General Decision Number - 22 JULY 11.docx
DOCX document 92 KB Posted
- Attached to
- Renovate/Construct Aero Evacuation Squadron Facility, Building 4004 Federal contract opportunity
- Solicitation number
- FA8601-11-B-0007
About this file
Wage Determination OH2 - 22 July 2011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Responses4.pdf | ||
| RFI Responses3.pdf | ||
| RFI Responses2.pdf | ||
| RFI Responses.pdf | ||
| General Decision Number - OH29 - 12 AUG 2011.pdf | ||
| FA8601-11-B-0007 - Amendment 2.pdf | ||
| FA8601-11-B-0007 - Site Visit SIgn-In Sheet.pdf | ||
| FA8601-11-B-0007 - Amendment 1.pdf | ||
| General Decision Number - OH29 - 22 JULY 2011.docx | DOCX document | |
| 100 AERO EVAC SPECIFICATIONS VOL 2 OF 2.pdf | ||
| FA8601-11-B-0007.pdf | ||
| 100 AERO EVAC SPECIFICATIONS VOL 1 OF 2.pdf | ||
| 100 DRAWINGS 28 FEB 2011.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: OH100002 07/22/2011 OH2
Superseded General Decision Number: OH20080002
State: Ohio
Construction Types: Heavy and Highway
Counties: Ohio Statewide.
Heavy and Highway Construction Projects
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 04/09/2010 3 04/16/2010 4 04/23/2010 5 04/30/2010 6 05/07/2010 7 05/21/2010 8 06/04/2010 9 06/25/2010 10 07/02/2010 11 07/09/2010 12 07/23/2010 13 07/30/2010 14 08/13/2010 15 08/27/2010 16 09/03/2010 17 09/10/2010 18 10/01/2010 19 10/29/2010 20 12/03/2010 21 12/10/2010 22 12/17/2010 23 12/24/2010 24 12/31/2010 25 01/14/2011 26 01/21/2011 27 01/28/2011 28 02/04/2011 29 03/25/2011 30 04/08/2011 31 04/29/2011 32 05/06/2011 33 05/20/2011 34 05/27/2011 35 06/03/2011 36 06/10/2011 37 06/17/2011 38 07/01/2011 39 07/08/2011 40 07/22/2011
BRKY0007-003 06/01/2011
LAWRENCE
Rates Fringes
Bricklayer, Stonemason...........$ 28.29 16.80
BROH0001-001 07/01/2010
DEFIANCE, FULTON (Excluding Fulton, Amboy & Swan Creek Townships), HENRY (Excluding Monroe, Bartlow, Liberty, Washington, Richfield, Marion, Damascus & Townships & that part of Harrison Township outside corporate limits of city of Napoleon), PAULDING, PUTNAM and WILLIAMS COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.30 11.81
BROH0001-004 06/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.77 10.03
BROH0003-002 07/01/2010
FULTON (Townships of Amboy, Swan Creek & Fulton), HENRY (Townships of Washington, Damascus, Richfield, Bartlow, Liberty, Harrison, Monroe, & Marion), LUCAS and WOOD (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids) COUNTIES
Bricklayer, Stonemason...........$ 28.10 15.41
BROH0005-003 05/01/2011
CUYAHOGA, LORAIN & MEDINA (Hinckley, Granger, Brunswick, Liverpool, Montville, York, Homer, Harrisville, Chatham, Litchfield & Spencer Townships and the city of Medina)
BRICKLAYER
BRICKLAYERS; CAULKERS;
CLEANERS; POINTERS; &
STONEMASONS.................$ 31.25 11.78
SANDBLASTERS................$ 31.75 11.78
SEWER BRICKLAYERS & STACK
BUILDERS....................$ 31.75 11.78
SEWER BRICKLAYERS; STACK
BUILDERS; & SWING SCAFFOLDS.$ 30.91 11.78
SWING SCAFFOLDS.............$ 32.00 11.78
BROH0006-005 05/01/2010
CARROLL, COLUMBIANA (Knox, Butler, West & Hanover Townships), STARK & TUSCARAWAS
Bricklayer, Stonemason...........$ 25.95 10.58
BROH0007-005 06/01/2010
PORTAGE & SUMMIT
Rates Fringes
BRICKLAYER.......................$ 28.08 12.32
BROH0007-010 05/01/2010
PORTAGE & SUMMIT
Rates Fringes
MASON - STONE....................$ 28.52 8.45
BROH0008-001 06/01/2011
COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton, & Unity Townships and the city of New Waterford), MAHONING & TRUMBULL
BRICKLAYER.......................$ 25.55 15.34
* BROH0009-002 07/01/2011
BELMONT & MONROE COUNTIES and the Townships of Warren & Mt.
