RFI Responses3.pdf
PDF 60 KB Posted
- Attached to
- Renovate/Construct Aero Evacuation Squadron Facility, Building 4004 Federal contract opportunity
- Solicitation number
- FA8601-11-B-0007
About this file
RFIIs and Responses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Responses4.pdf | ||
| RFI Responses2.pdf | ||
| RFI Responses.pdf | ||
| General Decision Number - OH29 - 12 AUG 2011.pdf | ||
| FA8601-11-B-0007 - Amendment 2.pdf | ||
| FA8601-11-B-0007 - Site Visit SIgn-In Sheet.pdf | ||
| FA8601-11-B-0007 - Amendment 1.pdf | ||
| General Decision Number - OH29 - 22 JULY 2011.docx | DOCX document | |
| 100 AERO EVAC SPECIFICATIONS VOL 2 OF 2.pdf | ||
| FA8601-11-B-0007.pdf | ||
| 100 AERO EVAC SPECIFICATIONS VOL 1 OF 2.pdf | ||
| 100 DRAWINGS 28 FEB 2011.pdf | ||
| General Decision Number - 22 JULY 11.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovate/Construct Aero Evacuation Squadron Facility 34004, Project 079001A-B
Solicitation Number: FA8601-11-B-0007
RFI #4
1. Sheet 17 shows the new underground fire main routing across the front of the building.
There is not adequate enough room to install the underground piping in the entrance location as shown do to multiple units on pads, multiple ramps etc. located in the front of the building. The location specified is virtually impossible. Is it possible to provide an alternate more feasible location to bring the water service into the building?
2. The five 32' long ramps from the basement to ground level (means of egress) will need to be sprinklered. However, the drawings do not show adequate heat being provided in these areas. If this is the case, a dry pipe system would be needed to protect these ramps which is not specified on the drawings. Please clarify how these areas intend to be protected.
Response to Item 1: Project shall be bid as is designed.
Response to Item 2: Project shall be bid as is designed.