESTOS)
CONDENSATE LINE
STEAM LINE AND
REMOVE EXISTING
(CONTAINS ASBESTOS)
STEAM LINES IN PLACE
ABANDON EXISTING
A T E
OF O
H
I O
P R
O F
E S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
4" CPR
6" HPS
ISLAND.
LANDSCAPING WITHIN
REMOVE & REPLACE
RAMP
REPLACE HC
DURING CONSTRUCTION
PROTECT EXISTING CB
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
0 10
GRAPHIC SCALE IN FEET
30 40 50
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
2 9
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
1+
CPR CPR CPR CPR CPR
C P
R
CPR
C P
R
CPR CPR CPR CPR CPR CPR CPR
C P
R
C P
R
C P
R C P
R
SCALE: 1:10
0 10 20 40
N
C701
PROJECT
BEGIN
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
Existing Grade
S E E
S H E E T
C
M A
TC
H
L
IN
E
.0
S
E
M A
T
E
.0
Comm. Line UndergroundGas Line
Underground Comm.
Gas Line
Electric Underground
& 4" CONDENSATE LINE
NEW 6" HIGH PRESSURE STEAM LINE
& 4" CONDENSATE LINE
NEW 6" HIGH PRESSURE STEAM LINE
Existing Grade
Tunnel Lid
Tunnel Lid
Mailbox
BushBush
Bush
Bush
Bush
Bush
S to rm
Lin e
G a s
L in e
Storm Line
Tree
Guy
LP
FH
MH
Tele.
Tree
WV
WV
WV
WV
G a s
L in e
C o m m u n ic a ti o n
L in e
S to rm
Li n eW a te r
L in e
U n d e rg ro u n d
E le c tr ic
Li n e
Inv 12" (E)= 968.35 Inv 12" (S)= 968.60 Top= 970.35
CB
Inv 12" (E)= 967.13 Inv 12" (W)= 969.33 Top= 972.63
CB
LP
Box Elec.
Conn.
FDC
C o m m u n ic a t io e
Q
S
TR
E E T
S id e w a lk
S id e w a lk
Tree
Tree
Tree
Tree
G a s
L in e
W a te r
L in e
Inv 12" (W)= 961.00 Top= 969.82 Storm MH
& 4" CONDENSATE LINE
NEW 6" HIGH PRESSURE STEAM LINE
Box Elec.
& 4" CONDENSATE LINE
NEW 6" HIGH PRESSURE STEAM LINE
F ire
L in e
1.
.9
1.
.3
.9
.5
.6
0+00 1+00
.7
.4
2+00
.7
.0
Q Street Sidewalk
Fire Line
NEW PAVEMENT
CURB
NEW
CURB
NEW
PAVEMENT
NEW SIDEWALK
S-218
NEW STEAM PIT
DURING CONSTRUCTION
PROTECT CB
H P S
C P R
Place. Cut And Cap.
To Be Abandoned In Condensate Line Existing Steam And
6" HPS
4" CPR
(2
H P S
L P S
Lid Tunnel
S te a m
Tu n n e l
CURB
NEW
(EL-1)
LOOPS
EXPANSION
(EL-1)
EXPANSION LOOPS
SPECS.
REFER TO MECHANICAL
CONCRETE BLOCKING
SPECS.
REFER TO MECHANICAL
CONCRETE BLOCKING
Place. Cut And Cap.
To Be Abandoned In
Condensate Line Existing Steam And
Place. Cut And Cap.
To Be Abandoned In
Condensate Line Existing Steam And
CATCH BASIN
REMOVE AND REPLACE
STA 0+00.00 TO 2+50.00
PROPOSED PLAN AND PROFILE
S-218
NEW STEAM PIT
GENERAL NOTES:
TRENCH
SHALLOW
NEW
FOR ANY CONFLICTS.
CONSTRUCTION OF STEAM LINE
EXISTING UTILITIES PRIOR TO
3. CONTRACTOR TO VERIFY ALL
SITE DETAILS.
