ANSWERS TO CONTRACTOR QUESTIONS 3 MAR 2010.docx

DOCX document 12 KB Posted

Attached to
RECOVERY--PROJECT NUMBER ZHTV080002A, Provide Sprinkler System F/30163
Solicitation number
FA8601-10-R-0011
Issued by

About this file

No more questions will be answered. These are the final questions and answers. Thanks.

View the file

Other files

File Type Posted
solicitation amendment 5.doc DOC document
Safety Health Plan Requirement.docx DOCX document
addendum.doc DOC document
ANSWERS TO CONTRACTOR QUESTIONS 26 FEB 2010.docx DOCX document
solicitation amendment 4.doc DOC document
Answers to contractor questions.docx DOCX document
solicitation amendment 3..doc DOC document
08-0002A Renovate Facility for EOD REFLECTED CEILING PLAN.pdf PDF
Site Visit Sign In.pdf PDF
solicitation amendment 2.doc DOC document
solicitation amendment.doc DOC document
WD OH29.dot DOT file
SOLICIT.pdf PDF
DRWGS.pdf PDF
WD OH29.mht MHT file
SPECS.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES TO CONTRACTOR QUESTIONS

3/3/10

- Is all pipe to be a minimum of schedule 40 ( this has been a base minimum)? The specifications would allow less as currently written.

FOLLOW THE SPECIFICATIONS. SPECIFICATION SECTION 21 13 13.00 10 PARAGRAPH 2.5.1.1 FOR ABOVEGROUND PIPING.

- Is Seismic restraints required?

NO.

- Is an Alarm valve required in the riser? (not shown on plans but is usual required)

YES, PER SPECIFICATIONS.

- Is a full size(size of backflow preventer) test connection located on the exterior of the building required for testing the backflow preventer? (not shown on plans but is usual required)

NOT SURE WHAT YOU ARE ASKING HERE. WPAFB DOES NOT HAVE TEST CONNECTIONS FOR BACKFLOW PREVENTERS ON THE EXTERIOR OF BUILDINGS. SO THE ANSWER IS NO.

- Who is responsible for installing conduit and wiring between the exterior post indicator, riser flow switch and the fire alarm panel?

THE FIRE PROTECTION CONTRACTOR. REFER TO FIRE PROTECTION NOTE #23 SHT. FP-2.

- If we are required to do this where is the fire alarm panel?

WILL HAVE TO COORDINATE WITH APM (CONTRACTOR PROVIDING THE F.A.P.). REFER TO FIRE PROTECTION NOTE #3 SHT. FP-2, AND SPECIFICATION SECTION 01 01 00 PARAGRAPH 1.06.

- Are we required to paint all exposed piping?

YES. REFER TO FIRE PROTECTION NOTE #12 SHT. FP-2.

-The design area is 3000 sq ft, the area can only be reduced if "approved by a base fire protection engineer". Has design area reduction been approved for this project per UFC 3-600-01, 4-2.3.3.3?

UFC 3-600-01 AND NFPA 13 PART 11.2.3.2.3.1 ALLOWS AREA REDUCTION IN THE CALCULATIONS WHEN USING QUICK RESPONSE SPRINKLER HEADS.

- The drawings do not show an FDC connection. Please advise.

FIRE PROTECTION NOTE #17 SHT. FP-2 REQUIRES THE FDC. THIS WILL BE SHOWN ON THE SPRINKLER PIPING DRAWINGS PROVIDED BY THE CONTRACTOR, ACCORDING TO FIRE PROTECTION NOTES #'S 1 & 2, AND THE SPECIFICATIONS.

- The fire alarm system/panel and all wiring provided by others?

THE F.A.P. IS BEING PROVIDED BY APM. THE SPRINKLER CONTRACTOR IS RESPONSIBLE FOR CONNECTING THE DEVICES HE IS PROVIDING TO THIS PANEL. REFER TO FIRE PROTECTION NOTE #23 SHT. FP-2 AND SPECIFICATION SECTION 01 01 00 PARAGRAPH 1.06.

- Drawings indicate that exposed piping to be painted? By sprinkler contractor? If so, what color?

YES. REFER TO FIRE PROTECTION NOTE #12 SHT. FP-2 AND SPECIFICATION SECTION 09 90 00. COLOR IS RED.

- What is the manufacturer and model of the FACP (Fire Panel) being installed under the current renovation?

DO NOT KNOW. THE FIRE PROTECTION CONTRACTOR SHALL COORDINATE WITH APM PER FIRE PROTECTION NOTE #3 SHT. FP-2 AND SPECIFICATION SECTION 01 01 00 PARAGRAPH 1.06 FOR THIS INFORMATION.