Final Drawings.pdf
PDF 11 MB Posted
- Attached to
- Project ZHTV980636 Demolish Facility 30089 Federal contract opportunity
- Solicitation number
- FA8601-11-R-0100
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Decision 19 Aug 2011.pdf | ||
| Amendment 1 - 11-R-0100-0001.pdf | ||
| RFI 002.pdf | ||
| RFI 001.pdf | ||
| Sign in Sheet.pdf | ||
| Wage Decision 22 July 2011.pdf | ||
| SW Pollution Prevention Plan.pdf | ||
| Asbestos Inspection Report.pdf | ||
| Final Drawings - Addendum 1.pdf | ||
| Addendum 2.pdf | ||
| Final Specifications.pdf | ||
| Addendum 2 Specifications.pdf | ||
| Soil Testing.pdf | ||
| Addendum 1.pdf | ||
| Hazardous Materials Report.pdf | ||
| Solicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
LOCATION MAP
SCALE: N.T.S.
Cincinnati, Ohio 45202
Fax (513) 721-0600
Architect:
300 West Fourth Street
Fax (937) 435-6549
Civil Engineer:
ISSUE DATE
SHEET INDEXBUILDING 30089
DECONSTRUCTION PROJECT
SFA Architects
Ph. (513) 721-0600
Tes Tech, Inc.
8534 Yankee Street
Dayton, Ohio 45458
Ph. (937) 435-3200
EnvironmentalEngineer:
Fax (937) 435-6549
Tes Tech, Inc.
8534 Yankee Street
Dayton, Ohio 45458
Ph. (937) 435-3200
BLDG 30089
R O
U T
E
S B
R O
A D
S T
R E
E T
WRIGHT AVENUE
RITCHIE ROAD
E D
W A
R D
S S
T R
E E
T
BUCKNER R
OAD
SKEEL A
VENUE
SUNDORPH DRIVE
VAN PATTON DRIVE
HARNESS ROAD
ALLBROOK DRIVE
W. DAYTON DRIVE
GREENE STREET
CLOVER STREET
SPRUCE DRIVE
MAIN STREET
LEGION LANE
CYPRESS DRIVE
MIDDLE STREET
S W
E S
T S
T R
E E
T
S F
IR
S
T S
T R
E E
T
AREA PLAN
BUILDING AREA: 149,895 GSF
MEZZANINE 1 AREA: 14,867 GSF
MEZZANINE 2 AREA: 10,300 GSF
MEZZANINE 1
MEZZANINE 2
PROJECT INFO, LOCATION MAP, KEY PLAN
A-1.0
SCALE: N.T.S.
VICINITY MAP
N
AREA C
REFERENCE NOTES
VICINITY/ LOCATION/ DWG INDEX/ REF NOTES
A-2.0
A-4.0
A-4.1
A-5.0
SEQUENCE OF CONSTRUCTION NOTES
T-1.0
R
E -S
U B
M
IT
T A
L
/2
/1
T-1.0
A-3.0
A-5.1
C-1.0
C-1.1
C-1.2
EV-1.0
L-1.0
P-1.0
P-1.1
P-1.2
M-1.0
M-1.1
M-1.2
E-1.0
E-1.2
E-2.0
E-2.1
ABBREVIATIONS AND SYMBOLS
TRUCK ROUTING PLAN
EXISTING FEATURES PLAN
BUILDING DEMOLITION PLAN
FOUNDATION DEMOLITION PLAN
SITE AND DRAINAGE DEMOLITION PLAN
SITE GRADING AND DRAINAGE PLAN
ENVIRONMENTAL PLAN AND NOTES
LANDSCAPE PLAN
EXISTING PLUMBING SITE PLAN
PLUMBING SITE DEMOLITION PLAN
PLUMBING BUILDING DEMOLITION PLAN
EXISTING STEAM AND GAS SITE PLAN
STEAM AND GAS DEMOLITION SITE PLAN
MECHANICAL BUILDING DEMOLITION PLAN
E-1.1
STORM WATER POLLUTION PREVENTION PLAN PHASE 1
STORM WATER POLLUTION PREVENTION PLAN NOTES AND DETAILS
A-5.2
E-3.0
ELECTRICAL SITE GENERAL NOTES
EXISTING ELECTRICAL SITE PLAN
ELECTRICAL SITE DEMOLITION PLAN
ELECTRICAL SITE WORK PLAN
ELECTRICAL SITE DETAILS
ELECTRICAL BUILDING DEMOLITION PLAN
1. REROUTE PRIMARY AND SECONDARY ELECTRIC FEEDS.
2. MECHANICAL AND PLUMBING UTILITY REMOVAL, REROUTE, CAP, AS PER DRAWINGS.
3. PERFORM ASBESTOS ABATEMENT THROUGHOUT ENTIRE BUILDING UNLESS AGREED UPON
WITH WPAFB CONTRACTING OFFICER TO PERFORM SUCH WORK CONCURRENT WITH
OTHER DEMOLITION ACTIVITIES.
4. PERFORM SWPPP PHASE 1 ASSOCIATED WORK.
5. PERFORM BUILDING DEMOLITION/DECONSTRUCTION WORK.
6. PERFORM UTILITY, CURB, AND MISC. SITE CONSTRUCTION ACTIVITY WORK.
7. PERFORM SWPPP PHASE 2 ASSOCIATED WORK.
SITE LAYOUT PLAN
STORM WATER POLLUTION PREVENTION PLAN PHASE 2
F
IN
A L
S U
B M
IT
T
A L
/2
/1
1. CONTRACTOR TO CHECK ENTIRE SET OF CONTRACT DOCUMENTS FOR EXTENT OF WORK.
2. CONTRACTOR TO USE AS REFERENCE THE FOLLOWING PROVIDED DOCUMENTS:
A. EXISTING DOCUMENTATION SET
B. PRE-DEMOLITION ASBESTOS INSPECTION REPORT
C. HAZARDOUS MATERIALS INSPECTION REPORT
D. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN
E. LIMITED PHASE II ENVIRONMENTAL ASSESSMENT (SUBSURFACE SOIL SAMPLING)
3. FLOOR ELEVATIONS, GRADES, DIMENSIONS AND CONDITIONS OF EXISTING CONSTRUCTION
INDICATED ON THESE DRAWINGS AND ALL REFERENCE DOCUMENTS SHALL BE FIELD
VERIFIED BY THE CONTRACTOR. REPORT CONFLICTS OR DISCREPANCIES TO THE
CONTRACTING OFFICER FOR RESOLUTION PRIOR TO STARTING WORK.