Pleasant and the Village of Dillonvale in JEFFERSON COUNTY
Bricklayer, Stonemason...........$ 24.72 15.61 Refractory.......................$ 29.44 15.61
* BROH0010-002 07/01/2011
COLUMBIANA (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships) & JEFFERSON (Brush Creek & Saline Townships)
Bricklayer, Stonemason...........$ 25.82 14.09
BROH0014-002 07/01/2005
HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale)
Bricklayer, Stonemason...........$ 24.01 8.85
BROH0016-002 05/01/2011
ASHTABULA, GEAUGA, and LAKE COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.18 12.54
BROH0018-002 11/01/2010
BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN COUNTIES:
Bricklayer, Stonemason...........$ 26.44 10.01
BROH0022-004 06/30/2010
CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN,
MIAMI, MONTGOMERY, PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) and SHELBY COUNTIES
Bricklayer, Stonemason...........$ 25.07 10.16
BROH0032-001 06/01/2011
GALLIA & MEIGS
Rates Fringes
Bricklayer, Stonemason...........$ 30.72 12.23
BROH0035-002 07/01/2010
ALLEN, AUGLAIZE, MERCER and VAN WERT COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 24.67 11.57
BROH0039-002 06/01/2011
ADAMS & SCIOTO
Rates Fringes
Bricklayer, Stonemason...........$ 29.17 14.62
BROH0040-003 06/01/2010
ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND,
WAYNE and WYANDOT (Except Crawford, Ridge, Richland & Tymochtee Townships) COUNTIES
Bricklayer, Stonemason...........$ 26.30 15.44
FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate.
Free standing stack work ground level to top of stack;
Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.
"Hot" work: $2.50 above journeyman rate.
BROH0044-002 06/01/2011
Rates Fringes
Bricklayer, Stonemason
COSHOCTON, FAIRFIELD,
GUERNSEY, HOCKING, KNOX,
KICKING, MORGAN,
MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships) & PERRY
COUNTIES:...................$ 25.50 11.45
* BROH0045-002 06/01/2011
FAYETTE, JACKSON, PIKE, ROSS and VINTON COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.20 11.63
BROH0046-002 06/01/2010
ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) and WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships) COUNTIES & the Islands of Lake Erie north of Sandusky
Bricklayer, Stonemason...........$ 27.03 15.09
FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate.
Free standing stack work ground level to top of stack;
Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.
"Hot" work: $2.50 above journeyman rate.
BROH0052-001 06/01/2011
ATHENS COUNTY
Rates Fringes
Bricklayer, Stonemason...........$ 26.60 12.75
BROH0052-003 06/01/2011
NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) and WASHINGTON COUNTIES
Bricklayer, Stonemason...........$ 26.60 12.75
BROH0055-003 06/01/2010
DELAWARE, FRANKLIN, MADISON, PICKAWAY and UNION COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 27.21 12.49
CARP0003-004 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
CARPENTER........................$ 24.12 12.15
CARP0069-003 05/01/2009
CARROLL, STARK, TUSCARAWAS & WAYNE
Rates Fringes
CARPENTER........................$ 24.29 10.72
CARP0069-006 05/01/2009
COSHOCTON, HOLMES, KNOX & MORROW
Rates Fringes
CARPENTER........................$ 22.95 10.10
CARP0171-002 05/01/2009
BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE
Rates Fringes
CARPENTER........................$ 24.12 12.39
CARP0200-002 05/01/2011
ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA,
GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING,
MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY,
PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON and WASHINGTON
COUNTIES
CARPENTER........................$ 27.17 11.30
Diver............................$ 39.41 10.40
PILEDRIVERMAN....................$ 27.17 11.30
CARP0248-005 07/01/2008
LUCAS & WOOD
Rates Fringes
CARPENTER........................$ 27.27 14.58
CARP0248-008 07/01/2008
Rates Fringes
CARPENTER
DEFIANCE, FULTON, HANCOCK,
HENRY, PAULDING & WILLIAMS
COUNTIES....................$ 23.71 13.28
CARP0254-002 05/01/2009
ASHTABULA, CUYAHOGA, GEAUGA & LAKE
Rates Fringes
CARPENTER........................$ 29.96 11.41
CARP0372-002 07/01/2008
ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT
Rates Fringes
CARPENTER........................$ 23.18 13.28
CARP0639-003 05/01/2010
MEDINA, PORTAGE & SUMMIT
Rates Fringes
CARPENTER........................$ 28.57 11.84
CARP0735-002 05/01/2009
ASHLAND, ERIE, HURON, LORAIN & RICHLAND
Rates Fringes
CARPENTER........................$ 23.58 10.34
CARP1311-001 05/01/2011
BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE,
GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY &
WARREN
Carpenter & Piledrivermen........$ 25.74 12.96 Diver............................$ 40.58 9.69
CARP1393-002 07/01/2008
CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA,
PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD
Piledrivermen & Diver's Tender...$ 27.30 16.05
DIVERS - $250.00 per day
CARP1393-003 07/01/2008
ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT
Rates Fringes
Piledrivermen & Diver's Tender...$ 25.15 15.92
DIVERS - $250.00 per day
CARP1871-006 05/01/2009
BELMONT, HARRISON, & MONROE
Rates Fringes
Diver, Wet.......................$ 44.19 12.14 Piledrivermen; Diver, Dry........$ 29.46 12.14
CARP1871-008 05/01/2009
ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE,
LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT
Diver, Wet.......................$ 42.69 12.91 Piledrivermen; Diver, Dry........$ 28.46 12.91
CARP1871-014 05/01/2009
