PROJECT 080002A DRAWINGS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| solicitation amendment 5.doc | DOC document | |
| Safety Health Plan Requirement.docx | DOCX document | |
| addendum.doc | DOC document | |
| ANSWERS TO CONTRACTOR QUESTIONS 3 MAR 2010.docx | DOCX document | |
| ANSWERS TO CONTRACTOR QUESTIONS 26 FEB 2010.docx | DOCX document | |
| solicitation amendment 4.doc | DOC document | |
| Answers to contractor questions.docx | DOCX document | |
| solicitation amendment 3..doc | DOC document | |
| 08-0002A Renovate Facility for EOD REFLECTED CEILING PLAN.pdf | ||
| Site Visit Sign In.pdf | ||
| solicitation amendment 2.doc | DOC document | |
| solicitation amendment.doc | DOC document | |
| WD OH29.dot | DOT file | |
| SOLICIT.pdf | ||
| WD OH29.mht | MHT file | |
| SPECS.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2" UNK
C
I
10" CI 58
C
C P
" V
C P
6" VCP
R34
831.27
4"
R220
829.0
6" VCP
V
C P
G27
830.4
G26
830.4
G28
832.10
G29
831.30
G30
834.7
" V
C P
A B
A N
D O
N E D
6"
4"
S-3
H
P S
.5
C
P R
.5
V
R
V
R .5
C
P R
.5
H
T H
W -R
.5
H
T H
W -S
1.5" HTHW-S
12" HTHW-S
12" HTHW-R
H
T H
W S
H
T H
W R
1.5" HTHW-S
6"
E-1 22-1
831.10
E-1 24-1
832.0
E-3
830.9
1-5
00-3 x
0x12-" x x x
S L
V
E-6 8-1
0.0
S L
V x
P
M
C M
V
1-1
12.5-3
1-2
25-3
L
V
YELLOW
SPRINGS
M A
D R
IV
E R
S T
IL
L W
A T E R
R
IV
E R
TROTWOOD
DAYTON
WRIGHT-
PATTERSON
AIR FORCE
BASE
G R
EA
T
M
IA
M I
R
IV
E R
75p
OAKWOOD
BEAVERCREEK
TO SPRINGFIELD
HUBER
HEIGHTS
VANDALIA
VICINITY MAP
NO SCALE
E-1 9-8
E-1 25-1
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V I
L E N G I N
E E
R
US AF
W PA F B
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DESIGN CHIEF
DRAWNDESIGNED CHECKED
0’ 10’ 20’ 40’ 80’
SCALE: 1" = 20’
5’
13C
11C
10C
ALLBROOK
D
RIV
E
P E
A R
S O
N
19C
GATE
3F 56
R O
A D
72A
STREET
WRIGHT
MILLER ROAD
35C
22C 35C
41C
JA
R
V
IS
21C
C
24C j
55C
25C
4C
R O
A D
A
VENUE
HARNESS R
OAD
GATE
2C
GATE
3C
GATE
4C
MAIN
GATE
1C
29C 209
55C
4C
4C
23C
B U
C K
N E
R
S P R
IN
G
E R
R O
A D
GREEN
OHIO AVE
CITY OF FAIRBORN
R
NO SCALE
WORK LOCATION MAP
NORTH
SHEET DESCRIPTIONPLATE
TITLE SHEET & SITE/LOCATION PLANSFP-1
FP-2
INDEX
OF
DATE
FP-1
OCT 09
1 2
CJT/CJV CJT/CJV
RENOVATE FOR EOD SPRINKLERS
PROJECT NO. 080002A
S
NORTH
SCALE: 1" = 20’
SITE PLAN
IN
V. 8
22.1 (T
OP)
4" CIP
0+00 0+20 0+40 0+60 0+80
821821
S T
A
C O
N N
E C
T T
O E
X I S
T
C
I P
W I T
H T
E E
S T
A
V
C P
S A
N
S T
A
E D
G E
O F
W A
L K
S T
A
C O
M M
D U
C T
S T
A
P
R O
V P
I V
S T
A
P
R O
V B
E N
D
S T
A
N
A T
G
A S
S T
A
C
I P
W A
T E
R
S T
A
W
A L
L O
F B
L D
G
REMOVE/REPLACE 6"
CONC. FLOOR. PROV.