PEARSON ROAD
AR-1.0
AR-1.1
FOUNDATION REFERENCE PLAN #1
FOUNDATION DEMOLITION PLAN #2
COVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
DECONSTRUCTION FACILITY 30089
PROJECT NO: 980636
A-1.0
UGEUGE UNDERGROUND ELECTRIC
WATER LINE
STORM SEWER
SANITARY SEWER
EXISTING FENCEX
W
X
W
GAS REGULATOR
BUSH
SIGN
DECIDUOUS TREE
PINE TREE
BENCHMARK
POWER POLE
TELEPHONE POLE
FIRE HYDRANT
CATCH BASIN
STORM MANHOLE
SANITARY MANHOLE
LIGHT POLE
WATER MANHOLE
WATER VALVE
CURB INLET
MONITORING WELL
GAS METER
TELEPHONE RISER
ELECTRIC BOX
GAS VALVE
GAS LINE
UNDERGROUND TELEPHONE
BOLLARD POST
G
UGT
G
UGT
T
G
G
W
S
P
WATER PIV
GAS MANHOLE
SIAMESE WATER
A/C UNIT
TELEPHONE MANHOLE
UNDERGROUND CATVUGCATV
UNDERGROUND STEAM TRENCHST ST
UGSCUGSC UNDERGROUND SIGNAL CABLE
CasementCSMT
CMP
CORR
CG
CORR
CJT
CLL
CONTR
COORD
Corrugated Metal Pipe
Contract Limit Line
Contractor
Corrugated
Corridor
Coordinate
Control Joint
Cooling Tower
Corner Guard
CIR
COMM
CONN
CONF
CND
COND
CMU
CONC
CRT
CONT
CM
CONSTR
CLO
CCTV
CLR
CO
CLRM
CKT
COL
CW
CH
CO
CHAM
CHBD
CM
C to C
CHEM
CTR
CEM
CLG
CB
CST
CIPC
CIP
CSWK
CLG HT
Circle
Closed Circuit Television
Condenser or Condensate
Conc. Masonry Unit
Computer Terminal
Communication Outlet
Construction Manager
Conference
Conduit
Concrete
Continuous
Construction
Connect(ed)(ion)
Closet
Clear(ance)
Clean Out
Classroom
Circuit
Column
Cold Water
Coat Hook
Cast-In-Place Concrete
Chemical, Chemistry
Center Line
Channel
Chamfer
Chalkboard
Ceramic Tile
Change Order
Centimeter(s)
Center to Center
Celsius, Degree
Cement
Ceiling
Cast Stone
Cast Iron
Casework
Catch Basin
Center
Ceiling Height
Cast Iron Pipe
AvenueAVE
CUH
CAB
BO
BBD
BUR
CPT
CANTL
BW
BOC
BOT
BLDG
BRK
BRZ
BRKT
BFE
BRIDG
BLR
BLKG
BLK
BITUM
BVL
BTWN
BM
BLW
AVG
BRG
BM
BSMT
B&B
BAL
BJT
BPL
Both Sides
Cabinet Unit Heater
Bottom Footing Elevation
Cabinet
Building Line
Bumper Guard
Bulletin Board
Carpet(ed)
Cantilever
By Others/Owner
Built-up Roofing
Bottom
Both Ways
Building
Brick
Bronze
Bridging
Bracket
Bottom Face
Bottom of Curb
Bevel(ed)
Boiler
Board
Blocking
Block
Bituminous
Between
Below
Bedroom
Bench Mark
Bearing
Beam
Basement
Balance
Average
Back of Curb
Bed Joint
Bearing Plate
Balled & Bagged
AC or ACOUS
AP or AC PNL
ANC
APT
ANOD
AUTO
ASPH
AD
APC
ARCH
APPROX
ADJT
ADJ
ADH
ALUM
ALT
AHU
ACU
A/C
AGG
ALLOW
ASC
ADD
AWT
ACT
ACPL
ACFL
AD
ACC
ADDL
AFF
ABV
Anchor, Anchorage
Air Conditioning Unit
Architectural Precast Concrete
Apartment
Anodized
Anchor Bolt
Automatic
Asphalt
Area Drain
Architect(ural)
Approximate
Adjustable
Adjacent
Adhesive
Aluminum
Alternate
Allowance
Aggregate
Air Conditioning
Air Handling Unit
Above Finish Floor
Above Suspended Ceiling
Acoustical Wall Treatment
Acoustical Plaster
Acoustical
Access
Access Floor
Access Door
Addendum
Access Panel
Acoustical Tile
Additional
Above
Grade BeamGR BM
HDWD
HD
HDW
HDBD
GWB
GYP
GU
GRND
GR
HNDRL
Gypsum Wallboard
Hardwood
Head
Hardware
Hardboard
Handrail
Gypsum
Gutter
Ground
Grade
Double HungDH
Face of StudFOS
FD
GA
FUT
GL
GEN
GC
GAL
GALV
GB
GLU LAM
FT
FL
FUR
FBY
FURNFS
FRM
FDTN
FTG
FLUOR
FIX
FP
FHC
FH
FCO
FLR
FHWS
FHMS
FF&E
FLASH
FT
F
FE
FFL
FFE
FIN
FF
FAS
FOW
FEC
Floor Drain
General Contract(or)
Furnished By Others
Furring
Glass
Generator
Galvanized
Gallon
Future
Grab Bar
Glue Laminated
Gage or Gauge
Foot, Feet
Fluorescent
Flow Line
FurnishFull Size
Frame
Foundation
Footing
Finished Floor Line
Finished Floor Elevation
Flat Head Wood Screws
Flat Head Machine Screws
Fire Hose Cabinet
Fire Hydrant/Hose
Fixtures, Furniture & Equipment
Fire Extinguisher Cabinet
Floor
Flashing
Fixture
Fireproof
Floor Cleanout
Finish
Fahrenheit
Face of Wall
Finished Floor
Fire Extinguisher
Fasten, Fastener
Feet
EL or ELEV
ENGR
EIFS
EXT
EJT
EXP
FOM
FOC
FB
EXTRU
EF
EG
EXH
EST
ESTB
ESC
EQ
ENTR
EXIST’G
EQUIP
E
ELEC
EWC
ELAS
EW
EF
ENCL
EMER
ELEV
DWG
DWR
DS
DN
EE
EA
DUP
DF
DWL(S)
Engineer
Finish System
Exterior Insulation &
Face of Concrete
Exterior
Expansion
Face Brick
Extrusion
Expansion Joint
Face of Masonry
Existing
Exhaust
Estimate
Establish
Escalator
Equipment
Equal
Exhaust Fan
Entrance
Exhaust Grille
Electric Water Cooler
Each Face
Electrical
Elastomeric
Each Way
Enclosure
Emergency
Elevator
Elevation
East
Dowel(s)
Drawing
Drawer
Downspout
Down
Each End
Duplicate
Each
Drinking Fountain
DP
DIR
DR
DR
DIV
DIST
DISP
DO
DBL
DO
DBL ACT
D
DC
DIM
DIFF
DIA
DIAG
DTL
DSGN
DEPT
DEG
CFM
CI
DP
CYL
CY
CF
DL
DMT
DEMO
Deep
Direction, Director
Double
Doctor
Division
Distribution
Dispenser
Door
Double Acting
Door Opening