CARROLL, STARK, TUSCARAWAS & WAYNE
Rates Fringes
Diver, Wet.......................$ 35.64 11.73 Piledrivermen; Diver, Dry........$ 23.76 11.73
CARP1871-015 05/01/2009
COSHOCTON, HOLMES, KNOX & MORROW
Rates Fringes
Diver, Wet.......................$ 34.29 10.88 Piledrivermen; Diver, Dry........$ 22.86 10.88
CARP1871-017 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
Diver, Wet.......................$ 37.31 12.38 Piledrivermen; Diver, Dry........$ 24.87 12.38
CARP2235-012 01/01/2010
COLUMBIANA & JEFFERSON
Rates Fringes
PILEDRIVERMAN....................$ 29.95 12.25
CARP2239-001 07/01/2008
CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT
Rates Fringes
CARPENTER........................$ 23.71 13.28
ELEC0008-002 04/27/2009
DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING,
PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD
CABLE SPLICER....................$ 35.70 17.06
ELECTRICIAN......................$ 34.00 16.98
ELEC0032-003 06/01/2011
ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT &
WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships)
ELECTRICIAN......................$ 27.10 12.35
ELEC0032-004 06/01/1998
ALLEN, HARDIN, VAN WERT & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships)
Line Construction Equipment Operator..........$ 20.27 4.12+a Groundman Truck Driver......$ 14.43 3.63+a Lineman.....................$ 22.52 4.31+a
FOOTNOTE: a. Half day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day
ELEC0038-002 04/25/2011
CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)
ELECTRICIAN
Excluding Sound & Communications Work.........$ 35.48 18.78
ELEC0038-008 05/01/2006
CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)
Sound & Communication Technician Communications Technician...$ 21.20 8.12+a+b Installer Technician........$ 20.45 8.04+a+b
FOOTNOTES;
a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;
Labor Day; Thanksgiving Day; & Christmas Day
b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service
ELEC0064-003 12/01/2010
COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships), & TRUMBULL (Hubbard & Liberty Townships)
ELECTRICIAN......................$ 30.27 12.42
ELEC0071-001 12/29/2008
ASHLAND, CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE,
FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING,
JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MARION, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), UNION, VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships), and WASHINGTON COUNTIES
Equipment Operators.........$ 27.45 10.51 Groundmen...................$ 19.83 8.92 Linemen & Cable Splicers....$ 30.50 11.15
ELEC0071-004 12/29/2008
AUGLAIZE, CLINTON, DARKE, GREENE, LOGAN, MERCER, MIAMI,
MONTGOMERY, PREBLE, and SHELBY COUNTIES
Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15
ELEC0071-005 12/28/2009
ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN
Rates Fringes
LINE CONSTRUCTION: Equipment Operator DOT/Traffic Signal & Highway Lighting Projects...$ 28.39 11.49 Municipal Power/Transit Projects....................$ 33.33 12.67 LINE CONSTRUCTION: Groundman DOT/Traffic Signal & Highway Lighting Projects...$ 22.09 10.00 Municipal Power/Transit Projects....................$ 25.92 10.91
LINE CONSTRUCTION:
Linemen/Cable Splicer DOT/Traffic Signal & Highway Lighting Projects...$ 31.55 12.24 Municipal Power/Transit Projects....................$ 37.03 13.54
ELEC0071-008 12/29/2008
COLUMBIANA, MAHONING, and TRUMBULL COUNTIES
Rates Fringes
Line Construction Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15
ELEC0071-010 12/29/2008
BELMONT, CARROLL, HARRISON, HOLMES, JEFFERSON, MEDINA, PORTAGE,
STARK, SUMMIT, and WAYNE COUNTIES
Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15
ELEC0071-013 12/29/2008
BROWN, BUTLER, CLERMONT, HAMILTON, and WARREN COUNTIES
Rates Fringes
Line Construction Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15
ELEC0082-002 11/29/2010
CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN
(Wayne, Clear Creek & Franklin Townships)
ELECTRICIAN......................$ 27.30 14.93
ELEC0082-006 05/24/2004
CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN
(Wayne, Clear Creek & Franklin Townships)
Sound & Communication Technician Cable Puller................$ 9.14 4.91 Installer/Technician........$ 18.28 6.32
ELEC0129-003 03/01/2010
LORAIN (Except Columbia Township) & MEDINA (Litchfield & Liverpool Townships)
ELECTRICIAN......................$ 31.00 13.80
ELEC0129-004 03/01/2010
ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships)
ELECTRICIAN......................$ 31.00 13.80
ELEC0141-003 08/30/2010
BELMONT COUNTY
Rates Fringes
CABLE SPLICER....................$ 28.16 19.80
ELECTRICIAN......................$ 27.91 19.80
ELEC0212-003 01/01/2006
BROWN, CLERMONT & HAMILTON
Rates Fringes
Sound & Communication Technician.......................$ 20.45 6.95
ELEC0212-005 05/31/2010
BROWN, CLERMONT, and HAMILTON COUNTIES
Rates Fringes
ELECTRICIAN......................$ 26.11 14.34
ELEC0245-003 08/30/2009
DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA,
PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, and WOOD COUNTIES
Cable Splicer...............$ 35.85 20.25%+4.80+a Groundman/Truck Driver......$ 14.50 20.25%+4.80+a Heli-arc Welding............$ 31.47 20.25%+4.80+a Lineman.....................$ 33.15 20.25%+4.80+a Operator - Class 1..........$ 26.52 20.25%+4.80+a Operator - Class 2..........$ 23.21 20.25%+4.80+a Traffic Signal & Lighting Technician..................$ 29.84 20.25%+4.80+a
FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.