PVC SLEEVE AROUND
PROP. 6" DIP WATER
PROV. DIP WATER TO
MIN. 5 FT OUTSIDE
BLDG. WALL
BUILDING FLOOR
PROP. GRADE TO MATCH EXIST.
PROP. 6" PVC OR DIP
REPLACE WALK IN KIND
NAT. GAS
2" NAT. GAS
C O
M M
T
E L
V
C P S
A N
V
C P
S A
N
C
I P
W A
T E
R
PROP. 6" WATER
PROP. PIV
NOTE: HYDRANT FLOW TEST COMPLETED
JUNE 2006 RESULTS -
STATIC AT HYD # 57 = 55 PSI
RESIDUAL AT HYD # 57 = 42 PSI
FLOW AT HYD # 58 = 860 GPM
CALCULATED FLOW AT 20 PSI
RESIDUAL = 1,467 GPM
CONTRACTOR SHALL PERFORM HYDRANT
FLOW TEST TO VERIFY/UPDATE THESE
RESULTS AND DESIGN THE SPRINKLER
SYSTEM ACCORDINGLY.
REPLACE CURB/GUTTER
IN KIND. REPLACE 7"
THICK ASPHALT (ODOT448)
AND 9" THICK BASE
(ODOT 304) IN KIND.
SAW CUT TO REMOVE
AND SEAL ALL JOINTS.
SEE SHEET FP-2 FOR
CONTINUATION
WATER LINE PROFILE
RENOVATE FOR EOD SPRINKLERS
PROJECT # 080002A; F/30163
TITLE SHEET/SITE PLAN
CONNECTION POINT - NEW TO EXISTING
LEGEND
F/30163
SPRINKLER PLAN
REPLACE BUSHES
IN KIND
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V I
L E N G I N
E E
R
US AF
W PA F B
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
DN
DN
FIRST FLOOR
BELOW
FIRST FLOOR
BELOW
GARAGE
GARAGE
GARAGE
UP
UP
UP
10’0’ 20’ 40’ þÿ�S�C�A�L�E�:� �
FIRST FLOOR PLAN
þÿ�S�C�A�L�E�:� � þÿ�S�C�A�L�E�:� �
1.
4.
SPRINKLERS ARE NOT REQUIRED ABOVE THE DROP CEILING.
2.
6.
7.
11.
12.
14.
10.
13.
ALL PIPING SHALL BE CONCEALED ABOVE DROP CEILING WHERE ONE EXISTS.
SEAL ALL PENETRATIONS IN STAIRWELLS WITH MATERIAL OF EQUAL FIRE RESISTANCE.
PAINT ALL SPRINKLER PIPING INSTALLED IN AREAS WITHOUT A DROP CEILING. SEE PROJECT
SPECIFICATIONS FOR PAINTING REQUIREMENTS.
HYDRAULIC CALCULATIONS SHALL BE MADE TO VERIFY ADEQUACY OF THE SYSTEM AND PIPE
SIZING. USE A ORDINARY HAZARD, GROUP 1 CLASSIFICATION FOR HOSE FLOW IN THE
CALCULATION. CALCULATIONS SHALL BE INCLUDED WITH INSTALLATION DRAWINGS
SUBMITTED FOR REVIEW.
15.
8.
THE SPRINKLER SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE
MINIMUM REQUIREMENTS OF NFPA 13, LATEST EDITION, EXCEPT THAT THE DESIGN DENSITY,
DESIGN AREA, HOSE STREAM ALLOWANCE AND DURATION OF SUPPLY REQUIREMENTS MUST
BE IN ACCORDANCE WITH TABLE 4-1 OF THE UFC 3-600-01. ALL ADVISORY PORTIONS OF
THE STANDARD SHALL BE CONSIDERED MANDATORY.
NOTE:
5.
3.