Ditto
Depth
Department
Degree
Dimension
Diffuser
Diameter
Diagonal
Detail
Design
Direct Current
Cubic Feet Per Minute
Demolish, Demolition
Cylinder
Cubic Yard
Cubic Inch
Cubic Foot
Demountable
Dead Load
Dampproofing
Masonry
Original
PTD
PERF
PVMT
PTN
OH
ORD
OA
OD
OTO
OZ
PNL
PR
PTD
Overflow Roof Drain
Paper Towel Dispenser
Perforated
Pavement
Partition
Ounce
Panel
Painted
Overhead
Overall
Out to Out
Outside Diameter
Pair
NIC
OB
NO
NTS
OFF
ORIG
OPP
OPNG
OC
OB GL
N
MULL
NORM
NOM
NRC
NAT
NA
NW
NE
MM
MTD
MTR
MLDG
MOD
MIX
MISC
MIR
MIN
MIN
MLWK
M
MBR
MED
MECH
MAX
MATL
MO
MEMB
MEZZ
MTL
Noise Reduction Coefficient
Not In Contract
Center
Obscure
Number
Obscure Glass
Not to Scale
Office
Opposite
Opening
On
Mullion
Northwest
Northeast
North
Normal
Nominal
Natural
Not Applicable
Millimeter
Minute
Minimum
Millwork
Mounted
Mortar
Molding
Mixture
Mirror
Miscellaneous
Modified, Modular
Member
Medium
Mechanical
Maximum
Material
Meter
Membrane
Mezzanine
Metal
Masonry Opening
LWT CONC
LONG
LVR
MAS
MFR
MAN
MH
MAINT
MS
MACH
LP
LL
LT
LLH
LOC
LTL
LIN
LWT
LTG
LLV
K
L
LG
LAM
LAB
KO
KD
KIT
LH
LAV
JT
JAN
KVA
KW
KPL
JB
JST
JST BR
Length
Lightweight Concrete
Long Leg Vertical
Long Leg Horizontal
Longitudinal
Louver
Manual
Manhole
Machine
Manufacturer
Maintenance
Low Point
Machine Screw
Live Load
Lintel
Linear
Lightweight
Lighting
Light
Locate, Location
Kips
Laminated
Laboratory
Knockout
Kitchen
Knocked Down
Left Hand
Lavatory
Large
Janitor
Kilowatts
Kick Plate
Junction Box
Joist
Kilovolt Amps
Joist Bearing
Joint
INSUL PNL
HWY
ILLUM
IF
ID
INVT
INT
INSUL
INFO
INC
IN
INVT EL
HR
HWH
HW
HP
HM
HC
HYD
HORIZ
H
HDR
HTG
H PT
HZ
HT
HVAC
Highway
Hot Water Heater
Illumination
Invert
Interior
Insulation
Inside Face
Information
Inches
Invert Elevation
Insulated Panel
Inside Diameter
Include(d) (ing)
Hot Water
Horsepower
Horizontal
Hollow Metal
Hollow Core
Hour
Hydrant
Air Conditioning
Heating, Ventilating, Header
High Point
Hertz
Height
Heating
High
Refrigerator REFR
W/
WI
YD
WPT
WD
W/O
WTW
W
W
WF
WT
WWF
WH
WC
WG
WDW
Welded Wire Fabric
With
Wrought Iron
Without
Wood
Working Point
Yard
Wall to Wall
Water Closet
Wide Flange
Weight
Water Heater
Wired Glass
Window
Wide, Width
West
VAR
V
VENT
VEN
WSCT
VOL
VIT
VWC
VCT
VERT
TYP
VB
VAL
UTIL
UR
UNFIN
USG
UL
T&G
TOW
TOS
TOP
TOF
TOD
TOC
TOB
TB
TR
TOPAR
TEL
TKBD
TV
TEMP
TPD
THK
THERM
TEX FIN
TEMP GL
Underwriter’s Laboratories
United States Gage
Vinyl Wall Covering
Vinyl Composition Tile
Varnish
Veneer
Ventilating
Wainscot
Vitreous
Volume
Vertical
Volt
Value
Unfinished
Urinal
Utility
Typical
Vapor Barrier
Toilet Paper Dispenser
Tongue and Groove
Top of Curb (Concrete)
Top of Deck
Top of Pier
Top of Steel
Top of Wall
Top of Beam
Towel Bar
Transom
Top of Footing
Top of Parapet
Telephone
Television
Tackboard
Thermal
Thick(ness)
Temperature
Textured Finish
Tempered GlassL
STRUCT STL
ST STL or SS
SQ FT or SF
SECT
SYS
SW
SUSP
SA
STOR
STL
STD
STAG
SIM
SHT
S
SPEC
SW
SE
STC
SQ
RM
RFG
RD
ROW
SAN
RND
RO
SCD JT
SCHED
RCP
REINF
REG
REBAR
RH
REV
RA
RET
REQD
RLF
Section
Sound Transmission
Square
Steel
Staggered
Standard
Storage
Supply Air
Suspended
Switch
System
Stainless Steel
Structural Steel
Coefficient
Specification
Sheet
Similar
South
Southeast
Southwest
Square Foot
Reinforced Concrete Pipe
Roof Drain
Roofing
Room
Right of Way
Scored Joint
Sanitary
Schedule
Round
Rough Opening
Regular
Right Hand
Revision
Return Air
Return
Required
Relief
Reinforcing Bar
Reinforcing (ed)
RE or REF
PC
QT
R
RECT
REC
RECP
RR
QTR
QT
PI
PSI
PSF
PCF
PVC
QUAL
PL
PROJ
PRELIM
PT
PWD
PL
PLAM
PLUMB
Point of Curve
Pounds per Square Foot
Pounds per Cubic Foot
Point of Intersection
Pounds per Square Inch
Quarry Tile
Reference
Rectangular
Recessed
Receptacle
Railroad
Radius
Quarter
Quart
Projection
Quality
Preliminary
Property Line
Polyvinyl Chloride
Point, Point of Tangent, Pressure Treated Lumber
Plywood
Plumbing
Plate
Plastic Laminate
ABBREVIATIONS ARCHITECTURAL SYMBOLS
SECTION NUMBER
DRAWING NUMBER
WALL / BUILDING SECTION INDICATOR
CAX
LAB
ROOM NAME
ROOM NUMBER
ROOM NAME INDICATOR
A
DETAIL NUMBER
DRAWING NUMBER
C5
A700
ELEVATION INDICATOR
DETAIL NUMBER
DRAWING NUMBER
ENLARGED PLAN INDICATOR
EQUIPMENT TAG
A COLUMN LINE INDICATOR
N
NORTH ARROW
ELEVATION INDICATOR
ELECTRIC WATER COOLER
BREAK LINES
NEW INSULATION- BATT
MATERIALS LEGEND
NEW GWB
EARTH
INSULATION BOARD
NEW CONCRETE
GRAVEL
PLYWOOD
PARTITION TYPE INDICATOR - SEE A001
DOOR NUMBER - SEE A620-622
CEILING HEIGHT/TYPE - SEE A300 SERIES
FURNITURE TAG - SPEC SECTION ?????
