Addendum 1- Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Decision 25Jun2010.pdf | ||
| Addendum 1.pdf | ||
| Amendment 2.pdf | ||
| Site Visit Questions and Answers.pdf | ||
| Site Visit Attendance and Rules.pdf | ||
| Wage Decision June 2010.pdf | ||
| Amendment 1.pdf | ||
| Specifications.pdf | ||
| Safety Health Plan Requirement | — | |
| Submittal Specifications.pdf | ||
| Drawings.pdf | ||
| ZHTV071983R Solicitation.pdf | ||
| Wage.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COORDINATOR ENGINEERING CHIEF
BID SET
BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
A-2
SCALE:�" = 1’-0"
AREA 2
AREA 3
AREA 4AREA 5AREA 6AREA 7AREA 8
AREA 9
AREA 1
FIRST FLOOR PLAN
BUILDING 39
FIRST FLOOR PLAN
7B
NOTES:
SGB JAL SGB 04/08/10
REVISIONDATE
04/08/10
N
S
E
W
AREA 7B
RECONSTRUCT MASONRY
TOWER (SEE NOTE 10)
BASE BID
O P
T I
O N
BASE BID
AREA 1 - MECHANICAL ROOM (OPTION 1)
A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. INSTALL NEW CONCRETE SILL
C. INSTALL NEW PLASTIC LAMINATE SILL ON INTERIOR
D. INSTALL EXISTING EXHAUST FAN IN SINGLE PANE OF NEW OF
SPANDREL. INSTALL NEW LOUVER.
E. INSTALL PARTITION WALL RETURNS BETWEEN MECHANICAL
ROOM AND ADJACENT ROOM - BREAK METAL DIVIDER.
F. REPAIR DRYWALL AND FRAMING ON NEW INTERIOR SILL
AND PERIMETER WALL RETURNS.
AREA 2 - OPEN OFFICE AREA (OPTION 1)
A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND INSTALL NEW CEILING TILE.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL NEW CONCRETE SILL.
E. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL. MATCH
EXISTING.
F. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
G. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
H. INSTALL NEW ROLLER SHADE.
I. REMOVE AND RE-INSTALL THREE (3) LIGHT FIXTURES.
AREA 3 - BREAK ROOM (BASE BID)
A. REMOVE EXISTING WINDOW AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND INSTALL NEW CEILING TILE.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
E. INSTALL NEW CONCRETE SILL.
F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
I. INSTALL NEW ROLLER SHADE.
J. REMOVE AND RE-INSTALL ONE (1) LIGHT FIXTURES AND RE-LAMP.
AREA 4 - DIRECTOR’S OFFICE (BASE BID)
A. REMOVE WALL PAPER ON PERIMETER WALL.
B. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
C. USE PLYWOOD SHEATHING ON OPENINGS DURING CONSTRUCTION.
D. PROTECT CARPET AND OTHER PERMANENT FINISHES.
E. INSTALL NEW CEILING GRID THROUGHOUT.
F. REMOVE CHAIR RAIL ON PERIMETER WALL.
G. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
H. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
I. INSTALL NEW CONCRETE SILL.
J. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
K. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
L. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
M. INSTALL NEW ROLLER SHADE.
N. REMOVE AND RE-INSTALL FIVE (5) LIGHT FIXTURES.
AREA 5 - OFFICE (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND RE TILE AREA NEAR WINDOW.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
E. INSTALL NEW CONCRETE SILL.
F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
I. INSTALL NEW ROLLER SHADE.
J. REMOVE AND RE-INSTALL LIGHT FIXTURES AS REQUIRED.
AREA 6 - OFFICE (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. PAINT CEILING GRID AND RE TILE AREA NEAR WINDOW.
C. DEMO 18" OF DRYWALL ON THREE (3) SIDES PLUS ENTIRE HEADER.
D. INSTALL WALL RETURNS BETWEEN BREAK ROOM AND
ADJACENT OFFICE - BREAK METAL DIVIDER
E. INSTALL NEW CONCRETE SILL.
F. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
G. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
H. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
I. INSTALL NEW ROLLER SHADE.
J. ELECTRICAL WORK AS REQUIRED.
AREA 7 - CONFERENCE ROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. DEMO WALL INCLUDING SECTION ADJACENT TO MECHANICAL
ROOM (AREA 7B) AS NECESSARY
C. PATCH CEILING GRID AND TILES.
D. INSTALL NEW CONCRETE SILL.
E. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
F. WRAP DRYWALL BACK TO WINDOW THREE (3) SIDES.
G. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
H. INSTALL DRYWALL AT MECHANICAL ROOM AND REMAINING
TWO SIDES.