ELEC0246-006 11/01/2009
CARROLL (South of Fox, Harrison, Rose & Washington Townships), COLUMBIANA (South of Butler, Fairfield, Knox, Salem & Unity Townships), HARRISON, and JEFFERSON COUNTIES
ELECTRICIAN......................$ 33.00 22.77+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.
ELEC0306-005 05/31/2010
MEDINA (Brunswick, Chatham, Granger, Guilford, Harrisville, Hinckley, Homer, Lafayette, Medina, Montville, Sharon, Spencer, Wadsworth, Westfield & York Townships), PORTAGE (Atwater, Aurora, Brimfield, Deerfield, Franklin, Mantua, Randolph, Ravenna, Rootstown, Shalersville, Streetsboro & Suffield Townships), SUMMIT & WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton, & Wayne Townships)
CABLE SPLICER....................$ 36.39 5%+11.76
ELECTRICIAN......................$ 33.69 5%+11.76
ELEC0317-002 06/01/2010
GALLIA & LAWRENCE
Rates Fringes
CABLE SPLICER....................$ 32.68 18.13
ELECTRICIAN......................$ 31.87 19.46
ELEC0317-008 06/01/1998
ADAMS, ATHENS, GALLIA, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), LAWRENCE, MEIGS, PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships)
Cable Splicers..............$ 23.66 8.48 Equipment Operators.........$ 17.14 8.25 Groundmen...................$ 13.92 8.14 Linemen.....................$ 21.42 8.40
ELEC0540-003 06/05/1997
TUSCARAWAS COUNTY (North of Auburn, Clay, Rush & York Townships)
Rates Fringes
Line Construction Groundman; & Truck Driver...$ 14.65 8.18 Line Equipment Operator.....$ 19.02 8.69 Lineman; & Cable Splicer....$ 21.86 9.01
ELEC0540-005 12/27/2010
CARROLL (Northern half, including Fox, Harrison, Rose & Washington Townhships), COLUMBIANA (Knox Township), HOLMES, MAHONING (Smith Township), STARK, TUSCARAWAS (North of Auburn, Clay, Rush & York Townships), and WAYNE (South of Baughman, Chester, Green & Wayne Townships) COUNTIES
ELECTRICIAN......................$ 27.52 18.40
ELEC0573-003 11/29/2010
ASHTABULA (Colebrook, Wayne, Williamsfield, Orwell & Windsor Townships), GEAUGA (Auburn, Middlefield, Parkman & Troy Townships), MAHONING (Milton Township), PORTAGE (Charlestown, Edinburg, Freedom, Hiram, Nelson, Palmyra, Paris & Windham Townships), and TRUMBULL (Except Liberty & Hubbard Townships)
ELECTRICIAN......................$ 29.15 14.59
ELEC0575-001 05/31/2010
ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY (Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)
ELECTRICIAN......................$ 30.69 12.48
ELEC0648-001 09/06/2010
BUTLER and WARREN COUNTIES (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships)
CABLE SPLICER....................$ 29.17 12.69
ELECTRICIAN......................$ 28.67 12.69
ELEC0673-004 01/03/2011
ASHTABULA (Excluding Orwell, Colebrook, Williamsfield, Wayne & Windsor Townships), GEAUGA (Burton, Chardon, Claridon, Hambden, Huntsburg, Montville, Munson, Newbury & Thompson Townships) and
LAKE COUNTIES
CABLE SPLICER....................$ 32.19 16.18
ELECTRICIAN......................$ 31.94 16.17
ELEC0683-002 05/30/2011
CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON,
PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships), and
UNION COUNTIES
CABLE SPLICER....................$ 30.70 13.99
ELECTRICIAN......................$ 30.10 13.97
ELEC0688-003 01/05/2011
ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley & Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown & Jefferson Townships), MARION, MORROW, RICHLAND and WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)
ELECTRICIAN......................$ 26.25 14.30
ELEC0867-001 06/01/1998
ERIE
Rates Fringes
Line Construction Lineman; Cable Splicer; & Equipment Operator..........$ 20.75 4.09 Truck Driver (Winch) Groundman; & Groundman......$ 13.49 3.87
ELEC0972-002 06/01/2011
ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships), and WASHINGTON
COUNITES
CABLE SPLICER....................$ 31.59 20.11
ELECTRICIAN......................$ 31.34 20.10
ELEC1105-001 05/30/2010
COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College Townships), LICKING, MUSKINGUM, PERRY, and TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry & Bucks Townships) COUNTIES
ELECTRICIAN......................$ 27.19 13.49
ENGI0018-003 05/04/2011
ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA,
PORTAGE, and SUMMIT COUNTIES
OPERATOR: Power Equipment
GROUP 1.....................$ 31.48 12.80
GROUP 2.....................$ 31.38 12.80
GROUP 3.....................$ 30.34 12.80
GROUP 4.....................$ 29.12 12.80
GROUP 5.....................$ 23.83 12.80
GROUP 6.....................$ 31.73 12.80
GROUP 7.....................$ 31.98 12.80
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;
Crane (All Types, Including Boom Truck, Cherry Picker);
Crane-Compact, Track or Rubber over 4,000 lbs. capacity;
Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System);
Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge); Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper; Piledriving Machine (All Types);
Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work;
Rough Terrain Fork Lift with Winch/Hoist; Side-Boom;
Slip-Form Paver; Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; Wheel Excavator; and Asphalt Plant Engineer (Cleveland District Only).
GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Horizontal Directional Drill (Over 50,000 ft lbs thrust); Hydro Milling Machine; Kolman-type Loader (production type-Dirt);
Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications);
Material Transfer Equipment (Shuttle Buggy) Asphalt;
Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types;
Trench Machine (24" wide & under); Vermeer type Concrete Saw; and Maintenance Operators (Portage and Summit Counties Only).
GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer (Portage and Summit Counties Only); Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types);
Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs.
Pressure) Pump Operator installing & operating Well Points;
Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); Welding Machines; and Railroad Tie Inserter/Remover; Articulating/straight bed end dumps if assigned (minus $4.00 per hour.
GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine;
Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;
Farm-type Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types);
Forklift; Form Trencher; Hydro Hammer expect masonary;
Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver;
Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader;
Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.
GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonry Fork Lift;
Inboard-Outboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes - Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.
GROUP 6 - Master Mechanic & Boom from 150 to 180.
GROUP 7 - Boom from 180 and over.
ENGI0018-004 05/04/2011
ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN,
BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON,
COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD,
FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON,
HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES,
HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN,
LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE,
MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING,
PERRY, PICKAWAY, PIKE, PREBLE, PUTNAM, RICHLAND, ROSS,
SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN
WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, and
YANDOT COUNTIES
OPERATOR: Power Equipment
GROUP 1.....................$ 29.99 12.80
GROUP 2.....................$ 29.87 12.80
GROUP 3.....................$ 28.83 12.80
GROUP 4.....................$ 27.65 12.80
GROUP 5.....................$ 22.19 12.80
GROUP 6.....................$ 30.24 12.80
GROUP 7.....................$ 30.49 12.80
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;
Crane (All Types, Including Boom Truck, Cherry Picker);
Crane-Compact, Track or Rubber over 4,000 lbs. capacity;
Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge);
Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper;
Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver;
Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; and Wheel Excavator.
GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Hydro Milling Machine; Horizontal Directional Drill (over 50,000 ft. lbs.
thrust);Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24" wide & under); and Vermeer type Concrete Saw.
GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Railroad Tie Inserter/Remover; Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); and Welding Machines; Artiaculating/straight bed end dumps if assigned (minus $4.00 per hour.
GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine;
Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;
Farm-type Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift; Form Trencher; Hydro Hammer expect masonary; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader;
Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.
GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonary Forklift;
Inboard-Outboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes - Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.
GROUP 6 - Master Mechanic & Boom from 150 to 180.
GROUP 7 - Boom from 180 and over.
ENGI0066-023 06/01/2011
COLUMBIANA, MAHONING & TRUMBULL COUNTIES
Rates Fringes
OPERATOR: Power Equipment
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 1 - A & B.............$ 35.93 15.51
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 2 - A & B.............$ 35.60 15.51
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 3 - A & B.............$ 32.27 15.51
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 4 - A & B.............$ 28.49 15.51
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 5 - A & B.............$ 25.09 15.51
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 1 - C & D.............$ 32.93 15.51
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 2 - C & D.............$ 32.64 15.51
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 3 - C & D.............$ 29.58 15.51
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 4 - C & D.............$ 26.11 15.51
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 5 - C & D.............$ 23.00 15.51
ALL OTHER WORK
GROUP 1.....................$ 29.94 15.51
ALL OTHER WORK
GROUP 2.....................$ 29.67 15.51
ALL OTHER WORK
GROUP 3.....................$ 26.89 15.51
ALL OTHER WORK
GROUP 4.....................$ 23.74 15.51
ALL OTHER WORK
GROUP 5.....................$ 20.91 15.51
GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached
GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;
Boring Machine Attached to Tractor; Bullclam; Bulldozer;
C.M.I. Road Builder & Similar Type; Cable Placer & Layer;
Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;
Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;
Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;
Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;
Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile;
Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail;
Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;
Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;
Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine;
Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);
Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine;
Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing;
Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;
Tractor-Double Boom; Tractor with Attachments; Truck-Boom;
Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)
GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer;
Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork lift & Lulls; Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine; Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden);
Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist
GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor;
Curb Builder, self-propelled; Drill Wagon; Generator Set;
Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven;
Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller;
Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter;
Tractor; Trencher Form; Water Blaster; Steam Jenny;
Syphon; Vibrator-Gasoline; & Welding Machine
GROUP 5 - Brakeperson; Fireperson; & Oiler
IRON0017-002 05/01/2011
ASHTABULA (North of Route 6, starting at the Geauga County Line, proceeding east to State Route 45), CUYAHOGA, ERIE (Eastern 2/3), GEAUGA, HURON (East of a line drawn from the north border through Monroeville & Willard), LAKE, LORAIN, MEDINA (North of Old Rte. #224), PORTAGE (West of a line from Middlefield to Shalersville to Deerfield), and SUMMIT (North of Old Rte. #224, including city limits of Barberton) COUNTIES
IRONWORKER
Ornamental, Reinforcing, & Structural..................$ 30.40 17.90
IRON0017-010 05/01/2011
ASHTABULA (Eastern part from Lake Erie on the north to route #322 on the south to include Conneaut, Kingsville, Sheffield, Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont, Richmond, Andover & Williamsfield Townships)
Structural, including metal building erection.....$ 28.35 17.83 Structural,iexcluding metal building erection & Reinforcing.................$ 30.40 17.90
IRON0044-002 06/01/2009
CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line)
Fence Erector...............$ 23.55 16.72 Ornamental; Structural......$ 26.17 16.72
IRON0055-003 07/01/2010
CRAWFORD (Area Between lines drawn from where Hwy #598 & #30 meet through N. Liberty to the northern border & from said Hwy junction point due west to the border), DEFIANCE (S. of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), ERIE (Western 1/3), FULTON, HANCOCK, HARDIN (North of a line drawn from Maysville to a point 4 miles south of the northern line on the eastern line), HENRY, HURON (West of a line drawn from the northern border through Monroeville & Willard), LUCAS, OTTAWA, PUTNAM (East of a line drawn from the northern border down through Miller City to where #696 meets the southern border), SANDUSKY, SENECA, WILLIAMS (East of a line drawn from Pioneer through Stryker to the southern border), WOOD & WYANDOT (North of Rte.