ELEC. PANEL
WINDOW TYPE - EXTERIOR
WINDOW TYPE - INTERIOR
EXISTING BRICK
EXISTING CMU
FIRE EXTINGUISHER CABINET
NEW CMU
NEW BRICK
EXISTING CONCRETE
EXISTING STUD WALL
NEW STUD WALL
FIRE EXTINGUISHER ON WALL BRACKET
E.P.
F.E.
F.E.
L-2
NEW LINTEL SCHEDULE
LINTEL NUMBER
DRAWING NUMBER
UNO Unless Otherwise Noted
CFMF Cold Formed Metal Framing
(E) Existing
CT
AB
BC
BR
BD
BS
BF
BL
BG
CI
CL
CT
C
C
MEP Mechanical, Electric, & Plumbing
F-R Fire Retardant Treated
A
A623
W4
FR Fire Rated
ENGINEERING SYMBOLS
ABBREVIATIONS AND SYMBOLS
STMSTM
SS SS
COVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
1/32" = 1’-0"A-1
1 FIRST FLOOR PLAN
MEZZANINE 1
MEZZANINE 2
GENERAL NOTES
CODED NOTES1
KEY PLAN
1/32" = 1’-0"
MEZZANINE 1 PLAN
1/32" = 1’-0"
MEZZANINE 2 PLAN
N O
R T
H
NORTH
NORTH
ROOF PLAN
N.T.S.
NORTH
A-4.0
50’-0"
BUILDING DEMOLITION PLAN
1. REMOVE BUILDING CONSTRUCTION COMPLETELY INCLUDING ROOF, WALLS, SLAB, FOUNDATIONS, DOORS, WINDOWS, CEILING SYSTEMS, ETC. REFER TO FOUNDATION PLAN FOR MORE INFORMATION.
2. DISMANTLE EXISTING RAISED FLOORING AND ALL COMPONENTS AND DELIVER TO AREA DESIGNATED BY
WPAFB CONTRACTING OFFICER.
3. REMOVE FIRE DOOR. ASSUME DOOR CONTAINS ASBESTOS MATERIALS INSIDE.
4. INDICATES UNDERGROUND ELECTRIC UTILITY. REFER TO SHEET E-1 FOR MORE INFORMATION.
5. CONTRACTOR TO INVESTIGATE THE EXISTING CONDITION OF THE ROOF IN REGARDS TO WORKER SAFETY AND
NOTIFY CONTRACTING OFFICER OF UNSAFE WORKER CONDITIONS.
6. PRIOR TO ROOF DEMOLITION, CONTRACTOR TO REMOVE ALL MECHANICAL EQUIPMENT AND
DISCONNECT/REMOVE ASSOCIATED PIPING, CONTROLS, AND ELECTRICAL CONNECTIONS. WPAFB HAS
ELECTED NOT TO SALVAGE THIS EQUIPMENT.
1. CONTRACTOR TO VERIFY DIMENSIONS AND CONDITIONS PRIOR TO START OF WORK.
2. EACH TRADE SHALL COORDINATE WITH THE CONTRACTOR AND VERIFY SIZE AND LOCATION OF ALL RECESSES, CHASES, AND OPENINGS REQUIRED FOR THE REMOVAL OF MECHANICAL, ELECTRICAL, AND OTHER
EQUIPMENT.
3. ALL ITEMS NOTED FOR REMOVAL SHALL BE REMOVED COMPLETELY, INCLUDING ENTIRE SYSTEM OF SUSPENSION, ANCHORS, CLIPS, AND ADHESIVES, ETC RELATED TO THAT ITEM. REMOVAL SHALL BE PERFORMED CAREFULLY TO MINIMIZE DAMAGE, PARTICULARLY ITEMS TO BE SALVAGED FOR REUSE OR
RETURNED TO THE OWNER.
4. CONTRACTOR TO CONTROL FUGITIVE DUST WHEN USING HEAVY EQUIPMENT TO DEMOLISH STRUCTURES.
5. REFER TO ELECTRICAL BUILDING DEMOLITION PLAN FOR MORE INFORMATION RELATED TO DEMOLITION OF THE
EXISTING CEILING SYSTEMS.
6. CONTRACTOR TO SALVAGE THE FOLLOWING ITEMS AND DELIVER TO ON-BASE LOCATION PER COORDINATION
WITH WPAFB CONTRACTING OFFICER.