2. REFER TO SHEET C706 FOR
DETAILS.
PLANS FOR STEAM LINE & PIT
1. REFER TO MECHANICAL
C.O.
LINE
WATER
LOWERED
6" Water
LOWERED
FOR CONTINUATION.
SEE SHEET C101
(SUMP DRAIN)
2" SANITARY LINE
CURB
NEW
PAVEMENT
NEW
H P S
C P
A T E
OF O
H
I O
P R
O F
E S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
6" HPS
4" CPR
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
0 10
GRAPHIC SCALE IN FEET
30 40 50
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
C P R C P R
C P R C P R C P R
C P R
C P R
C P R
C P R
C P R
C P R
C P R
C P R
C P R
5+00
5+00
C P R
P
R
C
P
R
C
P
R
C P R C P R
C P R
C P R
C P RC P RC P R
SCALE: 1:10
0 10 20 40
N
C702
Underground Electric
6" Water
BUILDING
.3
.4
.0
.7
.1
.1
.4
.5
4+003+00
Existing Grade
Existing Grade
Tree
Tree
Tree
Tree
Tree
Tree
Tree
Tree
U n d e r g r o u c t r ic
Gas Line
Steps (8) Sidewalk Sidewalk
Gravel
Valve
PIV
Steps (15)
Wall Conc.
Equipment Mech.
Generator Diesel
CO
Inv= 957.70 Top= 960.98
CB
Wall Conc.
LP LPUnderground Electric
Inv 12" (S)= 963.47 Top= 967.47
CB
Storm Line
S id e w a lkS t o e S to e
P la n t e r
C o n c
BUILDING
S
E
M A
T
.0
S
E
M A
T
.0
Fire Line
Water Line Gas Line
OF STEAM LINE
BRICK WALL 3.00’ LT
of Steam Line Gas Line 5.00’ LT of Steam Line Gas Line 5.00’ LT of Steam Line 6" Water 3.25’ LT of Steam Line 6" Water 3.25’ LT
S
E
M A
T
.0
S
E
M A
T
.0
LOOP IN PLACE
ABANDON STEAM
3" CPR
4" HPS
(CONTAINS ASBESTOS)
(3) CONDENSATE LINES
(2) STEAM LINES &
REMOVE EXISTING
CUT AND CAP
END REMOVAL
4" HPS
STA. 2+50.00 TO 4+58.00
EXISTING/ DEMOLITION PLAN AND PROFILE
GENERAL NOTES:
FOR ANY CONFLICTS.
CONSTRUCTION OF STEAM LINE
EXISTING UTILITIES PRIOR TO
3. CONTRACTOR TO VERIFY ALL
SITE DETAILS.
2. REFER TO SHEET C706 FOR
DETAILS.
PLANS FOR STEAM LINE & PIT
1. REFER TO MECHANICAL
(SEE SHEET M101)
(CONTAINS ASBESTOS)
CONDENSATE LINES
STEAM LINES AND
REMOVE EXISTING (CONTAINS ASBESTOS)
CONDENSATE LINES
STEAM LINES AND
REMOVE EXISTING
1 1/2" HPS
1 1/2" CPR
(CONTAINS ASBESTOS)
CONDENDSATE LINES
STEAM LINES AND
REMOVE EXISTING
(CONTAINS ASBESTOS)
CONDENSATE LINES
STEAM LINES AND
REMOVE EXISTING
(CONTAINS ASBESTOS)
(2) CONDENSATE LINES
(2) STEAM LINES &
REMOVE EXISTING
AS REQUIRED
REPLACE SIDEWALK
REMOVE &
A T E
OF O
H
I O
P R
O F
E
S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
AS REQUIRED
REPLACE CONC.