I. INSTALL WALL RETURNS BETWEEN CONFERENCE ROOM
AND MECHANICAL ROOM (7B) - BREAK METAL DIVIDER.
J. INSTALL NEW ROLLER SHADE.
K. ELECTRICAL WORK AS REQUIRED.
AREA 7B - MECHANICAL ROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. INSTALL NEW CONCRETE SILL CONTINUED FROM AREA 7
C. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
D. REPAIR DRYWALL TO NEW SILL AND SIDE WALL RETURN.
AREA 9 - COMM. ROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. DEMO CEILING GRID AS REQUIRED AND REPLACE
C. INSTALL NEW CONCRETE SILL.
D. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
F. FRAME AND WRAP HEADER TO NEW MULLION LOCATION.
G. ELECTRICAL WORK AS REQUIRED.
A
C
B
ED
9’-10"
17’-7"
20’-0"
8’-9"
7’-6"
SCALE:�" = 1’-0"
WINDOW TYPES
O P
T I
O N
B A
S E
B I
D
A A C E C
B
D
B
B
EXTERIOR RENOVATION (BASE BID)
A. DEMOLISH AND REMOVE AN EIGHT (8) FOOT SECTION OF NE
TOWER. SAVE UNDAMAGED BRICK.
B. REMOVE DAMAGED BRICK SECTIONS WERE ACTIVE MOISTURE
PROBLEMS EXIST.
C. REMOVE EXISTING SEALANT WHERE TOWERS MEET THE VERTICAL
METAL SIDING.
D. SAWCUT FOR A REGLET IN BRICK FOR INSTALLATION OF NEW
FLASHING/COUNTER FLASHING.
E. RE-POINT MASONRY ON THE NE TOWER.
F. INSTALL NEW EIGHT (8) FOOT SECTION OF TOWER AND PARAPET
CAP.
G. PROVIDE AND INSTALL NEW REGLET AND FLASHING TO TIE INTO
THE EXISTING VERTICAL METAL SIDING.
H. INSTALL NEW INDUSTRY SEALANT (SIKA CRACK-FIX OR
SIMILAR) WHERE TOWER MEETS BOND BEAM.
06/29/10 ADDENDUM 1
AREA 8 - BREAKROOM (BASE BID)
A. REMOVE EXISTING WINDOWS AND INSTALL NEW. MATCH NEW
WINDOWS WITH THOSE ON NORTH ELEVATION.
B. INSTALL NEW CONCRETE SILL.
C. INSTALL NEW PLASTIC LAMINATE INTERIOR SILL.
D. REPAIR DRYWALL AND FRAMING TO NEW SILL AND SIDE
WALL RETURN.
E. INSTALL NEW ROLLER SHADE
WINDOW NOTES:
ONE WINDOW ON THE EAST ELEVATION WAS REPLACED IN 2005.
THE WINDOW IS DESCRIBED AS FOLLOWS:
MANUFACTURER: BOYD ALUMINUM MANUFACTURING
MODEL: 4300 PROJECT OUT
GRID�" (P-843) HISTORIC GRID
FINISH: CHAMPAGNE ANODIZED
THE REQUIRED WINDOWS WILL MATCH THE EXISTING BOYD
WINDOW APPEARANCE EXACTLY, BUT MUST MEET AT/FP
REQUIREMENTS.EQUAL PRODUCTS BY OTHER MANUFACTURERS
EXACTLY MATCHING APPEARANCE AND PERFORMANCE OF THE
EXISTING WINDOW WILL BE CONSIDERED.
NEW WINDOWS MUST MEET AT/FP REQUIREMENTS (DESIGN
BASIS- LOW, LEVEL OF PROTECTION - LOW, 82 FT STAND-OFF
DISTANCE). FRAMES WILL BE ANCHORED TO NEW PRECAST
CONCRETE AT THE SILL, STEEL LINTELS AT THE HEAD, AND
BRICK JAMBS THAT HAVE BEEN GROUTED SOLID. CONTRACTOR
IS TO PROVIDE CONNECTION/ANCHORAGE DETAILS FOR ALL
THREE CONDITIONS FOR GOVERNMENT APPROVAL PRIOR TO
THE INSTALLATION.
addA2