- EXTERIOR ROLL-UP DOORS AND ASSOCIATED HARDWARE
- EXTERIOR GUTTERS AND DOWNSPOUTS
COVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
DECONSTRUCTION FACILITY 30089
PROJECT NO: 980636
RAMP DOWNUP
UP
UP
UP
R A
M P
U P
UP
UP
UP
UP
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
UP
UP
DOWN
UP
UP
DN
UP
STEAM
PIT
VENT
SPRINKLER
DRAW OFF
SPRINKLER
DRAW OFF SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
UP
DF
C W
* MISC. SYSTEMS
FURNITURE* * MISC. SYSTEMS
FURNITURE*
DF
WH
UP
ELEV
MH
PHONE RACKS
VENT VENT
x x x x x x x x x x x x x x x x x x x
DF
PIT
BACKFLOW
VALVES
P H
O N
E R
O O
M
WH
PIT
*FURNITURE
STORAGE*
PT SD SD PT AIR
PT SD SD PT AIR
S P
R
WH
DF
DF
WH
S P
R
IN
K L
E R
R O
O M
F P
P A
N E
L
FP
PANEL
PT
SD
PT
DF
FND
P H
O N
E R
O O
M
UP
AIR HANDLER 4
VENT
x
VENT
VENT VENT
PHONE
ROOM
UP
WH
WH
DF
DF
WH
DN
DN
STORAGE BALCONY
PT
PT
* MISC. SYSTEMS
FURNITURE*
* MISC. SYSTEMS
FURNITURE*
* MISC. SYSTEMS
FURNITURE*
* MISC. OFFICE
FURNITURE*
DN
DN
DN
D N
D N
D F
GENERAL NOTES
CODED NOTES1
NORTH
A-4.1
1/32" = 1’-0"A-4.1
1 FOUNDATION DEMOLITION PLAN
N.T.S.A-4.1
A FDN TYPE ’A’
N.T.S.A-4.1
B FDN TYPE ’B’
N.T.S.A-4.1
C FDN TYPE ’C’
N.T.S.A-4.1
D FDN TYPE ’D’
N.T.S.A-4.1
E FDN TYPE ’E’
N.T.S.N.T.S.N.T.S.A-4.1N.T.S.A-4.1N.T.S.A-4.1
N.T.S.A-4.1
I-I FDN TYPE ’I-I’
C-C FDN TYPE ’C-C’ G-G FDN TYPE ’G-G’ H-H FDN TYPE ’H-H’
TYP. INTERIOR
COLUMN FOOTING
TYP. EXTERIOR
WALL SLAB
619’-4 1/2 "
/2
8’-0"x8’-0 PIT
W/ 8" THK WALLS
A
A A A
A
A
ACB CB CB CB CB CB CB CB CB CB BB A
A
G
-G
H-H
H-H
H-H
H-H
C-CI-I
A
CB
D
E
D
E
D
E
D
E
D
CB CB CB CB CB CB CB BB
H-H
I-I BB
FOUNDATION DEMOLITION PLAN
1. REMOVE ALL FOUNDATION AND FOOTING CONSTRUCTION COMPLETELY.
2. CONTRACTOR TO REMOVE EXISTING UNDERGROUND PIT AND ALL ASSOCIATED UTILITIES.
1. CONTRACTOR TO VERIFY DIMENSIONS AND CONDITIONS PRIOR TO START OF WORK. THE DRAWINGS ARE
ILLUSTRATIVE AND MAY NOT REFLECT EXACT CONDITIONS OR DIMENSIONS.
2. THE DESIGN AND DRAWINGS ARE BASED ON THE USE OF SPECIFIC REFERENCE DRAWINGS AS PROVIDED BY WPAFB PERSONNEL. THESE DRAWINGS HAVE BEEN PROVIDED FOR THE CONTRACTORS REFERENCE AS:
* AR-1.0 FOUNDATION REFERENCE PLAN #1
* AR-1.1 FOUNDATION REFERENCE PLAN #2
THE DRAWINGS HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THEIR
ACCURACY OR COMPLETENESS TO AS-BUILT CONDITIONS.
3. ALL ITEMS NOTED FOR REMOVAL SHALL BE REMOVED COMPLETELY. REMOVAL SHALL BE PERFORMED CAREFULLY TO MINIMIZE DAMAGE TO ADJACENT ASSEMBLIES OR UTILITIES SCHEDULED TO REMAIN.
4. THE CONTRACTOR IS RESPONSIBLE FOR ACHIEVING THE MINIMUM WASTE DIVERSION REQUIREMENTS AS INDICATED IN THE PROJECT SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL MATERIAL FROM THE SITE, THE BASE IF DEEMED APPROPRIATE, ALL HAULING OF MATERIAL, AND ANY TECHNIQUES UTILIZED FOR THE CRUSHING OF MATERIAL. THESE ITEMS SHALL BE COORDINATED WITH
WPAFB CONTRACTING OFFICER.
5. ANY EXISTING CONDITION DISCOVERED DURING THE DEMOLITION PROCESS WHICH, BY GENERALLY ACCEPTED CONSTRUCTION PRACTICES, SHOULD BE REMEDIED, SHOULD BE BROUGHT TO THE ATTENTION OF THE
WPAFB CONTRACTING OFFICER IMMEDIATELY AND IN WRITING.
6. PRIOR TO SUBMITTING A BID, THE CONTRACTOR SHALL PERFORM A DETAILED WALK-THRU FIELD INSPECTION TO REVIEW THE EXISTING STRUCTURES AND PREMISES, TO DETERMINE ALL EXISTING CONDITIONS AND SHALL MAKE ALL NECESSARY ALLOWANCES FOR ALL REQUIRED FOUNDATION AND
FOOTING DEMOLITION WORK.
7. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL.
8. CONTRACTOR IS RESPONSIBLE FOR REPAIRING THE DAMAGE DONE TO ANY EXISTING ITEM DURING DEMOLITION. REPAIRS SHALL BE EQUAL TO, OR BETTER THAN, EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EXISTING DAMAGE AND NOTIFY THE BASE CONTRACTING OFFICER PRIOR
TO CONSTRUCTION START.
COVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
NORTH
1/32" = 1’-0"P-1
O
R T
H
CODED NOTES1
KEY PLAN
1/32" = 1’-0"
MEZZANINE 1 PLAN
1/32" = 1’-0"
MEZZANINE 2 PLAN
PLUMBING REMOVAL NOTES
1. REMOVE OR DEMOLISH ALL PLUMBING SYSTEMS WITHIN BUILDING 89, UNLESS OTHERWISE NOTED. PLUMBING SYSTEMS SHALL INCLUDE ALL PIPING (DOMESTIC WATER, DRAIN, WASTE, VENT, STORM & CONTROL AIR), FIRE SUPPRESSION SYSTEMS, AND PLUMBING FIXTURES.
2. FOR PURPOSES OF CLARITY, NOT ALL PIPING IS SHOWN. CONTRACTOR SHALL REMOVE ALL PIPING (UNLESS OTHERWISE INDICATED) INCLUDING VALVES, HANGERS, SUPPORT SYSTEMS, CONTROLS, AND MISC.
ACCESSORIES WHETHER SHOWN OR NOT.
TYP.