REMOVE &
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
0 10
GRAPHIC SCALE IN FEET
30 40 50
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
C P R
CPR CPR CPR
C P
R
C P
R
CPR CPR CPR CPR CPR CPR
5+00
CPR CPR CPR CPR CPR CPR
CPR CPR CPR
C P
R
CPR
C P
R C
P R
C P
R
5+00
C P R
CPR CPR
SCALE: 1:10
0 10 20 40
N
C703
Underground Electric
6" Water
BUILDING
.3
.4
.0
.7
.1
.1
.4
.5
4+003+00
Existing Grade
Tree
Tree
Tree
Tree
Tree
Tree
Tree
Tree
U n d e r g r o u c t r ic
Gas Line
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
Steps (8) Sidewalk Sidewalk
Gravel
Valve
PIV
Steps (15)
Wall Conc.
Equipment Mech.
Generator Diesel
CO
Inv= 957.70 Top= 960.98
CB
Wall Conc.
LP LPUnderground Electric
Inv 12" (S)= 963.47 Top= 967.47
CB
S id e w a lk
S t o e S to e
P la n t e r
C o n c
BUILDING
S
E
M A
T
.0
Fire Line
Water Line
Gas Line
OF STEAM LINE
BRICK WALL 3.00’ LT
of Steam Line Gas Line 5.00’ LT of Steam Line Gas Line 5.00’ LT of Steam Line 6" Water 3.25’ LT of Steam Line 6" Water 3.25’ LT
S
E
M A
T
.0
S
E
M A
T
.0
NEW SIDEWALK
6" HPS
4" CPR
SPECS.
REFER TO MECHANICAL
CONCRETE BLOCKING
STA 2+50.00 TO 4+58.00
PROPOSED PLAN AND PROFILE
SPECS.
REFER TO MECHANICAL
CONCRETE BLOCKING
Place. Cut And Cap.
To Be Abandoned In Existing Steam Loop
RETAINING WALL
SIDEWALK AND
GENERAL NOTES:
FOR ANY CONFLICTS.
CONSTRUCTION OF STEAM LINE
EXISTING UTILITIES PRIOR TO
3. CONTRACTOR TO VERIFY ALL
SITE DETAILS.
2. REFER TO SHEET C706 FOR
DETAILS.
PLANS FOR STEAM LINE & PIT
1. REFER TO MECHANICAL
& 4" CONDENSATE LINE
NEW 6" HIGH PRESSURE STEAM
DURING CONSTRUCTION
PROTECT WALL FOOTING
& 3" CONDENSATE LINE
NEW 4" HIGH PRESSURE STEAM
& 4" CONDENSATE LINE
NEW 6" HIGH PRESSURE STEAM
(EL-2)
LOOPS
EXPANSION
(EL-2)
LOOPS
EXPANSION
RETAINING WALL FOOTING.
TO BACKFILL UNDER
USE FLOWABLE FILL
NEW SIDEWALK
RETAINING WALL
SIDEWALK AND
& 3" CONDENSATE LINE
NEW 4" HIGH PRESSURE STEAM
& 3" CONDENSATE LINE
NEW 4" HIGH PRESSURE STEAM
SCALE 2:1
ENLARGED PROFILE
SCALE 1"=20’
ENLARGED PLAN
Struts Concrete
RETAINING WALL
Struts Concrete
RETAINING WALL FOOTING.
TO BACKFILL UNDER
USE FLOWABLE FILL
RETAINING WALL
& 3" CONDENSATE LINE
NEW 4" HIGH PRESSURE STEAM
SEE ENLARGED PLAN THIS SHEET.
MINIMIZE TRENCH WIDTH.
SHORING WILL BE REQUIRED TO
SPECIAL METHODS & HAND DIGGING.
EXCAVATION IN THIS AREA MAY REQUIRE
BEGINNING CONSTRUCTION.
