Drawings.pdf
PDF 703 KB Posted
- Attached to
- RECOVERY--PROJECT NUMBER ZHTV071983R, Replace Windows Administration Facility Building 20039 Federal contract opportunity
- Solicitation number
- FA8601-10-B-0002
About this file
Attachment 2 Section J- Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum 1 Drawing.pdf | ||
| Amendment 2.pdf | ||
| Site Visit Questions and Answers.pdf | ||
| Wage Decision 25Jun2010.pdf | ||
| Addendum 1.pdf | ||
| Site Visit Attendance and Rules.pdf | ||
| Amendment 1.pdf | ||
| Wage Decision June 2010.pdf | ||
| Specifications.pdf | ||
| ZHTV071983R Solicitation.pdf | ||
| Wage.pdf | ||
| Safety Health Plan Requirement | — | |
| Submittal Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
B
G
MAIN
A
S T
R E
E T
FOURTH
GATE
B
GATE
1B
FIFTH
2B
45B
B
42B
41B
Monument flowerbed flowerbed
A
S T
R E E T
GATE
B
STREET
11A
STREET
4B
B
A18
D
G
18H
5 80
B
B
B
21606
MONOHAN WAY
B
S T
R E
E
D
R E
E T
B
SCALE:N.T.S.
SITE MAP
N
S
E
W SCALE:N.T.S.
VICINITY PLAN
RAMP UP
STEP UP
STEP UP
AREA 1
AREA 2
AREA 3
AREA 4AREA 5AREA 6AREA 7AREA 8 AREA 9
AREA
7B
TABLE OF CONTENTS
PAGE DESCRIPTION UPDATED DRAWN BY CHECKED BY
A-1 TITLE SHEET 10-20-09 J.LEVY S.BURNETT
PROJECT NO. 07-1983
PROJECT
LOCATION
N
S
E
W
A-2 FIRST FLOOR PLAN 10-20-09 J.LEVY S.BURNETT
COORDINATOR ENGINEERING CHIEF
BID SET
BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
A-1
SGB JAL SGB 04/08/10
REVISIONDATE
04/08/10
BUILDING 39
TITLE SHEET
REPLACE WINDOWS ADMINISTRATION FACILITY (BLDG 20039)
GENERAL NOTES:
1 USE PLYWOOD SHEATHING ON OPENINGS DURING
CONSTRUCTION.
2 PROTECT CARPET AND OTHER PERMANENT FINISHES.
3 INSTALL POLY BARRIER DURING CONSTRUCTION.
4 PERFORMANCE PERIOD WILL BE 180 DAYS.
5 ALL SEALANT SHALL BE INSTALLED PER INDUSTRY STANDARDS.
6 AS DIRECTED BY THE GOVERNMENT, THE CONTRACTOR SHALL
RELOCATE ALL MOVEABLE EQUIPMENT AND FURNITURE. CLEARED
AREA SHALL BE ADEQUATE TO ALLOW ACCESS TO WORK AREAS
AND RESTORED TO ORIGINAL CONFIGURATION WHEN WORK IS
COMPLETE.
7 GOVERNMENT WILL PROVIDE A SUITABLE STAGING AREA FOR
MATERIALS DURING VARIOUS PHASES OF THE PROJECT AT
BOTH INTERIOR AND EXTERIOR LOCATIONS.
8 NEW WINDOW FRAMES SHALL BE OF AN ALL ALUMINUM TYPE,
BUT WILL MAINTAIN THE EXISTING LOOK DUE TO HISTORICAL
NATURE OF THE BUILDING AND WILL BE AN EXACT PROFILE
MATCH TO THE EXISTING EXTRUSIONS.
9 WINDOWS THAT ARE CURRENTLY ABLE TO BE OPENED WILL BE
REPLACED BY A NEW OPERATING WINDOW. WINDOWS THAT
ARE CURRENTLY INOPERABLE WILL BE REPLACED BY A NEW
WINDOW IN KIND.