ALL WET-PIPE SPRINKLER SYSTEMS MUST BE PROVIDED WITH A LISTED ALARM CHECK VALVE
CONNECTED TO A FIRE ALARM PANEL AND ASSOCIATED TRIM PIPING.
ALL SPRINKLER SYSTEMS MUST BE EQUIPPED WITH A "STORZ" TYPE FIRE DEPARTMENT
CONNECTION FOR A FIVE INCH (5") LARGE DIAMETER HOSE. USE A STORZ 30-DEGREE DOWNWARD
ANGLE FITTING. PROVIDE 24" MINIMUM CLEARANCE FROM THE GROUND TO THE BOTTOM OF THE
CONNECTION. ONE CONNECTION MAY FEED MULTIPLE SPRINKLER SYSTEMS.
ALL SPRINKLER SYSTEMS SHALL BE EQUIPPED WITH A BACKFLOW PREVENTION DEVICE OF
THE TYPE REQUIRED FOR THE GIVEN CONDITIONS IN ACCORDANCE WITH ALL NFPA AND UFC
REQUIREMENTS. AS A MINIMUM, A DOUBLE CHECK VALVE TYPE DEVICE IS REQUIRED FOR
SPRINKLER SYSTEMS. THE DEVICE SHALL BE INSTALLED WITHIN 36 INCHES FROM WHERE
THE FIRE SERVICE ENTERS THE FACILITY. ALL BACKFLOW PREVENTERS SHALL BE
ELECTRICALLY SUPERVISED BY THE FIRE ALARM CONTROL PANEL.
PROVIDE AN ELECTRICALLY SUPERVISED PIV.
A MINIMUM CLEARANCE OF ONE METER (THREE FEET) SHALL BE PROVIDED ON ALL SIDES OF
FIRE PROTECTION SPRINKLER RISERS, VALVES, CHECK VALVES AND SIMILAR DEVICES TO
FACILITATE MAINTENANCE. ALL SUCH DEVICES SHALL BE LOCATED WITHIN 1.5 METERS
(FIVE FEET) ABOVE THE FINISHED FLOOR. CHECK VALVES AND OTHER DEVICES REQUIRING
REGULAR MAINTENANCE SHALL NOT BE LOCATED ABOVE DROP CEILINGS.
IF ADDITIONAL SUSPECT HAZARDOUS MATERIALS (ASBESTOS,
PCB, ETC.) NOT IDENTIFIED ON DRAWINGS ARE ENCOUNTERED,
THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THAT
AREA AND NOTIFY THE CONTRACTING OFFICER.
ALL PAINTED SURFACES CONTAIN LEAD. ANY WORK
PERTAINING TO DISTURBING LEAD CONTAINING PAINT,
REMEDIATION OR ABATEMENT SHALL BE PERFORMED IN
ACCORDANCE WITH SPECIFICATION SECTION 02 09 00.
SUBMIT A SEDIMENT EROSION PROTECTION PLAN AND STORM
WATER POLLUTION PREVENTION PLAN TO THE 88 ABW/CEV
(THROUGH THE CONTRACTING OFFICER) FOR APPROVAL PRIOR
TO THE DISTURBANCE OF ANY SOIL. EROSION CONTROL
MEASURES MUST BE IMPLEMENTED FOR PROJECTS THAT ALSO
DISTURB LESS THAN ONE ACRE. FOR PROJECTS DISTURBING
GREATER THAN ONE ACRE, A NOTICE OF INTENT (NOI) MUST BE
APPROVED BY THE OHIO EPA PRIOR TO THE DISTURBANCE OF
ANY SOIL PER SPECIFICATION SECTION 01 02 20 PARAGRAPH
3.04.C.
ALL ENVIRONMENTAL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20
AND ALL OTHER APPLICABLE SPECIFICATION SECTIONS AS
WELL AS ALL FEDERAL, STATE AND LOCAL REGULATIONS IN
EFFECT AT THE TIME THE WORK IS TO BE ACCOMPLISHED.