IN THIS AREA PRIOR TO
EXPLORITORY EXCAVATION REQUIRED
NOTE:
LINES IN TUNNEL
NEW STEAM AND CONDENSATE
REFER TO SHEET M201 FOR
LINES IN TUNNEL
NEW STEAM AND CONDENSATE
REFER TO SHEET M201 FOR
A T E
OF O
H
I O
P R
O F
E
S S
IONAL EN
G I
N E
E R
R E
GISTER
E
PETER
CONCRETE
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
0 10
GRAPHIC SCALE IN FEET
30 40 50
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
964 963
C P R C P R C P R
5+00
5+00
C P R C P R C P R
C P R
C P R
C P R
C P R
C P R C P R
SCALE: 1:10
0 10 20 40
N C704
.9
.7
.4
.6
.4
.7
.6
.2
.0
6+005+00
S
E
M A
T
.0
PROJECT
END
Tree TreeTreeTreeTree
Sign
Wall Conc.
G e
S to e
MH
Elec.
Electric
Underground
Electric
Underground
LP
LP
LPLP
LP
LP
LP
Steps (21) Electric
Underground
Wall Retaining
Tree
Tree
Tree
Tree
Tree
Tree
St or m L in e
E le c t r ic
U n d e r g r o u n d
Wall Retaining
Inv 10" (N)= 961.33 Top= 963.98
CB
Inv 12" (W)= 951.12 Inv 12" (E)= 951.12 Top= 955.32
CB
Inv 12" (W)= 951.18 Inv 12" (E)= 951.18 Top= 956.23
CB
Inv 12" (W)= 952.17 Inv 12" (E)= 952.17 Top= 956.42
CB
Inv 12" (N)= 955.25 Inv 12" (E)= 955.25 Inv 12" (SW)= 955.25 Top= 966.35
CB
Storm Line Gas Line
Storm Line
BUILDING
BUILDING
Sidewalk
Storm Line
Box Elec.
Line Storm Line Storm
Line Storm
Line Water
Existing Grade
Existing Grade
BUILDING
Gas Line
Electric Underground
Electric Underground
12" Storm
10" Storm
Electric Underground
Gas Line
Electric Underground
S
E
M A
T
.0
LIGHT
REPLACE BOLLARD
REMOVE &
Yard Drain
IN PLACE
STEAM LINES
ABANDON
(CONTAINS ASBESTOS)
STEAM LINES
REMOVE EXISTING
4" HPS
3" CPR
3" HPS
(CONTAINS ASBESTOS)
& (2) CONDENSATE LINES
(2) HIGH PRESSURE STEAM
REMOVE
4" HPS
3" CPR
STA. 4+58.00 TO 6+47.50
EXISTING/ DEMOLITION PLAN AND PROFILE
GENERAL NOTES:
FOR ANY CONFLICTS.
CONSTRUCTION OF STEAM LINE
EXISTING UTILITIES PRIOR TO
3. CONTRACTOR TO VERIFY ALL
SITE DETAILS.
2. REFER TO SHEET C706 FOR
DETAILS.
PLANS FOR STEAM LINE & PIT
1. REFER TO MECHANICAL
1 1/2" CPR
(CONTAINS ASBESTOS)
CONDENSATE LINES
STEAM LINES AND
REMOVE EXISTING
(CONTAINS ASBESTOS)
CONDENSATE LINES
STEAM LINES AND
REMOVE EXISTING
(CONTAINS ASBESTOS)
CONDENSATE LINES
STEAM LINES AND
REMOVE EXISTING
FOR RECONNECTION
SEE SHEET C705
(CONTAINS ASBESTOS)
AND 4" DRIP TRAP.