10 USER WILL BE RESPONSIBLE FOR REMOVING ALL PERSONAL
AND ELECTRONIC DEVICES FROM THE WORK AREA.
11 SCREENS WILL BE PROVIDED ON THE OPERATING WINDOWS
AND WILL INCLUDE WICKET SCREENS IN ORDER TO OPERATE
THE PROVIDED POSITIVE LOCKING HANDLES (ONE PER
OPERATING WINDOW).
12 INTERIOR PANE OF WINDOW WILL BE A LAMINATED GLASS.
13 INSULATED GLASS UNITS FOR THE WINDOWS WILL BE�"
THICK.
14 SINCE THE AQUATEX PRODUCT CANNOT BE LAMINATED THE
GLASS FOR 1 FOUR WINDOW WIDE OPENING
AT THE (EAST) MECHANICAL ROOM, WILL BE A�" INSULATED
GLASS UNIT WITH�" CLEAR ANNEALED OUTBOARD LITE AND
THE INBOARD LITE WILL BE�" LAMINATED WITH A .030" COOL
WHITE PVB INTERLAYER.
15 AREAS ABOVE THE INTERIOR CEILING WILL BE A�" THICK
INSULATED SPANDREL GLASS UNIT AND WILL CONSIST OF�"
CLEAR OUTBOARD LITE WITH A GREY CERAMIC FRIT ON THE #2
SURFACE AND�" CLEAR LAMINATED LITE FOR THE INBOARD.
16 NEW REPLACEMENT BRICK WILL BE A CLOSE MATCH TO
EXISTING STRUCTURAL BRICK, REVIEWED AND APPROVED
BY THE GOVERNMENT.
NEW WINDOWS NOTES
A. DEMOLITION:
1. REMOVE AND DISPOSE OF EXISTING WINDOWS. IF ACM HAS
BEEN FOUND THEN REMOVE AND DISPOSE OF PLYWOOD.
2. DESCALE, CLEAN, AND PREPARE WINDOW OPENINGS.
B. CONSTRUCTION
1. PRIME AND PAINT THE STEEL LINTELS.
2. PRIVIDE AND INSTALL NEW WINDOWS TO MATCH EXISTING.
3. PROVIDE AND INSTALL TRIM AND SEALANTS.
C. ALL WINDOWS AND DOORS ARE TO COMPLY WITH UNITFORM
FACILITIES CRITERIA (UFC 4 - 010-01). TABLE 2-1 "LOW" LEVEL
OF PROTECTION.
D. ALSO SEE "WINDOW NOTES" ON SHEET A-2.
LBP/MOLD/ASBESTOS NOTES:
A. DEMOLITION
1. TEST WINDOW CAULKING AND DEMO ACCORDINGLY.
2. SET UP PROPER CONTAINMENT IN EACH AREA.
3. SET UP AFD’S IN EACH AREA.
4. SET UP DECONTAMINATION ROOM IN EACH AREA.
5. REMOVE AND DISPOSE OF THE IDENTIFIED WALL AREAS IN
ORDER TO COMPLETE THE WINDOW INSTALLATION
INTERIOR CONSTRUCTION/EXTERIOR SILL NOTES:
A. DEMOLITION
1. REMOVE AND DISPOSE OF THE EXISTING WINDOW BLINDS.
2. REMOVE AND SAVE EXISTING CEILING AREAS WHERE ACCESS
WILL BE REQUIRED FOR WALL/WINDOW DEMOLITION.
B. CONSTRUCTION
1. INSTALL PLYWOOD INTO EACH OPENING (TEMPORARY).
2. PROVIDE AND INSTALL NEW BLINDS.
- NEW BLINDS WILL ONLY BE INSTALLED IN OFFICE AREAS
AND WILL BE IDENTICAL TO THE EXISTING
SOLAR BLINDS.
- MECHANICAL ROOM AND CLOSETS WILL NOT HAVE BLINDS.
3. BUILD NEW SOFFITS IN EACH AREA TO MATCH EXISTING
SOFFIT DETAIL.