5 5
P-1.2
PLUMBING BUILDING DEMOLITION PLANS
1. REMOVE WATER CLOSET AND ALL WASTE, VENT AND CW PIPING COMPLETE.
2. REMOVE URINAL AND ALL WASTE, VENT AND CW PIPING COMPLETE.
3. REMOVE LAVATORY AND ANY ASSOCIATED CASEWORK AND ALL WASTE, VENT, CW AND HW PIPING
COMPLETE.
4. REMOVE SERVICE SINK AND ALL WASTE, VENT, CW AND HW PIPING COMPLETE.
5. REMOVE WATER COOLER AND ALL WASTE, VENT, AND CW PIPING COMPLETE.
6. REMOVE ALL FIRE SUPPRESION PIPING AND CONTROLS COMPLETE.
7. REMOVE WATER HEATER AND ALL ASSOCIATED PIPING.
8. INDICATES LOCATION OF FORMER SILVER-RECOVERY OPERATION. DURING DEMOLITION OF SANITARY DRAINS, SHOULD THE CONTRACTOR ENCOUNTER A BLACK GREASE MATERIAL, STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER. TURN IN ALL RECLAIMED SILVER TO 88 ABW/CEANPIAW SECTION 3.10 OF WPAFB SPECIFICATION SECTION 01 02 20. FOR ADDITIONAL INFORMATION PLEASE CONTACT THE 88
ABW/CEANP HAZARDOUS WASTE PM GARY SELBY AT 937-257-3349 OR BY EMAIL AT
GARY.SELBY@WPAFB.AF.MIL.
COVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
DECONSTRUCTION FACILITY 30089
PROJECT NO: 980636
RAMP DOWNUP
UP
UP
UP
R A
M P
U P
UP
UP
UP
UP
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
UP
UP
DOWN
UP
UP
DN
UP
STEAM
PIT
VENT
SPRINKLER
DRAW OFF
SPRINKLER
DRAW OFF SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
UP
DF
C W
DF
WH
UP
ELEV
VENT VENT
x x x x x x x x x x x x x x x x x x x
DF
BACKFLOW
VALVES
WH
PIT
PT SD SD PT AIR
PT SD SD PT AIR
S P
R
WH
DF
DF
WH
S P
R
IN
K L
E R
R O
O M
F P
P A
N E
L
FP
PANEL
PT
SD
PT
DF
FND
UP
VENT
x
VENT
VENT VENT
UP
WH
WH
DF
DF
WH
DN
DN
STORAGE BALCONY
PT
PT
DN
DN
DN
D N
D N
O
R T
H
CODED NOTES1
KEY PLAN
1/32" = 1’-0"
MEZZANINE 1 PLAN
1/32" = 1’-0"
MEZZANINE 2 PLAN
MECHANICAL REMOVAL NOTES
TYP.
1. REMOVE OR DEMOLISH ALL MECHANICAL SYSTEMS WITHIN BUILDING 89, UNLESS OTHERWISE NOTED.
MECHANICAL SYSTEMS SHALL INCLUDE HVAC EQUIPMENT (CHILLERS, PUMPS, CONDENSING UNITS, AIR HANDLING UNITS, DUCTWORK, AIR DEVICES, WALL LOUVERS, CONTROL DAMPERS, ROOF VENTS, EXHAUST
FANS, HVAC CONTROL SYSTEMS, AND ANY ASSOCIATED PIPING).
2. FOR PURPOSES OF CLARITY, NOT ALL DUCTWORK AND PIPING ARE SHOWN. CONTRACTOR SHALL REMOVE ALL DUCTWORK AND PIPING (UNLESS OTHERWISE INDICATED) INCLUDING VALVES, HANGERS, SUPPORT
SYSTEMS, CONTROLS, AND MISC. ACCESSORIES WHETHER SHOWN OR NOT.
3. COORDINATE SHUT-DOWN OF ALL UTILITIES SERVING THE BUILDING WITH WPAFB CONTRACTING OFFICER.
4. LOCATIONS OF EQUIPMENT ARE SCHEMATIC. CONTRACTOR TO FIELD VERIFY EQUIPMENT LOCATIONS AND
EXTENT OF PIPING AND DUCTWORK.
5. PROVIDE REFRIGERANT RECOVERY FROM EXISTING REFRIGERATION SYSTEMS IN ACCORDANCE WITH
SPECIFICATION SECTION 02 09 10 PRIOR TO REMOVAL OF ANY HVAC EQUIPMENT.
6. CONTRACTOR TO NOTIFY WPAFB CONTRACTING OFFICER IMMEDIATELY UPON DISCOVERY OF PIPING WITH ASBESTOS INSULATION. REFER TO PRE-DEMOLITION ASBESTOS REPORT FOR MORE INFORMATION.
1. REMOVE AIR HANDLING UNIT AND ALL ASSOCIATED DUCTWORK AND AIR DEVICES, LOUVERS, DAMPERS, SOUND ATTENUATORS, FILTER BANKS, COILS, DRAIN PIPING, HVAC CONTROLS, SUPPORTS, AND
ACCESSORIES COMPLETE.
2. REMOVE REFERIGERATION MACHINE AND ALL ASSOCIATED PIPING AND CONTROLS. TRANE MODEL
CGAB0304AEIOBF13.
3. REMOVE HEAT PUMP AND ALL ASSOCIATED PIPING AND CONTROLS. CARRIER MODEL 50YQI30310.
4. REMOVE HEAT PUMP AND ALL ASSOCIATED PIPING AND CONTROLS. TRANE MODEL WCL03OF100BA
5. REMOVE HEAT PUMP AND ALL ASSOCIATED PIPING AND CONTROLS. TRANE MODEL WCH240B300BA.
6. REMOVE AIR DRYER AND ALL ASSOCIATED PIPING AND CONTROLS. KELAIR MODEL IN-5.
7. REMOVE LIEBERT UNIT AND ALL ASSOCIATED PIPING AND CONTROLS.
8. REMOVE CLIMATE CHANGER AND ALL ASSOCIATED PIPING AND CONTROLS. TRANE MODEL CC8812BBLCO.
9. REMOVE SMOKE EETER AND ALL ASSOCIATED CONTROLS.
10. REMOVE ICE MAKER AND ALL ASSOCIATED PIPING.
11. CONTRACTOR TO INVENTORY ALL EQUIPMENT LOCATED ABOVE VIA PULL DOWN STAIR AND COORDINATE WITH WPAFB CONTRACTING OFFICER FOR SALVAGEABLE EQUIPMENT. REMOVE ALL EQUIPMENT, PIPING, AND CONTROLS AS DEEMED NON-SALVAGEABLE BY CONTRACTING OFFICER INCLUDING EXISTING AIR BLOWER AND
ALL ASSOCIATED PIPING AND CONTROLS. AMERICAN STANDARD MODEL 182ER.