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING DIMENSIONS,
UTILITY LOCATIONS AND OTHER CONDITIONS. NOTIFY THE
CONTRACTING OFFICER OF ANY DIFFERING CONDITIONS OR
DISCREPANCIES PRIOR TO BEGINNING WORK.
EXISTING UTILITIES AND STRUCTURES MUST BE PROTECTED
AT ALL TIMES DURING CONSTRUCTION. COORDINATE ANY
NEEDED UTILITY OUTAGES WITH THE INSPECTION MANAGER.
2.
3.
4.
5.
6.
7.
FIRE PROTECTION NOTES
16.
17.
18.
19.
20.
21.
22.
RENOVATE FOR EOD SPRINKLERS
PROJECT # 080002A; F/30163
SPRINKLER PLAN
FP-2
CJT OCT 09
2 2
B F
P
NEW UNDERGROUND FIRE
SERVICE TO BLDG. SEE
SHT. FP-1 FOR CON’T.
PROVIDE DOUBLE CHECK VALVE
BACKFLOW PREVENTER.
PROPOSED RISER LOCATION.
THE FOLLOWING DATA IS FOR REFERENCE ONLY AND DOES NOT EXEMPT THE CONTRACTOR
FROM PERFORMING FLOW TESTS (NOTE #13 ABOVE): WATER FLOW TEST AT FLOW HYDRANT
#58 AND MEASUREMENT HYDRANT #57 DATED JUNE 2006: STATIC PRESSURE = 55 PSI.
FLOW = 860 GPM. RESIDUAL = 42 PSI.
MINUTES
SUPPLY DURATION
75030000.30
GROUP 2
EXTRA HAZARD
GROUP 1
0.40 3000 750
SPRINKLER SYSTEM & WATER SUPPLY REQUIREMENTS
SPACE TAG
EXTRA HAZARD
GROUP 2
ORDINARY HAZARD
GROUP 1
ORDINARY HAZARD
LIGHT HAZARD
CLASSIFICATION
OCCUPANCY DESIGN AREADESIGN DENSITY
GPM/SQ. FT.
0.20
0.15
0.10
HOSE STREAM
SQ. FT.
GPM
60LH
OH1
OH2
EH1
EH2
* DO NOT REDUCE DESIGN AREA FOR QUICK RESPONSE SPRINKLERS UNLESS
APPROVED BY BASE FIRE PROTECTION ENGINEER.
* MAXIMUM COVERAGE PER SPRINKLER IS 225 SQUARE FEET FOR LIGHT
HAZARD AND 130 SQUARE FEET FOR ORDINARY HAZARD.
LH
OH1
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LHLH
OH1
OH1
LH
OH1
LH
LH
LH
OH1
LH
LH
LH
LH
LH
LH
LH
LH
5’
PROVIDE SPRINKLER COVERAGE
FOR ALL AREAS WITHIN THIS
BOUNDARY. REFER TO FIRE
PROTECTION NOTE #2 THIS SHT.
PROVIDE SPRINKLER COVERAGE
FOR ALL AREAS WITHIN THIS
BOUNDARY. REFER TO FIRE
PROTECTION NOTE #2 THIS SHT.
9.
THE FIRE PROTECTION SPRINKLER CONTRACTOR SHALL
OBTAIN ALL NECESSARY PERMITS REQUIRED FOR THE
PERFORMANCE OF THIS CONTRACT. IT SHALL BE THE
CONTRACTOR’S RESPONSIBILITY TO PAY ALL PERMIT FEES.
COSTS FOR PERMITS SHALL BE CONSIDERED INCIDENTAL TO
THE PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE EXACT NUMBER AND LOCATIONS OF
SPRINKLER HEADS AND EXACT PIPE SIZING BASED ON HYDRAULIC CALCULATIONS. MINIMUM
BRANCH PIPE SIZE SHALL BE 1".
WHERE THE LOCATION OF FIRE PROTECTION PIPING CONFLICTS WITH MECHANICAL SYSTEMS
OR DUCTWORK, THE MECHANICAL SYSTEMS OR DUCTWORK HAVE PRIORITY. COORDINATE
WITH THE MECHANICAL CONTRACTOR’S CONSTRUCTION MANAGER.