REMOVE PIPING THROUGH WALL
(CONTAINS ASBESTOS)
& (1) CONDENSATE LINES
(1) HIGH PRESSURE STEAM
REMOVE
CUT AND CAP
END REMOVAL
CUT AND CAP
END REMOVAL
CONCRETE
REMOVE
A T E
OF O
H
I O
P R
O F
E
S S
IONAL EN
G I
N E
E R
R E
GISTER
E
M. Tibbs M. Tuss
05-24-2012PSB
J. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
0 10
GRAPHIC SCALE IN FEET
30 40 50
JAH PSB
PROJECT No. ZHTV 100157
REPLACE STEAM LINES, S-219 TO F/20642
964 963
C P R C P R C P R
CPRCPR
CPR
CPR CPR CPR
C P
R
CPR
CPR CPR CPR
C P
R C
P R
C P
R
C P
R C
P R
C P
R
5+00
CPR CPR CPR CPR CPR CPR CPR
5+00
SCALE: 1:10
0 10 20 40
N C705
.9
.7
.4
.6
.4
.7
.6
.2
.0
6+005+00
S
E
M A
T
.0
PROJECT
END
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
CROSSING
CAUTION UTILITY
Tree TreeTreeTreeTree
Sign
Wall Conc.
G e
S to e
MH
Elec.
Electric
Underground
Electric
Underground
LP
LP
LPLP
LP
LP
LP
Steps (21)
Electric
Underground
Wall Retaining
Tree
Tree
Tree
Tree
Tree
Tree
St or m L in e
E le c t r ic
U n d e r g r o u n d
Wall Retaining
Inv 10" (N)= 961.33 Top= 963.98
CB
Inv 12" (W)= 951.12 Inv 12" (E)= 951.12 Top= 955.32
CB
Inv 12" (W)= 951.18 Inv 12" (E)= 951.18 Top= 956.23
CB
Inv 12" (W)= 952.17 Inv 12" (E)= 952.17 Top= 956.42
CB
Inv 12" (N)= 955.25 Inv 12" (E)= 955.25 Inv 12" (SW)= 955.25 Top= 966.35
CB
Storm Line Gas Line
Storm Line
BUILDING
BUILDING
Sidewalk
Storm Line
Box Elec.
Line Storm
Line Storm
Line Water
Existing Grade
Existing Grade
BUILDING
Gas Line Electric Underground
Electric Underground
12" Storm
10" Storm
Electric Underground
Gas Line
Electric Underground
& 3" CONDENSATE LINE
NEW 4" HIGH PRESSURE STEAM
& 3" CONDENSATE LINE
NEW 4" HIGH PRESSURE STEAM
S
E
M A
T
.0
CONCRETE
NEW
Drain
Yard
4" HPS
3" CPR
& CONDENSATE LINE
NEW HIGH PRESSURE STEAM
Place. Cut And Cap.
To Be Abandoned In
Condensate Line Existing Steam And
SPECS.
REFER TO MECHANICAL
CONCRETE BLOCKING
SPECS.
REFER TO MECHANICAL
CONCRETE BLOCKING
4" HPS
3" CPR
STA 4+58.00 TO 6+47.50
PROPOSED PLAN AND PROFILE
GENERAL NOTES:
FOR ANY CONFLICTS.
CONSTRUCTION OF STEAM LINE
EXISTING UTILITIES PRIOR TO
3. CONTRACTOR TO VERIFY ALL
SITE DETAILS.
2. REFER TO SHEET C706 FOR
DETAILS.
PLANS FOR STEAM LINE & PIT
1. REFER TO MECHANICAL
(EL-4)
LOOPS
EXPANSION
(EL-4)
EXPANSION LOOP
FOR WALL PENETRATION DETAIL.
4" DRIP TRAP. SEE SHEET M203 FOR DETAIL
JUST INSIDE 640 MECHANICAL ROOM. PROVIDE NEW
CONNECT NEW HPS AND CPR PIPING TO EXISTING
& 3" CONDENSATE LINE
NEW 4" HIGH PRESSURE STEAM
A T E
OF O
H
I O
P R
O F
E
S S
IONAL EN
G I
N E
E R
R E
GISTER
E
N
S201
F1
S201
F2
S201
F2
S201
F2
S201
F2
SCALE: �" = 1’-0"
NORTH ELEVATION
SCALE: �" = 1’-0"
SOUTH ELEVATION
SCALE: �" = 1’-0"
EAST ELEVATION
SCALE: �" = 1’-0"
WEST ELEVATION
PLAN VIEW
SCALE: �" = 1’-0"
PIT S-218
S201
F4
S201
F3
S201
F3
S201
F3
S201
F5
OF
DATEDRAWNDESIGNED CHECKED
M. Tibbs M. TussJ. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
PROJECT No. ZHTV 100157
REPLACE STEAM LINES S-219 TO F/20642
JML
LINTZ
No. 76327
JAMES M.