#30)
Fence Erector...............$ 19.10 17.66 Flat Road Mesh..............$ 20.75 18.00 Tunnels & Caissons Under Pressure....................$ 28.50 18.00 All Other Work..............$ 28.00 18.69
IRON0147-002 06/01/2010
ALLEN (Northern half), DEFIANCE (Northern part, excluding south of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), MERCER (Northern half), PAULDING, PUTNAM (Western part, excluding east of a line drawn from the northern border down through Miller City to where #696 meets the southern border), VAN WERT, and WILLIAMS (Western part, excluding east of a line drawn from Pioneer through Stryker to the southern border) COUNTIES
IRONWORKER.......................$ 24.47 17.57
IRON0172-002 06/01/2010
CHAMPAIGN (Eastern one-third), CLARK (Eastern one-fourth), COSHOCTON (West of a line beginning at the northwestern county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN (Excluding a line drawn from Roundhead to Maysville), HIGHLAND (Eastern one-fifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, LOGAN (Eastern one-third), MADISON, MARION, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE (Northern half), ROSS, UNION, VINTON and WYANDOT (South of Rte. #30) COUNTIES
IRONWORKER.......................$ 26.52 16.48
IRON0207-004 06/01/2011
ASHTABULA (Southern part starting at the Geauga County line), COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224), PORTAGE (E. of a line from Middlefield to Shalersville to Deerfield) & TRUMBULL
Layout; Sheeter.............$ 28.06 18.46 Ornamental; Reinforcing;
Structural..................$ 27.06 18.46
IRON0290-002 10/01/2010
ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CHAMPAIGN (Excluding east of a line drawn from Catawla to the point where #68 intersects the northern county line), CLARK (Western two-thirds), CLINTON (Excluding south of a line drawn from Blanchester to Lynchburg), DARKE, GREENE, HIGHLAND (Inside lines drawn from Marshall to Lynchburg & from the northern county line through East Monroe to Marshall), LOGAN (West of a line drawn from West Liberty to where the northern county line meets the western county line of Hardin), MERCER (Southern half), MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN (Excluding south of a line drawn from Blanchester through Morrow to the western county line) COUNTIES
Beyond 25 mile radius of L.U. #290 Office, Dayton....$ 25.78 17.55 Within 25 mile radius of L.U. #290 Office, Dayton....$ 25.63 17.55
* IRON0372-002 06/26/2011
ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) and WARREN (South of a line drawn from Blanchester through Morrow to the west county line) COUNTIES
IRONWORKER, REINFORCING
Beyond 30-mile radius of Hamilton County Courthouse..$ 26.75 17.40 Up to & including 30-mile radius of Hamilton County Courthouse..................$ 26.50 17.40
IRON0549-003 12/01/2009
BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM
(Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border)
IRONWORKER.......................$ 29.75 15.69
IRON0550-004 05/01/2011
ASHLAND, CARROLL, COLUMBIANA (W. of a line from Damascus to Highlandtown), COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Rte. #224), MAHONING (S. of Old Rte.
#224), MEDINA (S. of Old Rte. #224), PORTAGE (S. of Old Rte.
#224), RICHLAND, STARK, SUMMIT (S. of Old Rte. #224, Excluding city limits of Barberton), TUSCARAWAS, & WAYNE
Ironworkers:Structural, Ornamental and Reinforcing.......$ 24.38 16.73
IRON0769-004 06/01/2011
ADAMS (Eastern Half), GALLIA, JACKSON (Southern Half), LAWRENCE
& SCIOTO
ZONE 1......................$ 30.96 18.07
ZONE 2......................$ 31.36 18.07
ZONE 3......................$ 32.96 18.07
ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.
ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.
ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., 1643 Greenup Ave.