ROUTE HORIZONTAL PIPES PARALLEL TO WALLS AND ABOVE CEILINGS WHERE THEY EXIST.
COORDINATE THE LOCATION OF SPRINKLER HEADS WITH LIGHTS AND AIR SUPPLY
DIFFUSERS. CENTER SPRINKLER IN CEILING TILE WHEREVER POSSIBLE.
THE FIRE PROTECTION SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM
WATER FLOW TESTS FOR HYDRAULICALLY DESIGNED SYSTEMS. SCHEDULE FLOW TEST
WITH MR. FRANK BOAZ, 88 ABW/CECP, (937) 656-3586.
CJT/JJP
THE FIRST & SECOND FLOOR PLANS SHOWN ON THIS SHEET
ARE THE PROPOSED PLANS SUBMITTED BY APM. REFER TO FIRE
PROTECTION NOTE #3 THIS SHEET AND SPECIFICATION SECTION
01 01 00 PARAGRAPHS 1.06.A & 1.06.B.
PROVIDE A WET PIPE SPRINKLER SYSTEM FOR THE DESIGNATED AREAS SHOWN ON
THIS SHEET FOR THE FIRST AND SECOND FLOORS. HOWEVER, SIZE THE NEW
UNDERGROUND FIRE SERVICE MAIN (SEE SHT. FP-1), WET PIPE RISER AND MAINS TO
ALLOW FOR SPRINKLER COVERAGE TO THE ENTIRE BUILDING. PROVIDE ALL PIPING MAINS
REQUIRED TO MAKE THE PARTIAL BUILDING SPRINKLER SYSTEM OPERATIONAL. PROVIDE
CAPPED TEES WHERE REQUIRED ON SPRINKLER MAINS IN ORDER TO PROVIDE FUTURE
SPRINKLER COVERAGE TO THE REMAINING AREAS OF THE BUILDING NOT COVERED ON
THIS CONTRACT. REFER TO SPECIFICATION SECTION 01 01 00 PARAGRAPH 1.06.C.
SPRINKLER INSTALLATION IS TO BE CONCURRENT WITH WORK PERFORMED BY OTHER
CONTRACTORS IN THE BUILDING. REFER TO SPECIFICATION SECTION 01 01 00
PARAGRAPHS 1.06.A & 1.06.B.
SECOND FLOOR PLAN
SYSTEM
INPUTS
REQUIRED SYSTEM OUTPUTS
MANUAL FIRE ALARM BOX
SPRINKLER WATERFLOW
MASS NOTIFICATION SYSTEM
INPUT OR ACTUATION OF
LOCAL MICROPHONE
SUPERVISORY
SIGNALS
ALARM SIGNALS
VALVE SUPERVISORY SWITCH
DUCT SMOKE DETECTOR
OPEN CIRCUIT
TROUBLE SIGNALS
CIRCUIT GROUND FAULT
AC POWER FAILURE
A C T U
A T E A
U D
IB
L E A
N D
V
IS
IB
L E F
IR
E
A L A
R M
N O
T
IF
IC
A
T
IO
N A
P P L
IA
N C E S
A C T U
A T E A
M B E R M
A S S N
O T
IF
IC
A
T
IO
N
S T R O
B E S
A C T U
A T E A
U D
IB
L E /V
IS
IB
L E A
L A
R M
IN
D
IC
A
T O
R A
T F
A C U
A C T U
A T E A
U D
IB
L E /V
IS
IB
L E
S U
P E R V
IS
O
R Y
I N
D
IC
A T O
R A
T F
A C U
A C T U
A T E A
U D
IB
L E /V
IS
IB
L E T
R O
U B L E
IN
D
IC
A
T O
R A
T F
A C U
P R O
V
ID
E D
E V
IC
E /C
IR
C U
IT
I N
D
IC
A T
IO
N
A T F
A C U
IN
T E R R U
P T O
P E R A
T
IO
N O
F A
U D
IB
L E
F
IR
E A
L A
R M