R E
E
NI
GNE LANOI
S
S E
F O
R P
OI
H
O
FO ET
A
T S
D
ERETSIGE
R
JCL 05-24-12
2009 INTERNATIONAL BUILDING CODE.
PITS ARE NOT DESIGNER FOR VEHICULAR TRAFFIC ON TOP.
NOTES APPLY TO ALL PITS.
SEE ARCHITECTURAL DRAWINGS OR SITE PLAN FOR PIT ELEVATIONS.
ELECTRODES SHALL BE E70XX.
THE CURRENT EDITION OF THE AWS STRUCTURAL WELDING CODE. WELDING
ALL WELDING SHALL BE DONE BY QUALIFIED WELDERS IN ACCORDANCE WITH 5.
SPLICING OF STRUCTURAL STEEL IS PROHIBITED EXCEPT AS DETAILED.4.
SIZE AS PER PLAN.
BOLTS, UNLESS OTHERWISE SHOWN, SHALL CONFORM TO ASTM A325-N, 3.
STEEL SHALL CONFORM TO ASTM A36.
TUBES SHALL CONFORM TO ASTM A500 GRADE B. ALL OTHER STRUCTURAL
WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A992. STRUCTURAL 2.
BUILDINGS AND BRIDGES AND CURRENT OSHA STANDARDS.
STEEL BUILDINGS, THE AISC CODE OF STANDARD PRACTICE FOR STEEL
WITH THE CURRENT EDITION OF THE AISC SPECIFICATIONS FOR STRUCTURAL
FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL BE IN ACCORDANCE 1.
ALL PITS SHALL BEAR ON UNDISTURBED SOIL OR ENGINEERED FILL.
OF THE GEOTECHNICAL REPORT.
PROFESSIONAL TESTING AGENCY TO ASSURE COMPLIANCE WITH THE RECOMMENDATIONS
EARTHWORK OPERATIONS SHALL BE PERFORMED UNDER THE DIRECTION OF A
2’-0"#6
1’-9"#5
1’-6"#4
LAP DIMENSIONBAR SIZE
ARE REQUIRED:
STEEL. REINFORCING STEEL SHALL BE LAPPED AS FOLLOWS WHERE SPLICES
AND INTERSECTIONS. CORNER BARS SHALL BE PROVIDED TO MATCH HORIZONTAL
HORIZONTAL REINFORCING IN PITS SHALL BE CONTINUOUS AT CORNERS 6.
UNLESS AN ALTERNATE IS APPROVED BY THE ENGINEER.
IF SPECIFIC ANCHORS ARE SHOWN ON DRAWINGS, THEY MUST BE USED
WITH PARTICULAR ATTENTION TO PROPER TORQUE.
ANCHORS SHALL BE INSTALLED PER MANUFACTURER’S RECOMMENDATIONS
POWERS RAWL DIVISION OF POWER FASTENING, INC. AND "KWIK-BOLT 3" BY HILTI, INC.
FASTENERS THAT MEET THESE REQUIREMENTS ARE "POWER-STUD" BY THE
3,765#2,670#�"
2,973#2,091#�"
1,787#1,450#�"
SHEARTENSIONDIA.
FOLLOWING MINIMUM WORKING LOAD CAPACITIES IN 4000 PSI CONCRETE:
CONCRETE EXPANSION ANCHORS, SIZE AS PER PLAN, SHALL DEVELOP THE 5.