IRON0787-003 06/01/2010
ATHENS, MEIGS, MORGAN, NOBLE, and WASHINGTON COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.67 17.05
LABO0265-008 05/01/2011
Rates Fringes
LABORER
ASHTABULA, ERIE, HURON,
LORAIN, LUCAS, MAHONING,
MEDINA, OTTAWA, PORTAGE,
SANDUSKY, STARK, SUMMIT,
TRUMBULL & WOOD COUNTIES
GROUP 1....................$ 26.25 8.75
GROUP 2....................$ 26.42 8.75
GROUP 3....................$ 26.75 8.75
GROUP 4....................$ 27.20 8.75
CUYAHOGA AND GEAUGA
COUNTIES ONLY: SEWAGE
PLANTS, WASTE PLANTS,
WATER TREATMENT
FACILITIES, PUMPING
STATIONS, & ETHANOL PLANTS
CONSTRUCTION................$ 28.86 8.75
CUYAHOGA, GEAUGA & LAKE
COUNTIES
GROUP 1....................$ 27.48 8.75
GROUP 2....................$ 27.65 8.75
GROUP 3....................$ 27.98 8.75
GROUP 4....................$ 28.43 8.75
REMAINING COUNTIES OF OHIO
GROUP 1....................$ 25.82 8.75
GROUP 2....................$ 25.99 8.75
GROUP 3....................$ 26.32 8.75
GROUP 4....................$ 26.77 8.75
LABORER CLASSIFICATIONS
GROUP 1 - Asphalt Laborer; Carpenter Tender; Concrete Curing Applicator; Dump Man (Batch Truck); Guardrail and Fence Installer; Joint Setter; Laborer (Construction); Landscape Laborer; Highway Lighting Worker; Signalization Worker;
Mesh Handlers & Placer; Right-of-way Laborer; Riprap Laborer & Grouter; Scaffold Erector; Seal Coating; Surface Treatment or Road Mix Laborer; Sign Installer; Slurry Seal;
Utility Man; Bridge Man; Handyman; Waterproofing Laborer;
Flagperson; Hazardous Waste (level D); Diver Tender; Zone Person & Traffic Control
GROUP 2 - Asphalt Raker; Concrete Puddler; Kettle Man Pipeline); Machine Driven Tools (Gas, Electric, Air); Mason Tender; Brick Paver; Mortar Mixer; Power Buggy or Power Wheelbarrow; Sheeting & Shoring Man; Surface Grinder Man;
Plastic Fusing Machine Operator; Pug Mill Operator; & Vacuum Devices (wet or dry); Rodding Machine Operator;
Diver; Screwman or Paver; Screed Person; Water Blast, Hand Held Wand; Pumps 4" & Under (Gas, Air or Electric) & Hazardous Waste (level C); Air Track and Wagon Drill;
Bottom Person; Cofferdam (below 25 ft. deep); Concrete Saw Person; Cutting with Burning Torch; Form Setter; Hand Spiker (Railroad); Pipelayer; Tunnel Laborer (without air) & Caisson; Underground Person (working in Sewer and Waterline, Cleaning, Repairing & Reconditioning);
Sandblaster Nozzle Person; & Hazardous Waste (level B)
GROUP 3 - Blaster; Mucker; Powder Person; Top Lander;
Wrencher (Mechanical Joints & Utility Pipeline); Yarner;
Hazardous Waste (level A); Concrete Specialist; Concrete Crew in Tunnels (With Air-pressurized - $1.00 premium);
Curb Setter & Cutter; Grade Checker; Utility Pipeline Tapper; Waterline; and Caulker
GROUP 4 - Miner (With Air-pressurized - $1.00 premium); & Gunite Nozzle Person
TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE
SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID
THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING.
PAIN0006-002 05/01/2008
ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. of the East-West Turnpike) & SUMMIT (N. of the East-West Turnpike)
PAINTER
COMMERCIAL NEW WORK;
REMODELING; & RENOVATIONS
GROUP 1....................$ 26.59 10.17
GROUP 2....................$ 26.99 10.17
GROUP 3....................$ 27.29 10.17
GROUP 4....................$ 28.29 10.17
COMMERCIAL REPAINT
GROUP 1....................$ 25.09 10.17
GROUP 2....................$ 25.49 10.17
GROUP 3....................$ 25.79 10.17
PAINTER CLASSIFICATIONS - COMMERCIAL NEW WORK; REMODELING; &
RENOVATIONS
GROUP 1 - Brush; & Roller
GROUP 2 - Sandblasting & Buffing
GROUP 3 - Spray Painting; Closed Steel Above 55 feet; Bridges & Open Structural Steel; Tanks - Water Towers; Bridge Painters; Bridge Riggers; Containment Builders
GROUP 4 - Bridge Blaster
PAINTER CLASSIFICATIONS - COMMERCIAL REPAINT
GROUP 1 - Brush; & Roller
GROUP 2 - Sandblasting & Buffing
GROUP 3 - Spray Painting
PAIN0007-002 07/01/2010
FULTON, HENRY, LUCAS, OTTAWA (Excluding Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genova) & WOOD
NEW COMMERCIAL WORK
GROUP 1....................$ 22.77 14.31
GROUP 2....................$ 23.02 14.31
GROUP 3....................$ 23.27 14.31
GROUP 4....................$ 23.37 14.31