12. CONTRACTOR TO INVENTORY ALL EQUIPMENT SERVING MEZZANINE AREA 2 AND COORDINATE WITH WPAFB CONTRACTING OFFICER FOR SALVAGEABLE EQUIPMENT. REMOVE ALL EQUIPMENT, PIPING, AND CONTROLS
AS DEEMED NON-SALVAGEABLE BY CONTRACTING OFFICER.
13. REMOVE EXISTING FANS AND ASSOCIATED PIPING AND CONTROLS LOCATED ABOVE.
14. CONTRACTOR TO INVENTORY ALL EQUIPMENT LOCATED IN HVAC ROOM AND COORDINATE WITH WPAFB CONTRACTING OFFICER FOR SALVAGEABLE EQUIPMENT. REMOVE ALL EQUIPMENT, PIPING, AND CONTROLS
AS DEEMED NON-SALVAGEABLE BY CONTRACTING OFFICER.
15. PRIOR TO START OF DEMOLITION, THE GOVERNMENT, 88ABW/CEOFA @ 257-4514 OR 904-2431, SHALL BE CONTACTED AND AFFORDED THE OPPORTUNITY TO REMOVE ANY CONTROLS IT DEEMS SALVAGEABLE;
STAEFA CONTROL DEVICES.
151515
M-1.2
MECHANICAL BUILDING DEMOLITION PLANSCOVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
DECONSTRUCTION FACILITY 30089
PROJECT NO: 980636
RAMP DOWNUP
UP
UP
UP
R A
M P
U P
UP
UP
UP
UP
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
UP
UP
DOWN
UP
UP
DN
UP
STEAM
PIT
VENT
SPRINKLER
DRAW OFF
SPRINKLER
DRAW OFF SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
UP
DF
C W
DF
WH
UP
ELEV
PHONE RACKS
VENT VENT
x x x x x x x x x x x x x x x x x x x
DF
BACKFLOW
VALVES
P H
O N
E R
O O
M
WH
PIT
PT SD SD PT AIR
PT SD SD PT AIR
S P
R
WH
DF
DF
WH
S P
R
IN
K L
E R
R O
O M
F P
P A
N E
L
FP
PANEL
PT
SD
PT
DF
FND
P H
O N
E R
O O
M
UP
AIR HANDLER 4
VENT
x
FAN
FAN
FAN
FAN FAN
FAN
FAN
FAN FAN
FAN
FAN
FAN
FAN
F A
N
FAN
FAN
FAN FAN
FAN
FAN
FAN
FAN
FAN
FAN
FAN
VENT
VENT VENT
PHONE
ROOM
UP
WH
WH
DF
DF
WH
DN
DN
STORAGE BALCONY
PT
PT
DN
DN
DN
D N
D N
CODED NOTES1
KEY PLAN
1/32" = 1’-0"
MEZZANINE 1 PLAN
1/32" = 1’-0"
MEZZANINE 2 PLAN
ELECTRICAL REMOVAL NOTES
HI
LEGEND
2 x 4 RECESSED FLUORESCENT FIXTURE
1x 4 RECESSED FLUORESCENT FIXTURE
2 x 2 RECESSED FLUORESCENT FIXTURE
WALL MOUNTED FLUORESCENT FIXTURE
RECESSED INCANDESCENT FIXTURE
RECESSED INCANDESCENT FIXTURE
RECESSED INCANDESCENT FIXTURE (CAN LIGHT)
HANGING HIGH BAY LIGHT FIXTURE
HANGING FLUORESCENT STRIP FIXTURE
2 x 4 HANGING FLUORESCENT STRIP FIXTURE
1 x 4 HANGING FLUORESCENT STRIP FIXTURE
1 x 2 HANGING FLUORESCENT STRIP FIXTURE
2 x 8 HANGING FLUORESCENT STRIP FIXTURE
1. REMOVE OR DEMOLISH ALL ELECTRICAL SYSTEMS WITHIN BUILDING 89, UNLESS OTHERWISE NOTED.
ELECTRICAL SYSTEMS SHALL INCLUDE CABLING, PANELBOARD, MOTORS AND CONTROL CENTERS, SWITCHBOARD, DISCONNECTS, RECEPTACLES, OUTLETS, LIGHTING, EQUIPMENT, SWITCHES, ETC.
2. REMOVE OR DEMOLISH ALL DATA CONVEYANCE SYSTEMS WITHIN BUILDING 89, UNLESS OTHERWISE NOTED.
DATA CONVEYANCE SYSTEMS SHALL INCLUDE CABLING, RECEPTACLES, CONDUIT, TELEPHONE DISTRIBUTION
SYSTEMS, CABLETRAY, BRACKETS AND SUSPENSION SYSTEMS, ETC.
3. FOR PURPOSES OF CLARITY, NOT ALL ELECTRICAL SYSTEM OR DATA CONVEYANCE SYSTEMS ARE SHOWN.
CONTRACTOR SHALL REMOVE ALL ITEMS COMPLETE.
4. COORDINATE SHUT-DOWN OF ALL UTILITIES SERVING THE BUILDING WITH WPAFB CONTRACTING OFFICER.
5. LOCATIONS OF EQUIPMENT ARE SCHEMATIC. CONTRACTOR TO FIELD VERIFY EQUIPMENT LOCATIONS.
6. FOR PURPOSES OF CLARITY, NOT ALL LIGHT FIXTURES ARE SHOWN. CONTRACTOR TO REMOVE ALL LIGHT
FIXTURES COMPLETE, WHETHER SHOWN OR NOT.
7. CONTRACTOR TO NOTIFY WPAFB CONTRACTING OFFICER IMMEDIATELY UPON DISCOVERY OF OIL FILLED ELECTRICAL EQUIPMENT WITH THE EQUIPMENT OIL VERIFIED TO BE NON-PCB CONTAINING. REFER TO
SPECIFICATION SECTION 02 84 33 FOR MORE INFORMATION.
N O
R T
H
NORTH
NORTH
SYMBOL DESCRIPTION REMARKS
REMOVE THE LUMINAIRE, CONDUCTORS, CONNECTIONS
AND RACEWAY. REMOVE ALL BRACKETS AND
ATTACHING HARDWARE. RECYCLE THE LAMPS AND
BALLASTS CONSISTENT WITH SPECIFICATION
SECTIONS 02 08 33 AND 02 08 34.
