About this file

Attachment 2 Section J- Drawings

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY--PROJECT NUMBER ZHTV071983R, Replace Windows Administration Facility Building 20039, newest first.
File Type Posted
Addendum 1 Drawing.pdf PDF
Amendment 2.pdf PDF
Site Visit Questions and Answers.pdf PDF
Wage Decision 25Jun2010.pdf PDF
Addendum 1.pdf PDF
Site Visit Attendance and Rules.pdf PDF
Amendment 1.pdf PDF
Wage Decision June 2010.pdf PDF
Specifications.pdf PDF
ZHTV071983R Solicitation.pdf PDF
Wage.pdf PDF
Safety Health Plan Requirement —
Submittal Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

B

G

MAIN

A

S T

R E

E T

FOURTH

GATE

B

GATE

1B

FIFTH

2B

45B

B

42B

41B

Monument flowerbed flowerbed

A

S T

R E E T

GATE

B

STREET

11A

STREET

4B

B

A18

D

G

18H

5 80

B

B

B

21606

MONOHAN WAY

B

S T

R E

E

D

R E

E T

B

SCALE:N.T.S.

SITE MAP

N

S

E

W SCALE:N.T.S.

VICINITY PLAN

RAMP UP

STEP UP

STEP UP

AREA 1

AREA 2

AREA 3

AREA 4AREA 5AREA 6AREA 7AREA 8 AREA 9

AREA

7B

TABLE OF CONTENTS

PAGE DESCRIPTION UPDATED DRAWN BY CHECKED BY

A-1 TITLE SHEET 10-20-09 J.LEVY S.BURNETT

PROJECT NO. 07-1983

PROJECT

LOCATION

N

S

E

W

A-2 FIRST FLOOR PLAN 10-20-09 J.LEVY S.BURNETT

COORDINATOR ENGINEERING CHIEF

BID SET

BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

W PAFB

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

A-1

SGB JAL SGB 04/08/10

REVISIONDATE

04/08/10

BUILDING 39

TITLE SHEET

REPLACE WINDOWS ADMINISTRATION FACILITY (BLDG 20039)

GENERAL NOTES:

1 USE PLYWOOD SHEATHING ON OPENINGS DURING

CONSTRUCTION.

2 PROTECT CARPET AND OTHER PERMANENT FINISHES.

3 INSTALL POLY BARRIER DURING CONSTRUCTION.

4 PERFORMANCE PERIOD WILL BE 180 DAYS.

5 ALL SEALANT SHALL BE INSTALLED PER INDUSTRY STANDARDS.

6 AS DIRECTED BY THE GOVERNMENT, THE CONTRACTOR SHALL

RELOCATE ALL MOVEABLE EQUIPMENT AND FURNITURE. CLEARED

AREA SHALL BE ADEQUATE TO ALLOW ACCESS TO WORK AREAS

AND RESTORED TO ORIGINAL CONFIGURATION WHEN WORK IS

COMPLETE.

7 GOVERNMENT WILL PROVIDE A SUITABLE STAGING AREA FOR

MATERIALS DURING VARIOUS PHASES OF THE PROJECT AT

BOTH INTERIOR AND EXTERIOR LOCATIONS.

8 NEW WINDOW FRAMES SHALL BE OF AN ALL ALUMINUM TYPE,

BUT WILL MAINTAIN THE EXISTING LOOK DUE TO HISTORICAL

NATURE OF THE BUILDING AND WILL BE AN EXACT PROFILE

MATCH TO THE EXISTING EXTRUSIONS.

9 WINDOWS THAT ARE CURRENTLY ABLE TO BE OPENED WILL BE

REPLACED BY A NEW OPERATING WINDOW. WINDOWS THAT

ARE CURRENTLY INOPERABLE WILL BE REPLACED BY A NEW

WINDOW IN KIND.

10 USER WILL BE RESPONSIBLE FOR REMOVING ALL PERSONAL

AND ELECTRONIC DEVICES FROM THE WORK AREA.

11 SCREENS WILL BE PROVIDED ON THE OPERATING WINDOWS

AND WILL INCLUDE WICKET SCREENS IN ORDER TO OPERATE

THE PROVIDED POSITIVE LOCKING HANDLES (ONE PER

OPERATING WINDOW).

