FA8601-11-R-0103-0001.pdf
PDF 92 KB Posted
- Attached to
- Demo Driveway / Fill Moats Federal contract opportunity
- Solicitation number
- FA8601-11-R-0103
About this file
FA8601-11-R-0103-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment - 11-R-0103-0003.pdf | ||
| Wage Decision 19 Aug 2011.pdf | ||
| QUESTIONS Moats.docx | DOCX document | |
| General Wage Determination MOD 43 .docx | DOCX document | |
| Addendum 2 .doc | DOC document | |
| FA8601-11-C-0103-0002.pdf | ||
| QUESTIONS Moats.docx | DOCX document | |
| Site Visit Sign in Moats.pdf | ||
| Addendum 1.pdf | ||
| Drawings 000040-2 Rev1.pdf | ||
| Drawings 000040-3 Rev1.pdf | ||
| Revised Specifications.pdf | ||
| General Decision Number - 22 JULY 11.docx | DOCX document | |
| Drawings 000040-3.pdf | ||
| FA8601-11-R-0103.pdf | ||
| Specifications.pdf | ||
| Drawings 000040-2.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
000402/000403
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the site visit date and time to 9 August 2011: 9:00am local , and incorperate revised specif ications and draw ings to replace originals. ( See Summary of Changes)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Aug-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
FA8601-11-R-0103
X
9B. DATED (SEE ITEM 11)
22-Jul-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Aug-2011
CODE
ASC/PKOC - CONSTRUCTION BRANCH
POC: JAMES ANDREWS
1940 ALLBROOK DRIVE, ROOM 109
WRIGHT-PATTERSON AFB OH 45433-5309
FA8601 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8601-11-R-0103
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The Issued By organization has changed from
ASC/PKO - OPERATIONAL CONTRACTING
POC: LT COL MATTHEW STEVENS
1940 ALLBROOK DR STE 3
WRIGHT-PATTERSON AFB OH 45433-5309
to
ASC/PKO - OPERATIONAL CONTRACTING
POC: LT COL MICHAEL B. RILEY
1940 ALLBROOK DR STE 3
WRIGHT-PATTERSON AFB OH 45433-5309
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JAN 2011
52.219-28 Post-Award Small Business Program Rerepresentation APR 2009
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
See Attached Drawings
Title File Drawing No. Dated
Cover Sheet 000040-2 1 27 July 2011
Exsisting Site Plan 000040-2 2 27 July 2011
Site Demolition Plan 000040-2 3 27 July 2011
Proposed Utility Plan 000040-2 4 27 July 2011
Proposed Site Plan 000040-2 5 27 July 2011
Detail Sheet 000040-2 6 27 July 2011
Details & Notes 000040-2 7 27 July 2011
Cover Sheet 000040-3 1 27 July 2011
Exsisting Site Plan 000040-3 2 27 July 2011
Site Demolition Plan 000040-3 3 27 July 2011
Proposed Utility Plan 000040-3 4 27 July 2011
Proposed Site Plan 000040-3 5 27 July 2011
Detail Sheet 000040-3 6 27 July 2011
Details & Notes 000040-3 7 27 July 2011
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 372 17-MAY-2011
Attachment 2 General Wage
Determinations
OH20080002
42 22-JUL-2011
Attachment 3 000402 Drawings 7 12-MAY-2011
Attachment 4 000403 Drawings 7 12-MAY-2011 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 404 27-JUL-2011
Attachment 2 General Wage
Determinations
OH20080002
42 22-JUL-2011
Attachment 3 000402 Drawings 7 27-JUL-2011
Attachment 4 000403 Drawings 7 27-JUL-2011
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
PKOC L-0004
PKOC L004 – Instructions, Conditions and Notices of Offerors: (JUN 2011)
To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist to two (2) separate factors, Factor 1 – Technical Proposal and Factor 2 – Price Proposal.
The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition.
Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer’s opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
FACTOR 1--TECHNICAL PROPOSAL
Technical proposals are not required. Technical acceptability will be determined based on the offerors compliance with the requirement as stated in the Section B Schedule and associated specifications and drawings.
FACTOR 2--PRICE PROPOSAL
Completion of the Request for Proposal (RFP), Section B Schedule will represent the price proposal. Proposal price must represent a fair and reasonable price and conform to solicitation requirements. Provide the following documentation with the price proposal:
(1) Offerors Standard Form 1442 (e.g. page 2). An official having the authority to contractually bind your company must sign the SF 1442 IAW FAR 4.102. The original of the SF 1442 must bear an original signature.
(2) Insert the proposal price in the Offeror Schedule (Section B-Supplies of Services and Prices) of the Solicitation.
(3) Complete all required Representations Certifications and other Statements.
(4) Acknowledge all Amendments.
CONTRACT DOCUMENTATION
a. Model Contract/Representations and Certifications:
The purpose of this section is to provide information to the Government for preparing the contract document and supporting file. The offeror's proposal shall include a signed copy of the Model Contract, and Sections A through K.
Section A—Solicitation/Contract Form: Completion of blocks 14, 15, 16, 17, 19, 20A and signature and date for blocks 20B and 20C of the SF 1442. Signature by the offeror on the SF 1442 constitutes an offer, which the
Government may accept. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.
Section B—Supplies or Services and Costs/Prices: All pricing information shall be addressed Section B – The
Schedule of the RFP. Information shall be limited to Contract Line Item Number (CLIN) 0001 & 0002 including unit and extended pricing as specified in Section B.
Section F—Deliveries or Performance: See Section F of the SF 1442 for Period of Performance.
Section H—Special Contract Requirements: See Section H for Special Contract Requirements for requirements that need to be completed by the offeror.
Section I—Contract Clauses: The following clauses are to be completed by the offeror:
52.225-9 Buy American Act–Construction Materials
52.225-11 Buy American Act—Construction Materials under Trade Agreements
*NOTE: It is the responsibility of the offeror to ensure that any clauses under Section I that are not already identified above and are required to be filled out are in fact completed and submitted with the solicitation.
Section K—Representations, Certifications, and Other Statements of Offerors: The following provisions are to be completed by the offeror:
52.204-8 Annual Representations and Certifications
52.209-5 Certification Regarding Responsibility Matters
52.209-7 Information Regarding Responsibility Matters
252.204-7007 Alternate A, Annual Representations and Certifications
252.209-7002 Disclosure of Ownership or Control by a Foreign Government
*NOTE: It is the responsibility of the offeror to ensure that any provisions under Section K that are not already identified above and are required to be filled out are in fact completed and submitted with the solicitation.
Attachments to the Model Contract: The offeror shall provide the following as attachments to the model contract:
NONE
b. Exceptions to Terms and Conditions:
Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information shall be provided in the format and content of Table 1. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.
Table 1—Solicitation Exceptions
SOLICITATION
Document
Paragraph/ Page
Requirement/ Portion
Rationale
SOO, SOW, SPEC
Model Contract, ITO, etc.
Applicable Page and Paragraph
Numbers
Identify the requirement or portion to which exception is taken
Justify why the requirement will not be met
c. Other Information Required:
Authorized Offeror Personnel: Provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually.
Also, identify those individuals authorized to negotiate with the Government.
(End of Provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
9 Aug 2011 at 9:00am EST.
(c) Participants will meet at--
Hope Hotel – Parking for site visit
(Park in outer area toward St Rt 444)
(End of provision)
(End of Summary of Changes)