REINFORCING STEEL SHALL CONFORM TO ASTM A615, A616, OR A617, GRADE 60.4.
CHLORIDE-BASED ADMIXTURES ARE PROHIBITED IN ALL REINFORCED CONCRETE.3.
ALL CONCRETE SHALL HAVE 4-7% TOTAL AIR CONTENT.2.
CONCRETE SHALL DEVELOP A 28-DAY MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.1.
ADDITIONAL REQUIREMENTS:
SPECIFICATION FOR COLD WEATHER CONCRETING, WITH THE FOLLOWING
ACI 305 SPECIFICATION FOR HOT WEATHER CONCRETE, AND ACI 306
ACI 318 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE,
ACI 301 SPECIFICATIONS FOR STRUCTURAL CONCRETE,
CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT
NOTE:
NOTE: NOTE:
NOTE:
NOTE:
S200
10’-0"
8’-8"
8"
8"
2’-0" 1’-4"
R
R
3’-0"
1’
1’
1’
1’
1’-6"
1’-0
R
3’-9" 3’-1�"
2’-0"
1’
C O
N T
R A
C T
O
V
R
IF
Y
GENERAL NOTES
ELEVATION DATUM
DESIGN SPECIFICATIONS
EARTHWORK
CONCRETE STRUCTURAL STEEL
PLAN
SUMP
HATCH
SUMP
‰ OPENING
ELEVATION VIEWED FROM OUTSIDE OF PIT.
ELEVATION VIEWED FROM OUTSIDE OF PIT.
ELEVATION VIEWED FROM OUTSIDE OF PIT.
ELEVATION VIEWED FROM OUTSIDE OF PIT.
‰ OPENING
TRENCH
(OPP. HAND)
EXISTING TRENCH
PIPE MANUFACTURER
OPENING SIZE WITH
CONTRACTOR VERIFY
S205
S205
SCALE: �" = 1’-0"
FLOOR HATCH DETAIL
SCALE: �" = 1’-0"
SCALE: �" = 1’-0"
REINFORCING DETAIL
TYPICAL DOUBLE OPENING
REINFORCING DETAIL
TYPICAL SINGLE OPENING
SCALE: �" = 1’-0"
SCALE: �" = 1’-0"
TYPICAL LADDER DETAIL
SCALE: �" = 1’-0"
SECTION
S200
F1
SCALE: �" = 1’-0"
SECTION
S200
F2
REINFORCING DETAIL
FLOOR HATCH
SCALE: �" = 1’-0"
SECTION
S200
F4
SCALE: �" = 1’-0"
REINFORCING DETAIL
TRENCH OPENING
SCALE: �" = 1’-0"
SECTION
S200
F3
SCALE: �" = 1’-0"
SECTION
S200
F5
SCALE: 3" = 1’-0"
DETAIL
S205
S205SCALE: 1�" = 1’-0"
DETAIL
NOTE:
C L
R
C L
R
CLR.
2"
CLR.
2" C
L R
C L
R
8"
8"
7" 1’-6"
1’
V A
R
IE
S
(S
E E
IT
E V
A T
IO
N S
M A
X
1’
1’
O .C
M A
X
A
U
N G
A
B
V
E N
Y
A C
E D
M A
X
E Q
U A
L
M A
X
E Q
U A
L
S E
E
IT
E V
A T
IO
N
F O
IG
H T
1’
9"9"6"
1’
W H E N
O P E N
7"
M
IN
1’
M
IN
1’
° M
IN
7"
C L
R
CLR.
2"
CLR.
2"
CLR.
3�"
C L
R
5’-1"
8"3’-9"8"
CLR.
3�"
C L
R
CLR.
2"
3 SIDES
7"
1�
1�
#4@1’-4" O.C.
#4@1’-4" O.C.
@ 1’-4" O.C.
#4 BENT BARS
WATERSTOP
3’-0"
#4@1’-4" O.C.