12 INTERIOR PANE OF WINDOW WILL BE A LAMINATED GLASS.

13 INSULATED GLASS UNITS FOR THE WINDOWS WILL BE�"

THICK.

14 SINCE THE AQUATEX PRODUCT CANNOT BE LAMINATED THE

GLASS FOR 1 FOUR WINDOW WIDE OPENING

AT THE (EAST) MECHANICAL ROOM, WILL BE A�" INSULATED

GLASS UNIT WITH�" CLEAR ANNEALED OUTBOARD LITE AND

THE INBOARD LITE WILL BE�" LAMINATED WITH A .030" COOL

WHITE PVB INTERLAYER.

15 AREAS ABOVE THE INTERIOR CEILING WILL BE A�" THICK

INSULATED SPANDREL GLASS UNIT AND WILL CONSIST OF�"

CLEAR OUTBOARD LITE WITH A GREY CERAMIC FRIT ON THE #2

SURFACE AND�" CLEAR LAMINATED LITE FOR THE INBOARD.

16 NEW REPLACEMENT BRICK WILL BE A CLOSE MATCH TO

EXISTING STRUCTURAL BRICK, REVIEWED AND APPROVED

BY THE GOVERNMENT.

NEW WINDOWS NOTES

A. DEMOLITION:

1. REMOVE AND DISPOSE OF EXISTING WINDOWS. IF ACM HAS

BEEN FOUND THEN REMOVE AND DISPOSE OF PLYWOOD.

2. DESCALE, CLEAN, AND PREPARE WINDOW OPENINGS.

B. CONSTRUCTION

1. PRIME AND PAINT THE STEEL LINTELS.

2. PRIVIDE AND INSTALL NEW WINDOWS TO MATCH EXISTING.

3. PROVIDE AND INSTALL TRIM AND SEALANTS.

C. ALL WINDOWS AND DOORS ARE TO COMPLY WITH UNITFORM

FACILITIES CRITERIA (UFC 4 - 010-01). TABLE 2-1 "LOW" LEVEL

OF PROTECTION.

D. ALSO SEE "WINDOW NOTES" ON SHEET A-2.

LBP/MOLD/ASBESTOS NOTES:

A. DEMOLITION

1. TEST WINDOW CAULKING AND DEMO ACCORDINGLY.

2. SET UP PROPER CONTAINMENT IN EACH AREA.

3. SET UP AFD’S IN EACH AREA.

4. SET UP DECONTAMINATION ROOM IN EACH AREA.

5. REMOVE AND DISPOSE OF THE IDENTIFIED WALL AREAS IN

ORDER TO COMPLETE THE WINDOW INSTALLATION

INTERIOR CONSTRUCTION/EXTERIOR SILL NOTES:

A. DEMOLITION

1. REMOVE AND DISPOSE OF THE EXISTING WINDOW BLINDS.

2. REMOVE AND SAVE EXISTING CEILING AREAS WHERE ACCESS

WILL BE REQUIRED FOR WALL/WINDOW DEMOLITION.

B. CONSTRUCTION

1. INSTALL PLYWOOD INTO EACH OPENING (TEMPORARY).

2. PROVIDE AND INSTALL NEW BLINDS.

- NEW BLINDS WILL ONLY BE INSTALLED IN OFFICE AREAS

AND WILL BE IDENTICAL TO THE EXISTING

SOLAR BLINDS.

- MECHANICAL ROOM AND CLOSETS WILL NOT HAVE BLINDS.

3. BUILD NEW SOFFITS IN EACH AREA TO MATCH EXISTING

SOFFIT DETAIL.

4. PROVIDE AND INSTALL NEW LAMINATE WINDOW SILL TO

MATCH EXISTING.

5. REINSTALL GRID AND CEILING AS REQUIRED.

6. PROVIDE AND INSTALL NEW CONCRETE SILLS TO MATCH THE

EXISTING PROFILE. INSTALL ON�" DIA. THREADED RODS WITH

4" EMBED @ 16" O.C. ENSURE TOP TWO BRICK COURSES ARE

GROUTED SOLID. SET THREADED RODS IN EPOXY GROUT.