REMOVE THE LUMINAIRE, CONDUCTORS, CONNECTIONS
AND RACEWAY. REMOVE ALL BRACKETS AND
ATTACHING HARDWARE. RECYCLE THE LAMPS.
1. INDICATES ACCESS PIT FOR MAIN POWER FEED. CONTRACTOR TO COORDINATE WITH WPAFB CONTRACTING
OFFICER FOR UTILITY SHUT-DOWN.
2. INDICATES ACCESS PIT TO MAIN POWER FEED SWITCH. CONTRACTOR TO COORDINATE WITH WPAFB
CONTRACTING OFFICER FOR UTILITY SHUT-DOWN.
3. REMOVE HIGH VOLTAGE TRANSFORMER, CONNECTIONS, AND CABLES BACK TO SOURCE. PAUWELS 3-PH, 60HZ, 300 KVA, HV 12470, LV208.
4. REMOVE SWITCHGEAR, CONNECTIONS, AND CABLES. AMERICAN MIDWEST TYPE F-FDP, ENCLOSURE TYPE 1, VOLTAGE 208Y/120, SYSTEM 3-PHASE 4W, AMPS SUPPLY 1,200, RMS SYM AMPS 50,000, (2) SECTIONS.
5. REMOVE PANELBOARD, CONNECTIONS, AND CABLES. FEDERAL PACIFIC 400A, 60HZ, 3-PH.
6. REMOVE ALL CONTROL SYSTEM AND PANELS ASSOCIATED WITH AIR HANDLER 4. REMOVE CONNECTIONS AND CABLES. REMOVAL INCLUDES BUT NOT LIMITED TO HONEYWELL CONTROL SYSTEM, SPECTRUM
CONTROL PANELS, EMS MODEL G3U-40-1 PANEL.
7. REMOVE TRANSFORMER, CONNECTIONS, AND CABLES. SQUARE D DRY TYPE, 750KVA, HV12000, LV480Y/277.
8. REMOVE MOTOR CONTROL CENTER, CONNECTIONS, AND CABLES. SQUARE D MODEL #6.
9. REMOVE TRANSFORMER, CONNECTIONS, AND CABLES. SQUARE D 3-PH, 225KVA, HV480, LV270.
10. REMOVE TRANSFORMER, CONNECTIONS, AND CABLES. SORGEL 3-PH, 150KVA, HV480, LV240.
11. REMOVE TRANSFORMER, CONNECTIONS, AND CABLES. WESTINGHOUSE 37.5KVA, HV480, LV230.
12. REMOVE ALL POWER ASSIST DOOR ACTUATOR EQUIPMENT AND CONTROLS AND DELIVER TO LOCATION
SPECIFIED BY WPAFB CONTRACTING OFFICER.
E-3.0
ELECTRICAL BUILDING DEMOLITION PLANSCOVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
DECONSTRUCTION FACILITY 30089
PROJECT NO: 980636
RAMP DOWNUP
UP
UP
UP
R A
M P
U P
UP
UP
UP
UP
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
UP
UP
DOWN
UP
UP
p r o je c to r s c r e e n
DN
UP
STEAM
PIT
VENT
SPRINKLER
DRAW OFF
SPRINKLER
DRAW OFF SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
VENT
SPRINKLER
DRAW OFF
UP
DF
C W
* MISC. SYSTEMS
FURNITURE* * MISC. SYSTEMS
FURNITURE*
DF
WH
UP
ELEV
MH
PHONE RACKS
VENT VENT
x x x x x x x x x x x x x x x x x x x
DF
PIT
BACKFLOW
VALVES
P H
O N
E R
O O
M
WH
PIT
*FURNITURE
STORAGE*
PT SD SD PT AIR
PT SD SD PT AIR
S P
R
WH
DF
DF
WH
S P
R
IN
K L
E R
R O
O M
F P
P A
N E
L
FP
PANEL
PT
SD
PT
DF
FND
P H
O N
E R
O O
M
UP
AIR HANDLER 4
VENT
x
FAN
FAN
HI HI
HI HI
HI
FAN
HI
HI
FAN FAN
HI
HIHI
HI
HI HI
FAN
HI
HI
HI
HI
HI
HIHI
FAN
HI HI
HI HI
HI
HI
HI
HI
HI
HI HI HI HI HI
HI
HI
HI
HI
HI
HI
HI
HI
FAN FAN
FAN
FAN
FAN
FAN
HI HI HIHI HI
F A
N
HI HI HI HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
FAN
HI
HI
HIHIHIHIHIHIHIHIHI
HIHIHIHIHIHIHIHI
HI HI HI
FAN
FAN FAN
FAN
FAN
FAN
FAN
FAN
FAN
FAN
VENT
VENT VENT
PHONE
ROOM
UP
WH
WH
DF
DF
WH
DN
DN
STORAGE BALCONY
PT
PT
* MISC. SYSTEMS
FURNITURE*
* MISC. SYSTEMS
FURNITURE*
* MISC. SYSTEMS
FURNITURE*
* MISC. OFFICE
FURNITURE*
DN
DN
DN
D N
D N
AR-1.0
N/AFOUNDATION PLAN REFERENCE #1
* FOR REFERENCE ONLY *
COVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
AR-1.1
N/AFOUNDATION PLAN REFERENCE #2
* FOR REFERENCE ONLY *
COVER SHEET
JPRJKFJKF
26OF
DATEDRAWNDESIGNED CHECKED 30JULY10
DESIGN CHIEF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BFAPW
AFUS
E
N
GE
L V
BYREVISIONNO.DATENO. BYREVISIONDATE
ENGINEERING CHIEFCOORDINATOR
073010 65% SUBMITTAL
95% SUBMITTAL091410
102210 95% RE-SUBMITTAL
FINAL SUBMITTAL012811
| 1634 DEMO T-1 Cover |
| 1634 DEMO A 1-0 |
| A-2.0 |
| A-3.0 |
| 1634 DEMO A 4-0 |
| 1634 DEMO A 4-1 |
| A-5.0 |
| A-5.1 |
| A-5.2 |
| C-1.0 |
| C-1.1 |
| C-1.2 |
| EV-1.0 |
| L-1.0 |
| P-1.0 |
| P-1.1 |
| 1634 DEMO P 1-2 |
| E-1.0 |
| E-1.1 |
| E-1.2 |
| E-2.0 |
| E-2.1 |
| 1634 DEMO E 3-0 |
| M-1.0 |
| M-1.1 |
| 1634 DEMO M 1-2 |
| 1634 DEMO AR 1-0 |
| 1634 DEMO AR 1-1 |
File details come from the government source that posted it. Updated .