#4@1’-4" O.C.
BACKFILL
GRANULAR
COMPACTED
#4@1’-4" O.C.
@ 1’-4" O.C.
#4 BENT BARS
3’-0"
BRACKETS SEE DETAIL 1
TOP RUNG
TOP OF PIT
TOP OF SIDERAIL
(NOT REBAR) (GALVANIZED)
�"¿ NON-SLIP RUNGS
PIT WALL
ELEVATION
TOP OF PIT SLAB
ELEVATION
TOP OF PIT SLAB
PIT WALL
COVER
(T Y
(TYP.)
OPENINGS.
CONSOLIDATION BETWEEN
ENSURE CONCRETE
(TYP.)
COVERED DRAIN
CONT. 4"¿ FABRIC
FINISHED GRADE
SIDERAIL (GALVANIZED)
¾ �X2�"
WATERSTOP
#4 BENT BARS
3’-0"
STAINLESS STEEL)
(GALVANIZED OR
MIN. 300 PSF CAPACITY
30"x36" FLOOR HATCH W/
2-#4X4’-0"@3" O.C.
EACH FACE
2-#4@3" O.C.
EACH FACE
2-#4@3" O.C.
EACH FACE
2-#4@3" O.C.
EACH FACE
2-#4@3" O.C.
4’-5"
1’-0" O.C. MAX.
#4 BENT BAR
@ 1’-0" O.C. MAX.
#4 BARS CONT.
4’-5"
1’-0" O.C. MAX.
#4 BENT BAR
TOP OF TRENCH
FINISHED GRADE &
2-#4@3" O.C.
EACH FACE
2-#4@3" O.C.
2-#4@3" O.C.
2-#4X4’-0"@3" O.C.
#4 BENT BARS
2’-0"
NEW PIT WALL
NEW TRENCH WALL
PIT REINFORCING
TRENCH REINFORCING
1-#4 EACH FACE
EXISTING TRENCH
SIDES OF TRENCH
TYPICAL ON ALL
NEW TRENCH
W/ 6" MIN. EMBEDMENT
EPOXY OR APPROVED EQUAL
TRENCH W/ HILTI HIT-HY 150
DRILL & EPOXY INTO EXISTING
#4X2’-6" @ 1’-0" O.C. MAX.
SIDERAIL
RUNG
SIDERAIL
AT 4’-0" O.C. MAX
�" BENT ¾ (GALVANIZED)
ANCHOR 3" MIN EMBEDMENT
‰ �" ¿ EXPANSION
OF
DATEDRAWNDESIGNED CHECKED
M. Tibbs M. TussJ. Poorman
WRIGHT-PATTERSON AIR FORCE BASE IV
IL IN
E E
R
US AF
88TH ABW
E GN
C
COORDINATOR
DATE NO. REVISION
DESIGN CHIEF
BY DATE NO. REVISION
ENGINEERING CHIEF
BY
PROJECT No. ZHTV 100157
REPLACE STEAM LINES S-219 TO F/20642
JML
LINTZ
No. 76327
JAMES M.
R E
E
NI
GNE LANOI
S
S E
F O
R P
OI
H
O
FO ET
A
T S
D
ERETSIGE
R
05-24-2012JCL
S201
| 100% Drawings |
| 100% Civil Drawings_11x17.pdf |
| 0105950-T-001 |
| 0105950-C-GN01 |
| 0105950-C-TM01 |
| 0105950-C-100 |
| 0105950-C-101 |
| 0105950-C-700 |
| 0105950-C-701 |
| 0105950-C-702 |
| 0105950-C-703 |
| 0105950-C-704 |
| 0105950-C-705 |
| 0105950-C-706 |
| M101 |
| M201 |
| M202 |
| M203 |
| M204 |
| M205 |
| E101 |
| E201 |
| E301 |
| M301 |
| 0105950s200 |
| 0105950s201 |
File details come from the government source that posted it. Updated .