4. PROVIDE AND INSTALL NEW LAMINATE WINDOW SILL TO
MATCH EXISTING.
5. REINSTALL GRID AND CEILING AS REQUIRED.
6. PROVIDE AND INSTALL NEW CONCRETE SILLS TO MATCH THE
EXISTING PROFILE. INSTALL ON�" DIA. THREADED RODS WITH
4" EMBED @ 16" O.C. ENSURE TOP TWO BRICK COURSES ARE
GROUTED SOLID. SET THREADED RODS IN EPOXY GROUT.
COORDINATOR ENGINEERING CHIEF
BID SET
BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
A-2
SCALE:�" = 1’-0"
AREA 2
AREA 3
AREA 4AREA 5AREA 6AREA 7AREA 8
AREA 9
AREA 1
FIRST FLOOR PLAN
BUILDING 39
FIRST FLOOR PLAN
7B
NOTES:
SGB JAL SGB 04/08/10
REVISIONDATE
04/08/10
N
S
E
W
AREA 7B
RECONSTRUCT MASONRY
TOWER (SEE NOTE 10)
BASE BID
O P
T I
O N
BASE BID
AREA 1 - MECHANICAL ROOM (OPTION 1)
A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. INSTALL NEW CONCRETE SILL
C. INSTALL NEW PLASTIC LAMINATE SILL ON INTERIOR
D. INSTALL EXISTING EXHAUST FAN IN SINGLE PANE OF NEW OF
SPANDREL. INSTALL NEW LOUVER.
E. INSTALL PARTITION WALL RETURNS BETWEEN MECHANICAL
ROOM AND ADJACENT ROOM - BREAK METAL DIVIDER.
F. REPAIR DRYWALL AND FRAMING ON NEW INTERIOR SILL
AND PERIMETER WALL RETURNS.
AREA 2 - OPEN OFFICE AREA (OPTION 1)
A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND INSTALL NEW CEILING TILE.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL NEW CONCRETE SILL.
E. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL. MATCH
EXISTING.
F. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
G. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
H. INSTALL NEW ROLLER SHADE.
I. REMOVE AND RE-INSTALL THREE (3) LIGHT FIXTURES.
AREA 3 - BREAK ROOM (BASE BID)
A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND INSTALL NEW CEILING TILE.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
E. INSTALL NEW CONCRETE SILL.
F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
I. INSTALL NEW ROLLER SHADE.
J. REMOVE AND RE-INSTALL ONE (1) LIGHT FIXTURES AND RE-LAMP.
AREA 4 - DIRECTOR’S OFFICE (BASE BID)
A. REMOVE WALL PAPER ON PERIMETER WALL.
B. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
C. USE PLYWOOD SHEATHING ON OPENINGS DURING CONSTRUCTION.
D. PROTECT CARPET AND OTHER PERMANENT FINISHES.
E. INSTALL NEW CEILING GRID THROUGHOUT.
F. REMOVE CHAIR RAIL ON PERIMETER WALL.
G. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
H. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
I. INSTALL NEW CONCRETE SILL.
J. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
K. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
L. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
M. INSTALL NEW ROLLER SHADE.
N. REMOVE AND RE-INSTALL FIVE (5) LIGHT FIXTURES.
AREA 5 - OFFICE (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND RE TILE AREA NEAR WINDOW.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
E. INSTALL NEW CONCRETE SILL.
F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
I. INSTALL NEW ROLLER SHADE.
J. REMOVE AND RE-INSTALL LIGHT FIXTURES AS REQUIRED.
AREA 6 - OFFICE (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND RE TILE AREA NEAR WINDOW.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
E. INSTALL NEW CONCRETE SILL.
F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
I. INSTALL NEW ROLLER SHADE.
J. ELECTRICAL WORK AS REQUIRED.
AREA 7 - CONFERENCE ROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. DEMO WALL INCLUDING SECTION ADJACENT TO MECHANICAL
ROOM (AREA 7B) AS NECESSARY
C. PATCH CEILING GRID AND TILES.
D. INSTALL NEW CONCRETE SILL.
E. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
F. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
G. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
H. INSTALL DRYWALL AT MECHANICAL ROOM AND REMAINING
TWO SIDES.