S
IG
N A
L
T R A
N S M
IT
A
L A
R M
S
IG
N A
L T
O F
IR
E
D E P A
R T M
E N
T A
L A
R M
R E C E
IV
IN
G
S T A
T
IO
N
T R A
N S M
IT
S
U P E R V
IS
O
R Y
S
IG
N A
L T
O F
IR
E
D E P A
R T M
E N
T A
L A
R M
R E C E
IV
IN
G
S T A
T
IO
N
T R A
N S M
IT
T
R O
U B L E S
IG
N
A L T
O F
IR
E
D E P A
R T M
E N
T A
L A
R M
R E C E
IV
IN
G
S T A
T
IO
N
S H
U T D
O W
N A
F F E C T E D
A
IR
H A
N D
IN
G
U N
IT
(S
C L O
S E F
IR
E A
N D
S M
O K
E D
A M
P E R S
IN
H
V A
C S
Y S T E M
T R A
N S F E R F
IR
E A
L A
R M
S Y
S T E M
T O
S E C O
N D
A R Y
P O
W E R
ANNUNCIATION/INDICATION
TRANSMISSION
FIRE/MNS
OPERATIONS
MATRIX
AREA SMOKE DETECTOR
NON-EMERGENCY VOICE PAGE
FROM LOCAL MICROPHONE
A C T U
A T E S
P E A
K E R C
IR
C U
IT
S W
IT
H
O U
T
A C T U
A T
IO
N O
F A
N Y
V
IS
IB
L E A
P P L
IA
N C E S
OFF PREMISES
SIGNAL
ANCILLARY
FUNCTIONS
ALL AUTOMATIC SPRINKLER SYSTEMS MUST BE EQUIPPED WITH WATER FLOW ALARMS THAT
TRANSMIT A SIGNAL TO THE BASE FIRE DEPARTMENT. QUANTITY AND LOCATIONS OF FLOW
SWITCHES AND ACCOMPANYING SUPERVISED VALVES SHALL BE PER NFPA, UFC, AND IBC AS
A MINIMUM. ADDITIONAL FLOW SWITCHES AND TAMPER SWITCHES SHALL BE PROVIDE
ANNUNCIATION ON A PER FLOOR/PER BUILDING WING LEVEL. REFER TO FIRE OPERATIONS
MATRIX THIS SHEET.
ALL SPRINKLER CONTROL VALVES SHALL BE ELECTRICALLY SUPERVISED BY THE FIRE ALARM
CONTROL PANEL. REFER TO FIRE OPERATIONS MATRIX THIS SHEET.
THE FIRE PROTECTION (SPRINKLER) CONTRACTOR SHALL PROVIDE ALL CONDUIT, WIRE,
CABLE, EQUIPMENT AND ACCESSORIES REQUIRED TO PROVIDE A COMPLETE WORKING
SYSTEM IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, WHETHER SHOWN ON
THE DRAWINGS OR NOT.
23.
24. ALL ELECTRICAL INSTALLATIONS SHALL MEET THE REQUIREMENTS OF THE NATIONAL
ELECTRIC CODE NFPA 70-2008 AND NFPA 72 2010.
NORTH
NORTH
BUILDING CONSTRUCTION IS STEEL REINFORCED CONCRETE FLOORS AND ROOF. EXTERIOR
WALLS ARE CONCRETE BLOCK W/FACE BRICK. INTERIOR WALLS ASSUMED TO BE CONCRETE
BLOCK FLOOR TO DECK.
ORDINARY RATED, QUICK RESPONSE SPRINKLER HEADS SHALL BE USED THROUGHOUT THE
BUILDING, EXCEPT AS NOTED. TEMPERATURE RATING IS 165^F. CEILING AREAS SHALL USE
RECESSED PENDANT SPRINKLER HEADS, WHILE EXPOSED AREAS SHALL USE UPRIGHT SPRINKLER
HEADS.
| FP-1 |
| 2.pdf |
| FP-2 |
| 2.pdf |
| FP-2 |