RFI 001.pdf
PDF 119 KB Posted
- Attached to
- Project ZHTV980636 Demolish Facility 30089 Federal contract opportunity
- Solicitation number
- FA8601-11-R-0100
About this file
Request for Information 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1 - 11-R-0100-0001.pdf | ||
| Wage Decision 19 Aug 2011.pdf | ||
| RFI 002.pdf | ||
| Sign in Sheet.pdf | ||
| Wage Decision 22 July 2011.pdf | ||
| SW Pollution Prevention Plan.pdf | ||
| Asbestos Inspection Report.pdf | ||
| Final Drawings - Addendum 1.pdf | ||
| Final Drawings.pdf | ||
| Addendum 2.pdf | ||
| Final Specifications.pdf | ||
| Addendum 2 Specifications.pdf | ||
| Soil Testing.pdf | ||
| Addendum 1.pdf | ||
| Hazardous Materials Report.pdf | ||
| Solicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mr. Leu-
O’Rourke Wrecking Company respectfully submits the following question in reference to Demolition of Building 30089:
* At the pre-bid meeting, it was mentioned that contaminated soil removal work, if required, would potentially be handled on a unit price basis. However, the bid form provided only includes a “lump sum item” for all work. Please advise.
Thank you, Jeremy Hudson
O’Rourke Wrecking Company
Response: The soil removal work per the bid documents can be submitted in a lump sum item cost.
Letitia Nelson-Design Manager