I. INSTALL WALL RETURNS BETWEEN CONFERENCE ROOM
AND MECHANICAL ROOM (7B) - BREAK METAL DIVIDER.
J. INSTALL NEW ROLLER SHADE.
K. ELECTRICAL WORK AS REQUIRED.
AREA 7B - MECHANICAL ROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. INSTALL NEW CONCRETE SILL CONTINUED FROM AREA 7
C. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
D. REPAIR DRYWALL TO NEW SILL AND SIDE WALL RETURN.
AREA 8 - BREAKROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. INSTALL NEW CONCRETE SILL.
C. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
D. REPAIR DRYWALL AND FRAMING TO NEW SILL AND SIDE
WALL RETURN.
AREA 9 - COMM. ROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. DEMO CEILING GRID AS REQUIRED AND REPLACE
C. INSTALL NEW CONCRETE SILL.
D. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
F. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
G. ELECTRICAL WORK AS REQUIRED.
EXTERIOR RENOVATION (BASE BID)
A. DEMOLISH AND REMOVE AN EIGHT (8) FOOT SECTION OF NE
TOWER. SAVE UNDAMAGED BRICK.
B. REMOVE DAMAGED BRICK SECTIONS WERE ACTIVE MOISTURE
PROBLEMS EXIST.
C. REMOVE EXISTING SEALANT WHERE TOWERS MEET THE VERTICAL
METAL SIDING.
D. SAWCUT FOR A REGLET IN BRICK FOR INSTALLATION OF NEW
FLASHING/COUNTER FLASHING.
E. RE-POINT MASONRY ON THE NE AND SW TOWERS.
F. INSTALL NEW EIGHT (8) FOOT SECTION OF TOWER AND PARAPET
CAP.
G. PROVIDE AND INSTALL NEW REGLET AND FLASHING TO TIE INTO
THE EXISTING VERTICAL METAL SIDING.
H. INSTALL NEW INDUSTRY SEALANT (SIKA CRACK-FIX OR
SIMILAR) WHERE TOWER MEETS BOND BEAM.
A
C
B
ED
9’-10"
17’-7"
20’-0"
8’-9"
7’-6"
SCALE:�" = 1’-0"
WINDOW TYPES
O P
T I
O N
B A
E
B I
D
A A C E C
B
D
B
B
WINDOW NOTES:
ONE WINDOW ON THE EAST ELEVATION WAS REPLACED IN 2005.
THE WINDOW IS DESCRIBED AS FOLLOWS:
MANUFACTURER: BOYD ALUMINUM MANUFACTURING
MODEL: 4300 PROJECT OUT
GRID�" (P-843) HISTORIC GRID
FINISH: CHAMPAGNE ANODIZED
THE REQUIRED WINDOWS WILL MATCH THE EXISTING BOYD
WINDOW EXACTLY. EQUAL PRODUCTS BY OTHER MANUFACTURERS
EXACTLY MATCHING APPEARANCE AND PERFORMANCE OF THE
EXISTING WINDOW WILL BE CONSIDERED.
NEW WINDOWS MUST MEET AT/FP REQUIREMENTS (DESIGN BASIS- LOW,
LEVEL OF PROTECTION - LOW). FRAMES WILL BE ANCHORED TO NEW
PRECAST CONCRETE AT THE SILL, STEEL LINTELS AT THE HEAD, AND
BRICK JAMBS THAT HAVE BEEN GROUTED SOLID. CONTRACTOR IS TO
PROVIDE CONNECTION/ANCHORAGE DETAILS FOR ALL THREE CONDITIONS
FOR GOVERNMENT APPROVAL PRIOR TO THE INSTALLATION.
| A1 |
| A2 |
File details come from the government source that posted it. Updated .