GROUP 5....................$ 23.40 14.31
GROUP 6....................$ 23.52 14.31
GROUP 7....................$ 23.77 14.31
GROUP 8....................$ 24.52 14.31
GROUP 9....................$ 24.81 13.22
REPAINT IS 90% OF JR
PAINTER CLASSIFICATIONS
GROUP 1 - Brush; Spray & Sandblasting Pot Tender
GROUP 2 - Refineries & Refinery Tanks; Surfaces 30 ft. or over where material is applied to or labor performed on above ground level (exterior), floor level (interior)
GROUP 3 - Swing Stage & Chair
GROUP 4 - Lead Abatement
GROUP 5 - All Methods of Spray
GROUP 6 - Solvent-Based Catalized Epoxy Materials of 2 or More Component Materials, to include Solvent-Based Conversion Varnish (excluding water based)
GROUP 7 - Spray Solvent Based Material; Sand & Abrasive Blasting
GROUP 8 - Towers; Tanks; Bridges; Stacks Over 30 Feet
GROUP 9 - Epoxy Spray (excluding water based)
PAIN0012-008 06/01/2010
BUTLER COUNTY
Rates Fringes
PAINTER
GROUP 1.....................$ 20.27 8.10
GROUP 2.....................$ 22.85 8.10
GROUP 3.....................$ 23.25 8.10
GROUP 4.....................$ 23.60 8.10
GROUP 5.....................$ 23.85 8.10
PAINTER CLASSIFICATIONS
GROUP 1: Bridge Equipment Tender; Bridge/Containment Builder
GROUP 2: Brush & Roller
GROUP 3: Spray
GROUP 4: Sandblasting; & Waterblasting
GROUP 5: Elevated Tanks; Steeplejack Work; Bridge; & Lead Abatement
PAIN0012-010 06/01/2010
BROWN, CLERMONT, CLINTON, HAMILTON & WARREN
Rates Fringes
PAINTER
HEAVY & HIGHWAY BRIDGES-
GUARDRAILS-LIGHTPOLES-
STRIPING
Bridge Equipment Tender and Containment Builder....$ 20.27 8.10 Bridges when highest point of clearance is 60 feet or more; & Lead Abatement Projects.........$ 23.85 8.10 Brush & Roller.............$ 22.85 8.10 Sandblasting & Hopper Tender; Water Blasting.....$ 23.60 8.10 Spray......................$ 23.35 8.10
PAIN0012-014 11/01/2010
DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS
& UNION
Bridges.....................$ 33.35 9.37 Brush; Roller...............$ 23.87 9.37 Sandblasting;
Steamcleaning;
Waterblasting (3500 PSI or Over)& Hazardous Work.......$ 24.57 9.37 Spray.......................$ 24.37 9.37 Stacks; Tanks; & Towers.....$ 27.38 9.37 Structural Steel & Swing Stage.......................$ 24.17 9.37
PAIN0093-001 12/01/2010
ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE and
WASHINGTON COUNTIES
Bridges; Locks; Dams;
Tension Towers; & Energized Substations.......$ 28.03 13.11 Power Generating Facilities.$ 24.88 13.11
PAIN0249-002 05/01/2010
CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE
Rates Fringes
PAINTER
GROUP 1 - Brush & Roller....$ 22.29 8.60 GROUP 2 - Swing, Scaffold Bridges; Structural Steel;
Open Acid Tank; High Tension Electrical Equipment; & Hot Pipes......$ 22.70 8.60 GROUP 3 - Spray;
Sandblast; Steamclean;
Lead Abatement..............$ 23.04 8.60 GROUP 4 - Steeplejack Work..$ 23.24 8.60 GROUP 5 - Coal Tar..........$ 23.79 8.60 GROUP 6 - Bridge Equipment Tender & or Containment Builder.....................$ 25.88 860 GROUP 7 - Tanks, Stacks & Towers......................$ 26.28 8.60 GROUP 8 - Bridge Blaster, Rigger......................$ 32.25 8.60
PAIN0356-002 09/01/2009
KNOX, LICKING, MUSKINGUM, and PERRY
Rates Fringes
PAINTER
Bridge Equipment Tenders and Containment Builders....$ 27.93 7.25 Bridges; Blasters;
andRiggers..................$ 34.60 7.25 Brush and Roller............$ 20.93 7.25 Sandblasting; Steam Cleaning; Waterblasting;
and Hazardous Work..........$ 25.82 7.25 Spray.......................$ 21.40 7.25 Structural Steel and Swing Stage.......................$ 25.42 7.25 Tanks; Stacks; and Towers...$ 28.63 7.25
PAIN0438-002 12/01/2010
BELMONT, HARRISON and JEFFERSON COUNTIES
Rates Fringes
PAINTER
Bridges, Locks, Dams, Tension Towers & Energized Substations.................$ 28.33 11.40 Power Generating Facilities.$ 25.18 11.40
PAIN0476-001 06/01/2010
COLUMBIANA, MAHONING, and TRUMBULL COUNITES
Rates Fringes
PAINTER
GROUP 1.....................$ 23.20 9.60
GROUP 2.....................$ 23.40 9.60
GROUP 3.....................$ 23.41 9.60
GROUP 4.....................$ 23.85 9.60
GROUP 5.....................$ 23.85 9.60
GROUP 6.....................$ 24.10 9.60
GROUP 7.....................$ 24.28 9.60
PAINTER CLASSIFICATIONS:
GROUP 1:…