COORDINATOR ENGINEERING CHIEF

BID SET

BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

W PAFB

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

A-2

SCALE:�" = 1’-0"

AREA 2

AREA 3

AREA 4AREA 5AREA 6AREA 7AREA 8

AREA 9

AREA 1

FIRST FLOOR PLAN

BUILDING 39

FIRST FLOOR PLAN

7B

NOTES:

SGB JAL SGB 04/08/10

REVISIONDATE

04/08/10

N

S

E

W

AREA 7B

RECONSTRUCT MASONRY

TOWER (SEE NOTE 10)

BASE BID

O P

T I

O N

BASE BID

AREA 1 - MECHANICAL ROOM (OPTION 1)

A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. INSTALL NEW CONCRETE SILL

C. INSTALL NEW PLASTIC LAMINATE SILL ON INTERIOR

D. INSTALL EXISTING EXHAUST FAN IN SINGLE PANE OF NEW OF

SPANDREL. INSTALL NEW LOUVER.

E. INSTALL PARTITION WALL RETURNS BETWEEN MECHANICAL

ROOM AND ADJACENT ROOM - BREAK METAL DIVIDER.

F. REPAIR DRYWALL AND FRAMING ON NEW INTERIOR SILL

AND PERIMETER WALL RETURNS.

AREA 2 - OPEN OFFICE AREA (OPTION 1)

A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. PAINT CEILING GRID AND INSTALL NEW CEILING TILE.

C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.

D. INSTALL NEW CONCRETE SILL.

E. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL. MATCH

EXISTING.

F. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.

G. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.

H. INSTALL NEW ROLLER SHADE.

I. REMOVE AND RE-INSTALL THREE (3) LIGHT FIXTURES.

AREA 3 - BREAK ROOM (BASE BID)

A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. PAINT CEILING GRID AND INSTALL NEW CEILING TILE.

C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.

D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND

ADJACENT OFFICE - BREAK METAL DIVIDER

E. INSTALL NEW CONCRETE SILL.

F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.

H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.

I. INSTALL NEW ROLLER SHADE.

J. REMOVE AND RE-INSTALL ONE (1) LIGHT FIXTURES AND RE-LAMP.

AREA 4 - DIRECTOR’S OFFICE (BASE BID)

A. REMOVE WALL PAPER ON PERIMETER WALL.

B. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

C. USE PLYWOOD SHEATHING ON OPENINGS DURING CONSTRUCTION.

D. PROTECT CARPET AND OTHER PERMANENT FINISHES.

E. INSTALL NEW CEILING GRID THROUGHOUT.

F. REMOVE CHAIR RAIL ON PERIMETER WALL.

G. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.

H. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND

ADJACENT OFFICE - BREAK METAL DIVIDER

I. INSTALL NEW CONCRETE SILL.

J. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

K. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.

L. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.

M. INSTALL NEW ROLLER SHADE.

N. REMOVE AND RE-INSTALL FIVE (5) LIGHT FIXTURES.

AREA 5 - OFFICE (BASE BID)

A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. PAINT CEILING GRID AND RE TILE AREA NEAR WINDOW.

C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.

D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND

ADJACENT OFFICE - BREAK METAL DIVIDER

E. INSTALL NEW CONCRETE SILL.

F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.

H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.

I. INSTALL NEW ROLLER SHADE.

J. REMOVE AND RE-INSTALL LIGHT FIXTURES AS REQUIRED.

AREA 6 - OFFICE (BASE BID)

A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. PAINT CEILING GRID AND RE TILE AREA NEAR WINDOW.

C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.

D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND

ADJACENT OFFICE - BREAK METAL DIVIDER

E. INSTALL NEW CONCRETE SILL.

F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.

H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.

I. INSTALL NEW ROLLER SHADE.

J. ELECTRICAL WORK AS REQUIRED.

AREA 7 - CONFERENCE ROOM (BASE BID)

A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. DEMO WALL INCLUDING SECTION ADJACENT TO MECHANICAL

ROOM (AREA 7B) AS NECESSARY

C. PATCH CEILING GRID AND TILES.

D. INSTALL NEW CONCRETE SILL.

E. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

F. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.

G. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.

H. INSTALL DRYWALL AT MECHANICAL ROOM AND REMAINING

TWO SIDES.

I. INSTALL WALL RETURNS BETWEEN CONFERENCE ROOM

AND MECHANICAL ROOM (7B) - BREAK METAL DIVIDER.

J. INSTALL NEW ROLLER SHADE.

K. ELECTRICAL WORK AS REQUIRED.

AREA 7B - MECHANICAL ROOM (BASE BID)

A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. INSTALL NEW CONCRETE SILL CONTINUED FROM AREA 7

C. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

D. REPAIR DRYWALL TO NEW SILL AND SIDE WALL RETURN.

AREA 8 - BREAKROOM (BASE BID)

A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. INSTALL NEW CONCRETE SILL.

C. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

D. REPAIR DRYWALL AND FRAMING TO NEW SILL AND SIDE

WALL RETURN.

AREA 9 - COMM. ROOM (BASE BID)

A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW

WINDOWS WITH THOSE ON NORTH ELEVATION.

B. DEMO CEILING GRID AS REQUIRED AND REPLACE

C. INSTALL NEW CONCRETE SILL.

D. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.

F. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.

G. ELECTRICAL WORK AS REQUIRED.

EXTERIOR RENOVATION (BASE BID)

A. DEMOLISH AND REMOVE AN EIGHT (8) FOOT SECTION OF NE

TOWER. SAVE UNDAMAGED BRICK.

B. REMOVE DAMAGED BRICK SECTIONS WERE ACTIVE MOISTURE

PROBLEMS EXIST.

C. REMOVE EXISTING SEALANT WHERE TOWERS MEET THE VERTICAL

METAL SIDING.

D. SAWCUT FOR A REGLET IN BRICK FOR INSTALLATION OF NEW

FLASHING/COUNTER FLASHING.

E. RE-POINT MASONRY ON THE NE AND SW TOWERS.

F. INSTALL NEW EIGHT (8) FOOT SECTION OF TOWER AND PARAPET

CAP.

G. PROVIDE AND INSTALL NEW REGLET AND FLASHING TO TIE INTO

THE EXISTING VERTICAL METAL SIDING.

H. INSTALL NEW INDUSTRY SEALANT (SIKA CRACK-FIX OR

SIMILAR) WHERE TOWER MEETS BOND BEAM.

A

C

B

ED

9’-10"

17’-7"

20’-0"

8’-9"

7’-6"

SCALE:�" = 1’-0"

WINDOW TYPES

O P

T I

O N

B A

E

B I

D

A A C E C

B

D

B

B

WINDOW NOTES:

ONE WINDOW ON THE EAST ELEVATION WAS REPLACED IN 2005.

THE WINDOW IS DESCRIBED AS FOLLOWS:

MANUFACTURER: BOYD ALUMINUM MANUFACTURING

MODEL: 4300 PROJECT OUT

GRID�" (P-843) HISTORIC GRID

FINISH: CHAMPAGNE ANODIZED

THE REQUIRED WINDOWS WILL MATCH THE EXISTING BOYD

WINDOW EXACTLY. EQUAL PRODUCTS BY OTHER MANUFACTURERS

EXACTLY MATCHING APPEARANCE AND PERFORMANCE OF THE

EXISTING WINDOW WILL BE CONSIDERED.

NEW WINDOWS MUST MEET AT/FP REQUIREMENTS (DESIGN BASIS- LOW,

LEVEL OF PROTECTION - LOW). FRAMES WILL BE ANCHORED TO NEW

PRECAST CONCRETE AT THE SILL, STEEL LINTELS AT THE HEAD, AND

BRICK JAMBS THAT HAVE BEEN GROUTED SOLID. CONTRACTOR IS TO

PROVIDE CONNECTION/ANCHORAGE DETAILS FOR ALL THREE CONDITIONS

FOR GOVERNMENT APPROVAL PRIOR TO THE INSTALLATION.

A1
A2

File details come from the government source that posted it. Updated .